Dear Meili
This is the value calculated from the definition of COLVAR in the input and from the coordinates.
Have you check the structure, apparently the defined CN is at the beginning larger than two, but it quickly goes to zero (in less than 0.5 ps)
and there it remains. You should be able to identify the corresponding structural change.
Have you monitored the dynamics of the CN?
I cannot judge whether this is the correct behaviour or whether the CN is correctly defined.
For sure it is not optimal to run MTD with only one CV. Moreover hills are spawned every 7.5 fs and the height of the hill is 1.36 eV, which is a lot.
Probably something went wrong in the sampling.
Regards
Marcella