This is the biggest confusion. I don't know the kind of funds that I need to collect.
They should have atleast mentioned the area in the allotment letter.
Does anyone have any idea when the demand letters for dwarka will be sent?
Dear Deep Kamal and Mr Ajay ,
Have you taken the possession for the houses.
I am enclosing few photos for sector 18 B during my visit yesterday to site. The place is still the same as two months back. Water and electricity still not there. Few blocks are still not ready. No block is 100% complete. Sanitary fittings are not installed in any house.
Block layout of all flats enclosed.
There are 10 floors and each floor has 3 houses.
There are 15 such blocks. So the total houses are minimum 450
Road and drainage work in progress.
Lifts installed in few blocks but no power
Sanitary fittings are not installed in any house.
Kitchen fittings are not installed.
Few glass windows are also not installed.
I have a feeling that it will take minimum 3-6 months to install the fittings supply power if they work seriously and sincerely.
About 150 houses possession given already
They are giving possession without the electricity and water if you want to take without the same. I do not know whether DDA will any penalty for not handing over the houses in time. I have no idea whether they will install the balance fittings after giving the possession ( if you take the possession now without these fittings)
Regards
"Important: This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error we would request you not to copy, store or forward the email. Please return the message to the sender and delete it immediately thereafter"
--
You received this message because you are subscribed to the Google Groups "DDA 2010" group.
To unsubscribe from this group and stop receiving emails from it, send an email to dda-2010+u...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
better to get it done from vikas sadan. (at least ) i have not heard of any documentation shops near dwarka 18b or vk
--
Dear All,
I visited Dwarka Sec-18B HIG flats two days ago...
I was shocked to notice that these are at same stage what was immediately after the draw i.e. no work during last four months.
The Guard there told that nobody (Contractor or labour) comes there and it will take another 1.5 year to 2 years to complete these.
However said that Pocket - 2 is almost complete and could be handed over much ahead than Pocket-1.
Pocket-2 was locked and I was not allowed to enter that.
However I visited in a sample flat somewhat ready at first floor in pocket-1. I've tried to make its floor plan and the same is attached for reference.
The person sitting there told that design is same for all the flats either in pocket-1 or pocket-2.
There are three flats on each floor and two lifts serve each block.
Best...