I have a problem with IlvChart (Ilog Jviews).
I fill several datasets in a loop before they are painted in an
IlvChart.
The first time painting takes about 500ms, but this time increases
quickly and at twentieth loop, time is about 2s.
At each loop dataset are almost the same.
Has anyone encountered a similar problem ?
Thanks