Fwd: New Leaks overnight

0 views
Skip to first unread message

A. Eng

unread,
Nov 16, 2018, 10:00:00 AM11/16/18
to dekal...@googlegroups.com, A_albiee albie, Kelly Horrigan, Nate Kessman
This is the email from our Tentant, Michel,  we need a temporary coverage for the exposed exterior as soon as possible as the apt is no longer livable since the leaks are no longer in just one area.  I am afraid the ceiling may cave in on him. 

Please let me know how this may be addressed with the whole board?  


Thank you.

Amy & Albert Pando
796 Apt 3B 

Hi Amy, 

Hope all is well. I just wanted to let you know that after last nights snow and rain, the water damage on the ceiling got really bad. The building is still exposed and I guess because of the cold weather the rain found its way through all the cracks. The entire living room area was leaking in multiple spots. The square flap by the original leak was just pouring down water. Along the edges. I had to clear my whole living room so it didn’t get damaged. Attaching some photos so you can see the ceiling. I don’t know if you can tell in the photo as it’s dark but I circles where it’s leaking.

--

Nathaniel Kessman

unread,
Nov 16, 2018, 10:10:56 AM11/16/18
to A. Eng, dekal...@googlegroups.com, A_albiee albie, Kelly Horrigan
On it! 
<IMG_9880.jpg>
<IMG_9879.jpg>
<IMG_9878.jpg>

Nathaniel Kessman

unread,
Nov 16, 2018, 10:18:18 AM11/16/18
to A. Eng, dekal...@googlegroups.com, A_albiee albie, Kelly Horrigan
In contact with the construction manager,  Lazer he is being proactive. 


On Nov 16, 2018, at 9:59 AM, A. Eng <jok...@gmail.com> wrote:

<IMG_9880.jpg>
<IMG_9879.jpg>
<IMG_9878.jpg>

Nathaniel Kessman

unread,
Nov 16, 2018, 10:22:42 AM11/16/18
to A. Eng, dekal...@googlegroups.com, A_albiee albie, Kelly Horrigan, Ymecons...@gmail.com
Please let the tenant know that the construction manager Lazer will be there at 1pm 
I have copied him on the email. 
Thank you 
Nate 

On Nov 16, 2018, at 9:59 AM, A. Eng <jok...@gmail.com> wrote:

<IMG_9880.jpg>
<IMG_9879.jpg>
<IMG_9878.jpg>

A. Eng

unread,
Nov 16, 2018, 1:45:43 PM11/16/18
to Nathaniel Kessman, A_albiee albie, Kelly Horrigan, Ymecons...@gmail.com, dekal...@googlegroups.com
Hi Nate,

Thank you for your quick response. Lazer was at the apt.  Michel also mentioned that the leaks was more like a downpour of water at where the original leak started.  

Please let us know what the next step is and if there is anything we can assist to prevent this from further damages. 

Amy & Albert

A. Eng

unread,
Nov 17, 2018, 9:31:43 AM11/17/18
to YME Constrution, A_albiee albie, Kelly 794 dekalb, Nathaniel Kessman, dekal...@googlegroups.com
796. Apt 25B

On Fri, Nov 16, 2018 at 2:10 PM YME Constrution <ymecons...@gmail.com> wrote:

What's your apt number 

A. Eng

unread,
Nov 17, 2018, 9:33:16 AM11/17/18
to YME Constrution, A_albiee albie, Kelly 794 dekalb, Nathaniel Kessman, dekal...@googlegroups.com
Sorry that is apt 5B.  

917-359-4880 please call us for anything 

Amy & Albert

A. Eng

unread,
Nov 19, 2018, 12:11:52 PM11/19/18
to YME Constrution, A_albiee albie, Kelly 794 dekalb, Nathaniel Kessman, dekal...@googlegroups.com
Thank you for letting us know.  Hopefully this will be fixed before the next downpour? 

Amy & Albert

On Mon, Nov 19, 2018 at 9:46 AM YME Constrution <ymecons...@gmail.com> wrote:


It's a detail that is still missing on the setback wall by the bottom of the metal flashing at top of your apt.   Will take of it. 

Thanks 
Reply all
Reply to author
Forward
0 new messages