shekhar kataria

unread,
Sep 15, 2012, 11:38:19 AM9/15/12
to dda-...@googlegroups.com
Hello All

First off, Congratulations to all of you. 

Here, I have created this Thread in the hope that we all will get much needed help from our brothers and sisters in the forum. YOu all are requested to put all your queries related to DDA flats at Molarband or General Queries here. 

My Queries :

I have a flat in the K block at Molarband. I live outside Delhi. I recently got My possession letter finally after lot of follow ups. I know that Now i have to apply for the Water and Electricity connection and have to meet JE at the location. i am sure many of you are ahead of me in the procedures and can help me answer my below set of Questions. 

1. Can anyone provide me the Engineers Contact Name and Number at the Site. Since i live outside, i want to come with an appointment. 

2. How much time will it take to get Keys of the Flat after i apply for the connections. 

3. What about the construction status. Havent been to site for long long time. 

4. Has Anyone of you started living there ??


Looking forward for your kind replies. Many Thanks in Advance. 

Shekhar Kataria
09468227969




Pankaj Yadav

unread,
Sep 17, 2012, 1:10:22 AM9/17/12
to dda-...@googlegroups.com
inline .............

On 15 September 2012 21:08, shekhar kataria <shekhar...@gmail.com> wrote:
Hello All

First off, Congratulations to all of you. 

Here, I have created this Thread in the hope that we all will get much needed help from our brothers and sisters in the forum. YOu all are requested to put all your queries related to DDA flats at Molarband or General Queries here. 

My Queries :

I have a flat in the K block at Molarband. I live outside Delhi. I recently got My possession letter finally after lot of follow ups. I know that Now i have to apply for the Water and Electricity connection and have to meet JE at the location. i am sure many of you are ahead of me in the procedures and can help me answer my below set of Questions. 

1. Can anyone provide me the Engineers Contact Name and Number at the Site. Since i live outside, i want to come with an appointment. 

2. How much time will it take to get Keys of the Flat after i apply for the connections. 
The JE will generally give you the keys after around 1 month since you first talk to him and sign in a register he keeps with him to keep track of all possession requests.

3. What about the construction status. Havent been to site for long long time. 
In my opinion it will not be livable till the end of this year. Electricity and water connections are yet to reach the site + the electrical JE (Shamsher) will give you a date of 2 months from the time you submit your possession slip to him for electrical wiring unless you please his hands !

4. Has Anyone of you started living there ??
Not possible till the end of this year however there are several property dealers and real state agents that sit there in day time in some of the flats @ ground floor !

Wasi

unread,
Sep 17, 2012, 4:16:37 AM9/17/12
to dda-...@googlegroups.com
Hi Pankaj

I have visited Molar bandh site the work is on full swing the transformer Accessories is already comes The Room for Pannels are completed only needs Painting and installation of Pannels all the Pannels are fitted on wall for meter connection to the Room.
As per the Workers which is currently working for B.S.E.S told me that Today or Tomorrow Main Transformer will come we hope that End of September we got the Electricity
Water connection: They have already run the Trial for Water Motor and already filled the Water tank with help of Loose connection from behind the Awaas colony
Have you visited the site recently

Regards
Wasi

Pankaj Yadav

unread,
Sep 17, 2012, 4:21:49 AM9/17/12
to dda-...@googlegroups.com
That's good news,

 I visited around 20-25 days back and the remaining work was not in very good shape, moreover the stay on electric grid for A,B,C and D block will anyhow affect me at least, so I am not hoping for a speedy connection :(

regards
-Pankaj

sachin jain

unread,
Sep 17, 2012, 5:03:44 AM9/17/12
to dda-...@googlegroups.com
Even i visited last week on Thursday.
Even i was not much convinced by the situation there as the workers told me to for another 1-2 months.
Though i am not in hurry as i havent got the registration dates so far but can't even look for furnishing stuff without power.

cheers

Sachin Jain
Research Engr

wasi

unread,
Sep 17, 2012, 8:06:01 AM9/17/12
to dda-...@googlegroups.com
Hi all 

I have visited on Last Saturday i have update after Visited and physically seen  the Transformer equipment only main transformer is not come 
The contractor of the B.S.E.S Transformer House which has taken the contract measure the BASE measurement of Panel House he told me that end of this month Electricity in front of Water House has available and after that J block Transformer will installed  he told me that due to Court Stay order The Transformer installation will be Delay one moth.
Visit this week end you got the update all 

Regards
Wasi

--
Best Reagards
    Wasi

aravind ashok

unread,
Sep 17, 2012, 8:20:36 AM9/17/12
to dda-...@googlegroups.com
Hi Friends,

shekhar kataria

unread,
Sep 17, 2012, 8:49:49 AM9/17/12
to dda-...@googlegroups.com
Hello All 

Thanks for making this thread Active. 

Today i spoke to the JE to take the possession and then apply for water and electricity. I know most of you are waiting for electricity and water and i am delayed by the DDA stupidities. In my conversation with K block's JE ( Mr. Saxena ) he said that he is hopeful that the all basic amenities will be provided soon and You all may have your DIWALI this year in your new house. 

He also said, regarding the Stay order that it is not stopping DDA to install Electric meters and to handover the flats. 


Rgds,
Shekhar
Message has been deleted

jitendra jain

unread,
Sep 17, 2012, 8:59:20 AM9/17/12
to dda-...@googlegroups.com
Hi Shekhar,
 
Welcome to the forum & sorry for the delayed reply.Mine is also in K-block, 3rd floor. The no. of JE- Mr. Saxena is 9891992979.First of all visit the site & do the entry in the site register. Then call to mr. Saxena, he will confirm the receipt of his copy for your flat's possession. Normally it takes around one month to reach the copy to concern JE.
 
Once he confirms you the receipt, then take an appointment & go with all the documents mentioned in earlier threads or on group's website.
 
I have taken the possession in papers & will go for physical possession shortly.JE electrical no. is already shared by our active freind pankaj & wasi.
 
I hope this information will help u.
 
Rgds,
 
Jitendra jain

shekhar kataria

unread,
Sep 17, 2012, 9:10:51 AM9/17/12
to dda-...@googlegroups.com
Thanks Mr Jain 

There is Never late. Better late then never. Good to see you. 

you would be happy to know that we will be same floor partners. Also i spoke to JE today after i received PL a week back. He has asked to visit him next week with all the documents required  and he said he will give the keys to me immediately if all the document set is complete. 

After then you can apply for the Water and Electricity cdonnection. GOod news is  that he hopes that the flats will be liveable before DIWALI. 

shekhar kataria

unread,
Sep 19, 2012, 2:40:05 AM9/19/12
to dda-...@googlegroups.com
Hello Wasi , Pankaj and jitendra.

Guys, how much have u been offered by dealers for the Flat. 

Also, what do you think will be the premium after 2 years. I can hold it for 2 years but later i may have to sell for some personal reasons, though i dnt want. 

So a little confused between selling now or holding and selling later after 2 yeras.

rgds,
shekhar kataria



On Saturday, 15 September 2012 21:08:19 UTC+5:30, shekhar kataria wrote:

Manu Mewari

unread,
Sep 19, 2012, 2:45:43 AM9/19/12
to dda-...@googlegroups.com
I do not know the pricing of molarband. But my suggestion is do not sell until people start living in the apartment. Then you will get the correct market price and definitely better than what you are getting today.


MOHIT OHRI

unread,
Sep 19, 2012, 6:38:55 AM9/19/12
to dda-...@googlegroups.com
Hi Shekhar

I got offer of 41 L from Aadhar Associates.  Mine is a 2nd floor flat.  Price varies with floors.

Pankaj / Sachin - Any news on CD execution dates.  I submitted application for CD execution on 14th Aug.  but till date no response from DDA.

Regards
Mohit

shekhar kataria

unread,
Sep 19, 2012, 6:55:20 AM9/19/12
to dda-...@googlegroups.com
Hi Mohit and others.

Guys, What do u think should be the rentals there. Someone told me that you wont anything more than 8000 ??? 

jitendra jain

unread,
Sep 19, 2012, 7:02:47 AM9/19/12
to dda-...@googlegroups.com
In two years, there will be fully functional ayush department of AIIMS.So you can Imagine the prices there after

sachin jain

unread,
Sep 19, 2012, 8:09:23 AM9/19/12
to dda-...@googlegroups.com
@ Mohit,
No even i dint get the CD Execution date. I also submitted on the same day of 14th Aug.
Are you done with electrical fittings that was supposed to happen on 15th of this month if i am right.
And one more thing which block ur flat is in? I mean is it park facing or backside (railway line side).

Yeah i agree with Jitendra Jain sahab. We can expect more.
Please don't listen to brokers who actually complain of some things about molarband but are interested to purchase for other party.

cheers

Sachin Jain
Research Engr



Pankaj Yadav

unread,
Sep 19, 2012, 11:40:13 PM9/19/12
to dda-...@googlegroups.com
Even I haven't got a CD execution date as yet, though I submitted it later than you guys i.e. on 22nd August. My electrical fitting date is 20th October !

regards
-Pankaj

Pankaj Yadav

unread,
Sep 21, 2012, 12:13:54 AM9/21/12
to dda-...@googlegroups.com
Hi all,

 I have a query ....

Am I supposed to get a date for sanitary fittings as well in the similar lines of electrical wiring ? If not what's the process and timelines of getting sanitary fittings done ? and If yes how long is the date given in general (like a week, month or more ) ?

thanks in advance
-Pankaj

sachin jain

unread,
Sep 21, 2012, 12:45:26 AM9/21/12
to dda-...@googlegroups.com
Even i dint ask any one for dates of sanitary fittings as i thought the guy appointed for electrical fitting will do the same.
In fact  no one told to ask for this date also.

cheers

Sachin Jain
Research Engr



Vinod Kamboj

unread,
Sep 21, 2012, 1:37:16 AM9/21/12
to dda-...@googlegroups.com
As i asked for sanitary fillting with Mr. Ram Babu (DDA man) and one person of builder Ms. Sam India Pvt ltd they told me that they will installed sanitary fillting but without iron gate it is very risky, because of theft.
 
regards

Pankaj Yadav

unread,
Sep 21, 2012, 1:54:09 AM9/21/12
to dda-...@googlegroups.com
Hi Vinod !

I have got the iron gates installed ... shall I go talk to the DDA man and get a date for sanitary fittings, any idea ?

regards
-Pankaj

Vinod Kamboj

unread,
Sep 21, 2012, 2:02:54 AM9/21/12
to dda-...@googlegroups.com
As per him sanitary fillting will installed by builder persons only, you can visit on site and asked for sanitary fittings
As i have also installed iron gates and similay sanitary fitting is pending in my flat.
 
regards

MOHIT OHRI

unread,
Sep 21, 2012, 3:08:59 AM9/21/12
to dda-...@googlegroups.com
Hi Sachin
 
Yes, I got electrical fittings done.  My flat is in G Block 2nd Floor no park facing / railway track facing.  Its facing j block flats.
 
I think we should go to vikas sadan to check on cd execution dates otherwise, i tiwll be unnecessary delay.
 
Regards
Mohit

sachin jain

unread,
Sep 21, 2012, 11:13:55 AM9/21/12
to dda-...@googlegroups.com
It seems i have got the dates for CD Execution and that is 04th feb though i am not sure because i dont have letter in my hand.
Its at home.


cheers

Sachin Jain
Research Engr



MOHIT OHRI

unread,
Sep 24, 2012, 12:28:16 PM9/24/12
to dda-...@googlegroups.com
Hi Pankaj
 
Have you received date for CD execution.  I am planning to visit vikas sadan next friday to check on this.  Or do you think we should wait for some more time.
 
Regards
Mohit

Pankaj Yadav

unread,
Sep 25, 2012, 1:00:31 AM9/25/12
to dda-...@googlegroups.com
Hi Mohit,

 yes I received the CD execution date a couple of days back. The date in my case is 4th Feb-2013, too far indeed :)

regards
-Pankaj

Wasi

unread,
Oct 3, 2012, 12:16:18 AM10/3/12
to dda-...@googlegroups.com
 
Hi All

Is there any update from Molar bandh Have any one visited the site. When we are able to shift in our dream home ????????


Regards
wasi

MOHIT OHRI

unread,
Oct 3, 2012, 7:16:17 AM10/3/12
to dda-...@googlegroups.com
Hi Pankaj

How much time it usually takes to get date for CD execution.  I submitted possession slip on 21st July & yet to hear from DDA.  Please advise.

Regards
Mohit

sachin jain

unread,
Oct 3, 2012, 7:55:44 AM10/3/12
to dda-...@googlegroups.com
i got that in 1 month of time. Submitted on 17th august, got date around 1 month later though date is actually 4 months later 

cheers

Sachin Jain
Research Engr



Pankaj Yadav

unread,
Oct 4, 2012, 12:20:10 AM10/4/12
to dda-...@googlegroups.com
I too got the date in around a month submitted in around mid Aug and got the date in last week of september !

regards
-Pankaj

MOHIT OHRI

unread,
Oct 14, 2012, 1:12:23 AM10/14/12
to dda-...@googlegroups.com
I also got my CD execution date on Feb. 11, 2013.

Pankaj / Sachin - I got my electrical fittings done but have not applied for conection yet.  I heard some kind of test report is required for that.  Have you guys got any such report ?

Regards
Mohit

sachin jain

unread,
Oct 14, 2012, 2:19:11 AM10/14/12
to dda-...@googlegroups.com
Hi,
I am yet to get fittings done. I had given my keys 2 weeks back but its still not done. Anyway he called me this friday to get my keys also with test report.
I talked to some of the guys there and got to know testing for water pipe line is already started.
There was some leakage so for that repair work is started already.
Even it was told that VC has given strict instructions to get the electricity with in 3-4 days and for that testing is started.

So i guess things are moving and people can shift on around DIWALI.


3 cheers

Sachin Jain
Research Engr

Sarvesh Kumar

unread,
Oct 16, 2012, 8:59:35 AM10/16/12
to dda-...@googlegroups.com
Any allottee from Molarband got Electricity connection. If yes, what is the process?

sachin jain

unread,
Oct 19, 2012, 8:47:48 AM10/19/12
to dda-...@googlegroups.com
Electricity has reached to the transformers of Molar Bandh. But testing is yet to be done. 
Many of allottee have already taken test reports so i guess many have already applied but no idea if some one got that or not.

cheers

Sachin Jain
Research Engr



Pankaj Yadav

unread,
Oct 29, 2012, 8:18:15 AM10/29/12
to dda-...@googlegroups.com
I visited the site recently and following are my observations / updates:

- The stay on grid for Blocks A-D continue, but it has been decided that for now power to these blocks will be given by other 2 grids

- The electricity and sanitary fittings work is going on full speed

- many people are customizing electricity and sanitary fittings for example getting more sockets fitted, having extra switches/points etc and getting extra taps etc by giving extra money to the boys doing electricity and sanitary fittings

- The overall progress is looking good and it seems people will starting moving-in there in around a months time

- the electrical je (shamsher) comes there every friday to issue to load calculation sheet, which is mandatory to get the electricity connection

- there are many agents available and people getting their flats furnished and pop and gate work done.

regards
-Pankaj

MOHIT OHRI

unread,
Oct 29, 2012, 9:58:26 AM10/29/12
to dda-...@googlegroups.com
Thanks for the update Pankaj.  I got electrical fittings done but no load calculation sheet / test report has been given to me.  Is there a process to apply for it  as it was not given to me.

Regards
Mohit

Pankaj Yadav

unread,
Oct 29, 2012, 11:11:30 AM10/29/12
to dda-...@googlegroups.com
Hi Mohit,

 you need to meet the electrical JE personally along with a self attested copy of Possession Slip, he comes every Friday in the first half as told to me by the guy who does the fitting. You need this calculation sheet to apply for electrical connection. I haven't got it either !

regards
-Pankaj

MOHIT OHRI

unread,
Oct 29, 2012, 11:16:14 PM10/29/12
to dda-...@googlegroups.com
Thanks Pankaj !

sachin jain

unread,
Oct 30, 2012, 12:13:30 AM10/30/12
to dda-...@googlegroups.com
Hey Hi,
he is available on monday as well. 
He may ask for sm money also that even in open.

cheers

Sachin Jain
Research Engr



MOHIT OHRI

unread,
Oct 30, 2012, 12:18:00 AM10/30/12
to dda-...@googlegroups.com
Hi Sachin
 
How much have you paid.  & what for ?  Is it required to be paid or is that a bribe ?
 
Regards
Mohit

sachin jain

unread,
Oct 30, 2012, 12:21:35 AM10/30/12
to dda-...@googlegroups.com
i hvnt paid anything yet. and yes. And it is for nothing, probably because of his chair and yes it is.
i saw people there doing so.
I am still waiting for my fittings done though i had given my keys more than a month back.

cheers

Sachin Jain
Research Engr



Ankur Prakash

unread,
Oct 30, 2012, 3:43:38 AM10/30/12
to DDA 2010
Dear Friends,

Its true that the JE electrical(shamsher singh) will demand kharcha-
pani in open
for giving the load sheet. DO NOT PAY A SINGLE PENNY TO HIM.

I was denied the load sheet as allotment is in name of my father,
while I have gone with all the proofs to collect the load sheet.
He was demanding Rs.1000, which I refused to give,
as I will send my father to get load sheet collected in person.
He was telling that if you have a re-sale flat the bribe is upto Rs.
4000/-

I am already in pipeline to give a written complaint against him to
DDA.
Would appreciate your feedback in this regard.

- Ankur.

On Oct 30, 9:22 am, sachin jain <frnd4ever.n...@gmail.com> wrote:
> i hvnt paid anything yet. and yes. And it is for nothing, probably because
> of his chair and yes it is.
> i saw people there doing so.
> I am still waiting for my fittings done though i had given my keys more
> than a month back.
>
> cheers
>
> Sachin Jain
> Research Engr
>
>
>
>
>
>
>
> On Tue, Oct 30, 2012 at 9:48 AM, MOHIT OHRI <mohitohri1...@gmail.com> wrote:
> > Hi Sachin
>
> > How much have you paid.  & what for ?  Is it required to be paid or is
> > that a bribe ?
>
> > Regards
> > Mohit
>
> > On Tue, Oct 30, 2012 at 9:43 AM, sachin jain <frnd4ever.n...@gmail.com>wrote:
>
> >> Hey Hi,
> >> he is available on monday as well.
> >> He may ask for sm money also that even in open.
>
> >> cheers
>
> >> Sachin Jain
> >> Research Engr
>
> >>  On Tue, Oct 30, 2012 at 8:46 AM, MOHIT OHRI <mohitohri1...@gmail.com>wrote:
>
> >>> Thanks Pankaj !
>
> >>> On Mon, Oct 29, 2012 at 8:41 PM, Pankaj Yadav <pankaj....@gmail.com>wrote:
>
> >>>> Hi Mohit,
>
> >>>>  you need to meet the electrical JE personally along with a self
> >>>> attested copy of Possession Slip, he comes every Friday in the first half
> >>>> as told to me by the guy who does the fitting. You need this calculation
> >>>> sheet to apply for electrical connection. I haven't got it either !
>
> >>>> regards
> >>>> -Pankaj
>
> >>>> On 29 October 2012 19:28, MOHIT OHRI <mohitohri1...@gmail.com> wrote:
>
> >>>>> Thanks for the update Pankaj.  I got electrical fittings done but no
> >>>>> load calculation sheet / test report has been given to me.  Is there a
> >>>>> process to apply for it  as it was not given to me.
>
> >>>>> Regards
> >>>>> Mohit
>
> >>>>> On Mon, Oct 29, 2012 at 5:48 PM, Pankaj Yadav <pankaj....@gmail.com>wrote:
>
> >>>>>> I visited the site recently and following are my observations /
> >>>>>> updates:
>
> >>>>>> - The stay on grid for Blocks A-D continue, but it has been decided
> >>>>>> that for now power to these blocks will be given by other 2 grids
>
> >>>>>> - The electricity and sanitary fittings work is going on full speed
>
> >>>>>> - many people are customizing electricity and sanitary fittings for
> >>>>>> example getting more sockets fitted, having extra switches/points etc and
> >>>>>> getting extra taps etc by giving extra money to the boys doing electricity
> >>>>>> and sanitary fittings
>
> >>>>>> - The overall progress is looking good and it seems people will
> >>>>>> starting moving-in there in around a months time
>
> >>>>>> - the electrical je (shamsher) comes there every friday to issue to
> >>>>>> load calculation sheet, which is mandatory to get the electricity connection
>
> >>>>>> - there are many agents available and people getting their flats
> >>>>>> furnished and pop and gate work done.
>
> >>>>>> regards
> >>>>>> -Pankaj
>
> >>>>>> On 19 October 2012 18:17, sachin jain <frnd4ever.n...@gmail.com>wrote:
>
> >>>>>>> Electricity has reached to the transformers of Molar Bandh. But
> >>>>>>> testing is yet to be done.
> >>>>>>> Many of allottee have already taken test reports so i guess many
> >>>>>>> have already applied but no idea if some one got that or not.
>
> >>>>>>> cheers
>
> >>>>>>> Sachin Jain
> >>>>>>> Research Engr
>
> >>>>>>>  On Tue, Oct 16, 2012 at 6:29 PM, Sarvesh Kumar <guptas...@gmail.com

MOHIT OHRI

unread,
Oct 30, 2012, 4:04:44 AM10/30/12
to dda-...@googlegroups.com
Hi Ankur

I totally agree with you.  NO single penny should be paid.  I will also speak to the Add Dir DDA today & complain the same.  This is not a legal charge & he cannot deny a test report & a load sheet.  If it is still on, I will also speak to Anti Corruption Bureau.

Regards
Mohit

Sandeep Kumar

unread,
Oct 30, 2012, 4:17:22 AM10/30/12
to DDA 2010
If the JE is asking for bribe openly, buy a pen camera and record
everything and show the recording to DDA Sr. officials or any other
anti corruption agency and see the effect of having solid proofs in
your hand. The JE will virtually go down on his knees in front of you
and will do anything and everything you will ask
for..................:)

Regards

On Oct 30, 1:04 pm, MOHIT OHRI <mohitohri1...@gmail.com> wrote:
> Hi Ankur
>
> I totally agree with you.  NO single penny should be paid.  I will also
> speak to the Add Dir DDA today & complain the same.  This is not a legal
> charge & he cannot deny a test report & a load sheet.  If it is still on, I
> will also speak to Anti Corruption Bureau.
>
> Regards
> Mohit
>

Vinod Kamboj

unread,
Oct 30, 2012, 6:49:05 AM10/30/12
to dda-...@googlegroups.com
As per some agents they told that, without money he calculate extra load in your load sheet.
 
Regards

Wasi

unread,
Oct 31, 2012, 4:27:50 AM10/31/12
to dda-...@googlegroups.com
Hi All

Now i got the Demand Note for Electricity Connection i have paid 3000 Rupees by Cash No Credit or Debit Card for Demand Notes Payment
B.S.E.S person told me that within 7 days i have a meter Installation and got the Electricity
I hope we celebrate Diwali in My New DDA Flat

Reghards
Wasi

Vikas Gupta

unread,
Oct 31, 2012, 4:31:21 AM10/31/12
to dda-...@googlegroups.com
contgrates...good news
please share what is the steps..

sachin jain

unread,
Oct 31, 2012, 4:31:02 AM10/31/12
to dda-...@googlegroups.com
Hi wasi,
congratulations, probably you will be the first person to shift to Molarbandh
anyway do we have to apply separately for water connection ?

cheers

Sachin Jain
Research Engr



On Wed, Oct 31, 2012 at 1:57 PM, Wasi <was...@gmail.com> wrote:

sachin jain

unread,
Oct 31, 2012, 4:31:35 AM10/31/12
to dda-...@googlegroups.com
One more thing wasi,
what is total expenditure involved with electricity connection ?

cheers

Sachin Jain
Research Engr



Pankaj Yadav

unread,
Oct 31, 2012, 4:33:12 AM10/31/12
to dda-...@googlegroups.com
Congrats Wasi ...

 Right Sachin .. all info I get is only about the electricity connection, what about the water connection who do we apply and what are the steps, Wasi can u please let us know !

regards
-Pankaj

wasi

unread,
Oct 31, 2012, 4:45:05 AM10/31/12
to dda-...@googlegroups.com
Hi All

The Step is as follow for BSES electricity connection

Step1 : Take the Load Calculation Sheet from JE Electrical Smasher Singh
Step2:  Take the form for new Connection Form from BSES  Office New Friends Colony you can also download from BSES Website
Step:    Fillup the Form and Attached one the following Documents Attested by Notary
  1. Possession Slip (photo copy attested by Notary)
  2. Load Calculation Sheet 
  3. (ELCB) Purchase Receipt for above than 5KVA Load


Regards
Wasi
DDA FLAT Molar Bandh
--
Best Reagards
    Wasi

wasi

unread,
Oct 31, 2012, 4:50:46 AM10/31/12
to dda-...@googlegroups.com
HI All

I have write about BSES electricity i have not taken the Water connection but i have asked regarding this DDA person in Site told me that One person is available
For water connection you asked him he will help you
i am planning to go for water connection on Saturday i will update in mon

Regards
wasi
--
Best Reagards
    Wasi

MOHIT OHRI

unread,
Oct 31, 2012, 4:53:16 AM10/31/12
to dda-...@googlegroups.com
Hi Wasi

Did you pay anything to Shamsher for Load Calculation Sheet ?

Regards
Mohit

wasi

unread,
Oct 31, 2012, 4:54:33 AM10/31/12
to dda-...@googlegroups.com
Hi Sachin

I have got the EBCL Receipt and Attestation work from the agent who is available in New friends colony Community Center
he charged me Rs 300 and Demand notes Amount is 3000 I have not Pay any penny to smasher he asked openly but i Simply told him after getting Electricity
i will give you but i will not Pay anything

Regards
Wasi


On Wed, Oct 31, 2012 at 2:01 PM, sachin jain <frnd4ev...@gmail.com> wrote:
One more thing wasi,
what is total expenditure involved with electricity connection ?

cheers

Sachin Jain
Research Engr



On Wed, Oct 31, 2012 at 2:01 PM, sachin jain <frnd4ev...@gmail.com> wrote:
Hi wasi,
congratulations, probably you will be the first person to shift to Molarbandh
anyway do we have to apply separately for water connection ?

cheers

Sachin Jain
Research Engr



On Wed, Oct 31, 2012 at 1:57 PM, Wasi <was...@gmail.com> wrote:
Hi All

Now i got the Demand Note for Electricity Connection i have paid 3000 Rupees by Cash No Credit or Debit Card for Demand Notes Payment
B.S.E.S person told me that within 7 days i have a meter Installation and got the Electricity
I hope we celebrate Diwali in My New DDA Flat

Reghards
Wasi






--
Best Reagards
    Wasi

wasi

unread,
Oct 31, 2012, 4:59:28 AM10/31/12
to dda-...@googlegroups.com
Hi Sachin

No need to Apply for Water connection because Water is provide by DDA not by DJB and i have already paid 1000 for Security Deposit
Water is available you need to ask DDA person while you want Water in your Flat Daily Moter is Running for Sometime

Regards
Wasi


On Wed, Oct 31, 2012 at 2:01 PM, sachin jain <frnd4ev...@gmail.com> wrote:



--
Best Reagards
    Wasi

sachin jain

unread,
Oct 31, 2012, 5:24:39 AM10/31/12
to dda-...@googlegroups.com
Hi wasi,
Thanks for this information.
Yes i have already paid 1000/- in the name of water meter security charges but still not sure about water connection.
And you dint mention anything about Electricity Meter ? Do we have to purchase it or BSES ll provide that to us ?


cheers

Sachin Jain
Research Engr



Ankur Prakash

unread,
Oct 31, 2012, 6:56:42 AM10/31/12
to DDA 2010
Congrats Wasi,

Please specify the full procedure. For what load you have paid 3000/-
The test report given by JE electrical specifies 4.5 KW for each flat.
For how much KW you have applied/sanctioned.

- Ankur.

wasi

unread,
Oct 31, 2012, 7:26:10 AM10/31/12
to dda-...@googlegroups.com
Hi Ankur

Everyone has got the same Load calculation 4.58 KW  but BSES People has given me the 5KW
 As per BSES Security Deposit you have to pay Rs 600 per KW

Regards
wasi
--
Best Reagards
    Wasi

MOHIT OHRI

unread,
Oct 31, 2012, 7:29:27 AM10/31/12
to dda-...@googlegroups.com
HI Wasi

How about the electricity meter.  Do we need to purchase it ?

Regards
Mohit

wasi

unread,
Oct 31, 2012, 7:29:41 AM10/31/12
to dda-...@googlegroups.com
 Hi Sachin

B.S.E.S is not charging any amount from you for New Connection Tit is only for DDA Flats you have to pay Security Deposit is for Electricity Meter

Regards
Wasi
--
Best Reagards
    Wasi

Vinod Kamboj

unread,
Nov 1, 2012, 12:11:58 AM11/1/12
to dda-...@googlegroups.com
Is ELCB is compulsory to purchase befor demand amount order generation?, any idea
 
regards

wasi

unread,
Nov 1, 2012, 12:20:29 AM11/1/12
to dda-...@googlegroups.com
Hi
You can ask if DDA is provide this equipment you need not purchase it i hope DDA is provide us

Regards
\wasi
--
Best Reagards
    Wasi

Vinod Kamboj

unread,
Nov 1, 2012, 12:35:31 AM11/1/12
to dda-...@googlegroups.com
But as per BSES communication they told that DDA refuse to provide this part, so you have to purchase this part, and show the bill of ELCB, after that they generate demand note (today update)
 
Regards

sachin jain

unread,
Nov 1, 2012, 1:20:44 AM11/1/12
to dda-...@googlegroups.com
but yeh ELCB hota kya hai ?

cheers

Sachin Jain
Research Engr



MOHIT OHRI

unread,
Nov 1, 2012, 2:44:36 AM11/1/12
to dda-...@googlegroups.com
Hi Wasi

Whats the charge of ELCB other than Rs. 3000 for 5 KVA load ?

Regards
Mohit

On Thu, Nov 1, 2012 at 9:50 AM, wasi <was...@gmail.com> wrote:

Pawan Keshri

unread,
Nov 1, 2012, 4:06:23 AM11/1/12
to dda-...@googlegroups.com
 Hi Wasi,
 
Its sounding good, now you are the first person whose got demand note. Firstly want to say congrats.. and now wanna to ask what is the ELCB, and what is the process to get it.
 
One more thing if you gets Electricity and water before Deewali so whats your plan to shift in our dream flats.
 
and how many pepole are ready to move there till Nov. Can you provide response all of you.
 
Thanks
Pawan K
DDA Flat Molar Bandh.

Vinod Kamboj

unread,
Nov 1, 2012, 4:55:19 AM11/1/12
to dda-...@googlegroups.com
( Earth Leakage Circuit Breaker (ELCB) is a elecrical part (like MCB) used to install with the meter, BSES person earlier in asumptiom that DDA will provided this part to allotees. It is necassary for 5KW load
 
Top of that BSES refusing to gererate demand note without ELCB bill.
 
 Regards

AVINASH CHANDRA

unread,
Nov 1, 2012, 10:54:57 AM11/1/12
to dda-...@googlegroups.com, dda-...@googlegroups.com
Earth leakage circuit breaker . It is a sensitive device which operates at very low leakage currents for human safety. I am an electrical engineer and hence you can rely upon me

With best regards

Avinash Chandra

Sent from my iPhone 4S

Ankur Prakash

unread,
Nov 2, 2012, 5:57:50 AM11/2/12
to DDA 2010
Dear Wasi,

I dont think it is mandatory to have 5KW as minimun load connection
for this flat.
My electrician has told that 3 KW is sufficient for this flat, with 2
ac/1 geyser/other house hold appliances.
Can I apply for only 3KW as it will reduce the security amount by Rs.
1200.
It will also avoid all formalities/expenses, which are to be done if
you have 5KW or more.

The flat in which I am staying on rent as of now, is a three storeyed
building with three flats each floor.
The total KW for the whole building is 2.5KW only as per the
electricity bill.
With this statistics I am sure that for my baby-flat 3KW would be more
than enough.

Is there is any difference in monthly billing of 3KW connection and
5KW connection?

- Ankur.

On Oct 31, 4:26 pm, wasi <wasi...@gmail.com> wrote:
> Hi Ankur
>
> Everyone has got the same Load calculation 4.58 KW  but BSES People has
> given me the 5KW
>  As per BSES Security Deposit you have to pay Rs 600 per KW
>
> Regards
> wasi
>

Ankur Prakash

unread,
Nov 2, 2012, 6:00:22 AM11/2/12
to DDA 2010
Correction: *1 flat each floor*

Pankaj Yadav

unread,
Nov 2, 2012, 7:28:13 AM11/2/12
to dda-...@googlegroups.com
Yeah higher load will mean higher fixed amount in the electricity bill, but can't do any thing electrical je is making uniform test report each with load sanction of 4.58 kW and BSES gives connection for round-off 5 kW, there must be some saanth-gaanth as Shamsher is a very corrupt person, I am amazed how openly he demands money for this 5kW load paper ... !!!

Pawan Keshri

unread,
Nov 3, 2012, 9:06:20 AM11/3/12
to dda-...@googlegroups.com
kuchh report krte hai media me is samsher ko..

wasi

unread,
Nov 4, 2012, 1:48:05 AM11/4/12
to dda-...@googlegroups.com
Hi Ankur

I have already discussed with BSES People they told me that in DDA Lig Flats we provided min 5KW
Then i have applied 5KW i think only Security deposit is more other the expenses is as per billing Tariff is not Effected on Load if i found only 3 kW is Sufficient then i will reduced my Load with BSES
we can Reduced Latter
Regards
Wasi
--
Best Reagards
    Wasi

MOHIT OHRI

unread,
Nov 5, 2012, 12:24:58 AM11/5/12
to dda-...@googlegroups.com
Hi Wasi

I understand that if you are taking a 5 kva load,  fixed bill amount that you need to pay is high in comparision to 3 kva load.  Morever & BSES cannot compel anybody whether DDA or private socieity to go for minimum 5 kva load.  It totally depends on the requirement.  It seems Shamsher is giving standard 5 kva load to everybody who is not bribing him. 

We should take this seriously.

Regards
Mohit

Pankaj Yadav

unread,
Nov 5, 2012, 1:13:46 AM11/5/12
to dda-...@googlegroups.com
Hi guys,

 many people there are customizing electricity and sanitary connections, such as getting more sockets points and more taps etc by paying money to Rajkumar and Sabbir as they say that later these things will be very difficult as they require drilling etc. What have  you guys done have you gone with default connections or have you customized the connections ?

regards
-Pankaj

MOHIT OHRI

unread,
Nov 5, 2012, 3:25:41 AM11/5/12
to dda-...@googlegroups.com
Hi Pankaj

I got default connections & found them okay. 

Regards
Mohit

varuns...@gmail.com

unread,
Nov 5, 2012, 3:41:06 AM11/5/12
to dda-...@googlegroups.com
No fixed charges are same for both 3 & 5 KW.

Sent from my Nokia phone

sachin jain

unread,
Nov 5, 2012, 4:13:05 AM11/5/12
to dda-...@googlegroups.com
i am actualy optiong for inverter connection, rest all is same.

cheers

Sachin Jain
Research Engr



shammi

unread,
Nov 14, 2012, 12:31:29 AM11/14/12
to dda-...@googlegroups.com


On Saturday, September 15, 2012 9:08:19 PM UTC+5:30, shekhar kataria wrote:
Hello All

First off, Congratulations to all of you. 

Here, I have created this Thread in the hope that we all will get much needed help from our brothers and sisters in the forum. YOu all are requested to put all your queries related to DDA flats at Molarband or General Queries here. 

My Queries :

I have a flat in the K block at Molarband. I live outside Delhi. I recently got My possession letter finally after lot of follow ups. I know that Now i have to apply for the Water and Electricity connection and have to meet JE at the location. i am sure many of you are ahead of me in the procedures and can help me answer my below set of Questions. 

1. Can anyone provide me the Engineers Contact Name and Number at the Site. Since i live outside, i want to come with an appointment. 

2. How much time will it take to get Keys of the Flat after i apply for the connections. 

3. What about the construction status. Havent been to site for long long time. 

4. Has Anyone of you started living there ??


Looking forward for your kind replies. Many Thanks in Advance. 

Shekhar Kataria
09468227969


have anybody shifted on DIWALI . Best Wishes to you all for DIWALI
 

Pawan Keshri

unread,
Nov 14, 2012, 5:31:50 AM11/14/12
to dda-...@googlegroups.com
Yes I am going to shift there by 23th Nov.

Pankaj Yadav

unread,
Nov 14, 2012, 6:13:39 AM11/14/12
to dda-...@googlegroups.com
Congrats Pawan !

regards
-Pankaj

sachin jain

unread,
Nov 14, 2012, 6:16:54 AM11/14/12
to dda-...@googlegroups.com
I hope all of us who are yet to apply for electricity connection will be reaching to molarbandh on friday.

cheers

Sachin Jain
Research Engr



shammi

unread,
Nov 24, 2012, 4:03:47 AM11/24/12
to dda-...@googlegroups.com
bhai have you shifted let us know about the conditions if possible post some photos of our colony. l am in Banglore haven't been to the site since january 2012

MOHIT OHRI

unread,
Nov 24, 2012, 4:54:47 AM11/24/12
to dda-...@googlegroups.com

Hi Sachin

You got the electricity connection.  Whats the KVA load you have applied for ?  Any payment to shamsher ?

Regards
Mohit

sachin jain

unread,
Nov 24, 2012, 5:27:28 AM11/24/12
to dda-...@googlegroups.com
Hi Mohit Ji,
Yeah, i applied for electricity connection. KVA Load was same for every one 4.58.
And no, i dint pay anything to shamsher because of the camp. 
That's why i dint want to miss the chance of attending this camp.

cheers

Sachin Jain
Research Engr



MOHIT OHRI

unread,
Dec 9, 2012, 4:20:33 AM12/9/12
to dda-...@googlegroups.com
Hi All

Anyidea, if any families shifted to molarband LIG Flats.  Its been long I haven't been there.  Hope power & water must be ready to use by now ?

Regards
Mohit

Pankaj Yadav

unread,
Dec 9, 2012, 11:55:51 AM12/9/12
to dda-...@googlegroups.com
Hi Mohit,

 today I went to the site and felt good that at least 2 families have shifted, tomorrow one more person is doing the 'Graha Pravesh' Pooja from C-Block. There are many who have done the Pooja and will be shifting soon like in January & February. BTW two people I am talking about are in E-Block !

regards
-Pankaj

MOHIT OHRI

unread,
Dec 9, 2012, 9:58:07 PM12/9/12
to dda-...@googlegroups.com
Hi Pankaj

Sounds good that finally the property is ready to move in...  Also, have you applied for electricity connection.  I am yet to get test report.  Whats the procedure after that.  Also, how about the whitewash & carpenter stuff.  You have any contact I am speak to get this done.

Regards
Mohit

Pankaj Yadav

unread,
Dec 10, 2012, 12:20:30 AM12/10/12
to dda-...@googlegroups.com
Hi Mohit,

 I'll be applying for electricity connection, this week ! I'll suggest you to get the test report soon, have u already got a date for electric wiring ? After getting the electric wiring done, you need to contact Shamsher for the test report. He is not a good guy (asks for Bribe openly !). He sits 2 days in a week @ Molarbandh (Campus, Pump House).

Once you get the test report, you need to apply for the electric meter, @ New Friends Colony BSES office, along with Address proof, ID Proof, Test Report, Possession slip etc. It generally takes less than a week to get the meter.

Regarding White-wash, gates, furnishing (optional) etc there are many agents / thekedar (but are asking more price than market rates, I feel !) @ Molarbandh site itself. I am yet to get these things done, so till now haven't decided about it !

regards
-Pankaj

Sandeep Singh

unread,
Dec 10, 2012, 2:46:21 AM12/10/12
to dda-...@googlegroups.com

Can any one tell me the ongoing property rate in Molarband LIG?

On Sep 17, 2012 5:10 AM, "Pankaj Yadav" <panka...@gmail.com> wrote:
inline .............

On 15 September 2012 21:08, shekhar kataria <shekhar...@gmail.com> wrote:
Hello All

First off, Congratulations to all of you. 

Here, I have created this Thread in the hope that we all will get much needed help from our brothers and sisters in the forum. YOu all are requested to put all your queries related to DDA flats at Molarband or General Queries here. 

My Queries :

I have a flat in the K block at Molarband. I live outside Delhi. I recently got My possession letter finally after lot of follow ups. I know that Now i have to apply for the Water and Electricity connection and have to meet JE at the location. i am sure many of you are ahead of me in the procedures and can help me answer my below set of Questions. 

1. Can anyone provide me the Engineers Contact Name and Number at the Site. Since i live outside, i want to come with an appointment. 

2. How much time will it take to get Keys of the Flat after i apply for the connections. 
The JE will generally give you the keys after around 1 month since you first talk to him and sign in a register he keeps with him to keep track of all possession requests.

3. What about the construction status. Havent been to site for long long time. 
In my opinion it will not be livable till the end of this year. Electricity and water connections are yet to reach the site + the electrical JE (Shamsher) will give you a date of 2 months from the time you submit your possession slip to him for electrical wiring unless you please his hands !

4. Has Anyone of you started living there ??
Not possible till the end of this year however there are several property dealers and real state agents that sit there in day time in some of the flats @ ground floor !

jitendra jain

unread,
Dec 12, 2012, 11:24:36 PM12/12/12
to dda-...@googlegroups.com
It depends on location, GF, First raw is 65 L & not available, GF other locations-52 L, third floor above-40 L.
 
 
Has any one recd. the check sheet, i.e. list of sanitary fittings, pls. share a scan copy, as peoples are asking for additional fittings & accessories on allotees part to get the fittings done.
 
Rgds,
 
Jitendra jain

Sandeep Singh

unread,
Dec 13, 2012, 4:49:13 AM12/13/12
to dda-...@googlegroups.com

Thanks. Rates are quite steep...even more than Jasola!

jitendra jain

unread,
Dec 13, 2012, 5:20:13 AM12/13/12
to dda-...@googlegroups.com
Reason behind is 150 mtr. mathura road, 150 mtrs. Mohan co-operative Industrial area/corporate offices, 850 mtrs. metro station & just in front upcoming ayush hospital, area is also >jasola, i.e. DDA has taken maximum for molarband flats in this catagory.
 
Rgds,
 
Jitendra jain

Sandeep Singh

unread,
Dec 14, 2012, 12:19:41 AM12/14/12
to dda-...@googlegroups.com

Has anybody started living in Molarband LIG?

Pankaj Yadav

unread,
Dec 14, 2012, 1:24:07 AM12/14/12
to dda-...@googlegroups.com
Yes at least 2-3 families have moved in (E-Block) !

regards
-Pankaj

jitendra jain

unread,
Jan 10, 2013, 11:13:56 PM1/10/13
to dda-...@googlegroups.com
Hey pankaj,
 
have u got shifted? how many families got shifted?any idea! what options in near by to full fill the  day today grocessry & other genral needs, i.e. near by market. As DDA has not developed any commercial complex yet. And I do'nt think it would be, till the ayush become functional.
 
Rgds,
 
Jitendra jain 

Pankaj Yadav

unread,
Jan 11, 2013, 12:15:27 AM1/11/13
to dda-...@googlegroups.com
Hi Jitendra,

 due to some personal and financial reasons ... I could not visit the site for quite some time now. I'll not be able get the remaining work in my flat will march at least.

 as far as market is concerned, it should not be a problem as there is an area just nearby i.e. Gautampuri Awas which is quite populated and you'll get most of the daily items there in the market, for more advanced items you could visit to Molarbandh market or Badarpur market, both nearby only !

regards
-Pankaj

Sandeep Singh

unread,
Jan 11, 2013, 5:04:44 AM1/11/13
to dda-...@googlegroups.com

What is the ongoing property rate in Molarband?

vijay Aggarwal

unread,
Jan 15, 2013, 6:13:48 AM1/15/13
to dda-...@googlegroups.com
Hi

Anybody recently shifed to Molarbad?

Vijay