The project team was able to complete the project after site preparation efforts and ancillary equipment installation, including new supply and return lines, utility lines (water, electricity, control wires, etc.), and control boxes and control logic. The new equipment addressed fugitive tracer gas losses that used to occur each time the charge hose was decoupled. Since the refrigerant dispensing system was at an advanced age, it was experiencing fugitive losses from the existing transfer lines, hoses, and relief valves. The improvement in performance and elimination of refrigerants translated to annual cost savings of $14,000 and a 58,000-pound reduction in refrigerant usage per year for the Clarksville plant.