Fwd: CS130 -- Requirements Document V2 IBM Team 2

12 views
Skip to first unread message

Stephanie Tung

unread,
May 23, 2012, 12:01:11 AM5/23/12
to cs130-ibm-project-...@googlegroups.com
Grade for SRS

---------- Forwarded message ----------
From: Jerrid Matthews <matt...@ucla.edu>
Date: Tue, May 22, 2012 at 8:08 PM
Subject: CS130 -- Requirements Document V2 IBM Team 2
To: Stephanie Tung <tung.st...@gmail.com>



Hello,
Technical Document Team Grade (as is): 67% of 100%
Please see my attached feedback regarding your team's Technical document submission. Also, note the email that I sent to all students.

Regards,
Jerrid 

IBM_Team2_Requirements_V2.doc

Jessica Tai

unread,
May 23, 2012, 12:26:52 AM5/23/12
to cs130-ibm-project-...@googlegroups.com
I will be updating the use cases in section 4 locally then re-uploading to google docs bc its a lot easier to add images.




--
You received this message because you are subscribed to the Google Groups "CS130 IBM PROJECT GROUP 2 (SPRING 2012)" group.
To post to this group, send email to cs130-ibm-project-...@googlegroups.com.
To unsubscribe from this group, send email to cs130-ibm-project-group-...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/cs130-ibm-project-group-2-spring-2012?hl=en.



--
Jessica Tai
Computer Science, UCLA

Jessica Tai

unread,
May 23, 2012, 1:40:11 AM5/23/12
to cs130-ibm-project-...@googlegroups.com
I've uploaded this to the Google Doc Collection but the formatting is a bit weird... attached is the one with the pictures w/i the margins. Feel free to change anything!! Not sure if I covered what Jerrid was going for.. modified section 2.3, 4, and 3.2
IBM_Team2_Requirements_V3_JTedits.doc

Jessica Tai

unread,
May 24, 2012, 2:37:46 AM5/24/12
to cs130-ibm-project-...@googlegroups.com, Rohit Seth
So, the SRS is due tomorrow at midnight. I can edit it up until 4 pm but then will be away from a computer the rest of the evening. If you could look over it to make sure that you are happy with the changes before we submit the final copy (and hopefully get more than a 67%!) that would be great!

Rohit should be sending out a version with the changes for section 3, external interfaces soon as well.

Thanks!
Jessica
IBM_Team2_Requirements_V3_JTedits.doc

Rohit Seth

unread,
May 24, 2012, 2:54:40 AM5/24/12
to cs130-ibm-project-...@googlegroups.com, Rohit Seth
Yeah, I'm going to have to change the screen shots in our SRS though since a lot of the text is tied to the pictures.  On that note, can I use screen caps of the current prototype?  Or should I use the mockups?

Jessica Tai

unread,
May 24, 2012, 2:57:18 AM5/24/12
to cs130-ibm-project-...@googlegroups.com, Rohit Seth
Since the SRS is usually done before implementation of the project, I think the mock-ups might be more suitable?

If you could edit and re-attach the srs document tonight so we can all review tomorrow that would be great!


On Wed, May 23, 2012 at 11:54 PM, Rohit Seth <ro...@medtek.net> wrote:
Yeah, I'm going to have to change the screen shots in our SRS though since a lot of the text is tied to the pictures.  On that note, can I use screen caps of the current prototype?  Or should I use the mockups?

--
You received this message because you are subscribed to the Google Groups "CS130 IBM PROJECT GROUP 2 (SPRING 2012)" group.

To post to this group, send email to cs130-ibm-project-...@googlegroups.com.
To unsubscribe from this group, send email to cs130-ibm-project-group-...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/cs130-ibm-project-group-2-spring-2012?hl=en.

Rohit Seth

unread,
May 24, 2012, 5:41:42 PM5/24/12
to cs130-ibm-project-...@googlegroups.com
It's up.  I made changes in regards to both the new and old feedback so please look over those sections when making changes.  Obviously if you find an error or a weak spot elsewhere feel free to patch it up.

Jessica Tai

unread,
May 24, 2012, 9:39:25 PM5/24/12
to cs130-ibm-project-...@googlegroups.com, Rohit Seth
Can you email out the .doc copy, Rohit? Its formatting will be better for the one we submit on courseweb. Nice edits





On Thu, May 24, 2012 at 2:41 PM, Rohit Seth <ro...@medtek.net> wrote:
It's up.  I made changes in regards to both the new and old feedback so please look over those sections when making changes.  Obviously if you find an error or a weak spot elsewhere feel free to patch it up.

--
You received this message because you are subscribed to the Google Groups "CS130 IBM PROJECT GROUP 2 (SPRING 2012)" group.

To post to this group, send email to cs130-ibm-project-...@googlegroups.com.
To unsubscribe from this group, send email to cs130-ibm-project-group-...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/cs130-ibm-project-group-2-spring-2012?hl=en.

Rohit Seth

unread,
May 24, 2012, 11:05:51 PM5/24/12
to cs130-ibm-project-...@googlegroups.com, Rohit Seth
Yeah.  Do we need to keep the comments in the final version?  Or shall I email out a version without the comments?

Jessica Tai

unread,
May 24, 2012, 11:12:23 PM5/24/12
to cs130-ibm-project-...@googlegroups.com, Rohit Seth

Keep the comments please.

On May 24, 2012 8:05 PM, "Rohit Seth" <ro...@medtek.net> wrote:
Yeah.  Do we need to keep the comments in the final version?  Or shall I email out a version without the comments?

--
You received this message because you are subscribed to the Google Groups "CS130 IBM PROJECT GROUP 2 (SPRING 2012)" group.

Rohit Seth

unread,
May 25, 2012, 1:18:16 AM5/25/12
to cs130-ibm-project-...@googlegroups.com
SRS.doc

Jessica Tai

unread,
May 25, 2012, 1:42:45 AM5/25/12
to cs130-ibm-project-...@googlegroups.com, Rohit Seth
okay! submitted version 3 of the srs. if you want to resubmit, please do but i may be hard to reach for the rest of the evening.

jessica
Reply all
Reply to author
Forward
0 new messages