Date: Mon, 28 January 2019 10:00:00 -0500
From: DATACAD-TECH
Subject: TECH-DBUG Digest Monday, January 28 V2019 #001
Please remember to EDIT DOWN follow-up replies & Adjust Subject
----------------------------------------------------------------
datacad-dbug-digest Monday, January 28 2019 Volume 2019:No 001
DBUG> Datacad 12 file layer copy issue
DBUG> Datacad 12 file layer copy issue
DBUG> Datacad 12 file layer copy issue
-----------------------------------------------------------------
DBUG> Datacad 12 file layer copy issue
Date: Jan 26 2019
I opened a new file and wanted to import a layer from an existing file and insert it into the new dwg file. I used the file export and then the merge and the layer came in without an issue.
Now, I created all of my layers in the new dwg. And when I went to layer copy and copied the floor plan from the first layer to the other layers for editing to create the remodeled flr. Plan and other drawings, the copied layers all remained locked into the original layer and any changes I made on the copied layers also changed the other layers. What am I doing wrong?
Thanks;
Dennis Orr
-------------------------------------
DBUG> Datacad 12 file layer copy issue
Date: Jan 27 2019
Hmm.
I think I would have started a different way:
From the first drawing, I simply would have gone:
+ Layer, Active-Only then chosen the floor plan layer.
+ With the desired stuff on screen: Ctrl-E (select), Area, to highlight all. Then Copy.
+ In the second drawing: Ctrl-V paste that stuff into a waiting layer.
+ Then gone from there.
I opened a new file and wanted to import a layer from an existing file and insert it into the new dwg file. I used the file export and then the merge and the layer came in without an issue.
Now, I created all of my layers in the new dwg. And when I went to layer copy and copied the floor plan from the first layer to the other layers for editing to create the remodeled flr. Plan and other drawings, the copied layers all remained locked into the original layer and any changes I made on the copied layers also changed the other layers. What am I doing wrong?
-----------------------------------
DBUG> Datacad 12 file layer copy issue
From: Albert Jackman
Date: 28 Jan 2019 7:10am
James
Your method is what I use. The copy and paste feature in Dcad is amazing
Skipp
-------------------------------------
End of datacad-dbug-digest V2019 #001
*************************************