Road closings for the week: 1/19/2026 to 1/26/2026

1 view
Skip to first unread message

inr...@bloomington.in.gov

unread,
Jan 16, 2026, 3:00:05 PMJan 16
to cob_road...@googlegroups.com
This is an automated email message from inRoads.

inRoads is a digital service of the City of Bloomington to publish planned
and future road closings, lane reductions, parking reservations and more.
inRoads can be accessed online at http://bloomington.in.gov/inroads.

########################################################
Road events for next week, 1/19/2026 to 1/26/2026:
########################################################

-------------------------------------------------
## Allen St. Bridge ##
Bridge between S Morton and S Walnut (150-156 W Allen St)

W Allen ST from S Morton ST to S Walnut ST

January 7, 2020 to January 7, 2027
Road Closed; expect to detour, signage in place.
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
https://bloomington.in.gov/inroads/events/view?id=3798

-------------------------------------------------
## Bloomington Convention Center Site Preparation ##
302 S Walnut st



June 27, 2025 to January 26, 2026
Lane Restriction; expect short delays, signage in place.
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
https://bloomington.in.gov/inroads/events/view?id=6556

-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
1314 N Eagleson Ave



September 8, 2025 to March 8, 2026
Lane Restriction; expect short delays, signage in place.
SC-IN E 17th St 523288_0167

Location: In the ROW at the corner of E 17th St and the private driveway.

Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.

Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.

Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
https://bloomington.in.gov/inroads/events/view?id=6589

-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
902 E Cottage Grove Ave



September 15, 2025 to March 15, 2026
Lane Restriction; expect short delays, signage in place.
SC-IN E Cottage Grove Ave 522219_0204

Location: In the ROW to the north of the apartment complex at 900 E Cottage Grove Ave

Type of Work: Replace existing utility pole with new 50' wood utility pole (43'-0" final above grade height) and install telecommunications equipment. See attached drawing for more details and scope of work.

Extent of closure: Lane closure and detour, sidewalk closure. See page 16 of submitted drawing.

Expected date and/or duration: 9/15/2025-3/15/2026.
The work is expected to take 3 days max with the area being opened during the evening hours.
https://bloomington.in.gov/inroads/events/view?id=6585

-------------------------------------------------
## Poplars Redevelopment ##
400 E 7th St



November 22, 2025 to March 2, 2026
Lane Restriction; expect short delays, signage in place.
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.

This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
https://bloomington.in.gov/inroads/events/view?id=6945

-------------------------------------------------
## Poplars Redevelopment ##
400 E 7th St



November 22, 2025 to June 18, 2026
Road Closed; expect to detour, signage in place.
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.

This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
https://bloomington.in.gov/inroads/events/view?id=6947

-------------------------------------------------
## ROW2025-10-2011 ##
W 11th from W Fountain Dr. to N. Adams St.



December 11, 2025 to January 29, 2026
Lane Restriction; expect short delays, signage in place.
This phase will last 2 weeks and will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
https://bloomington.in.gov/inroads/events/view?id=7004

-------------------------------------------------
## ROW2025-11-2102 ##
1104 N Grant



January 7, 2026 to January 21, 2026
Road Closed; expect to detour, signage in place.
3 days of alley closure for DUKE
https://bloomington.in.gov/inroads/events/view?id=7039

-------------------------------------------------
## ROW2025-10-2022 ##
2744 S Pinehurst DR



January 12, 2026 to January 26, 2026
Lane Restriction; expect short delays, signage in place.
Closure of southbound lane of S Pinehurst for one day between 01/12/2026 and 01/26/2026
https://bloomington.in.gov/inroads/events/view?id=6869

-------------------------------------------------
## ROW2025-12-2177 and 2176 ##
300 block of N Jefferson



January 14, 2026 to January 21, 2026
Lane Restriction; expect short delays, signage in place.
Lane restriction for utility connection
https://bloomington.in.gov/inroads/events/view?id=7051

-------------------------------------------------
## COMMERCIAL SERVICE ##
200 W 6TH ST



January 19, 2026
Road Closed; expect to detour, signage in place.
Meters: 200A&B, 202A&B, 204A&B, 200LZ, 206A&B, 208A
https://bloomington.in.gov/inroads/events/view?id=7055

-------------------------------------------------
## ROW2026-01-2209 ##
837 W 6th



January 21, 2026 to January 23, 2026
Road Closed; expect to detour, signage in place.
gas work
https://bloomington.in.gov/inroads/events/view?id=7056

########################################################
Future road events
########################################################

-------------------------------------------------
## Bloomington Convention Center Skywalk Installation ##
302 S College Ave



January 26, 2026 to February 9, 2026
Road Closed; expect to detour, signage in place.
Phase 2:
Sidewalk and road closures on S College, south of 3rd St as part of the project located at location. This request is to accommodate installation of the connector or “skybridge” . The traffic control would be in place from January 26th, 2026 through February 12, 2026 with a detour for vehicular traffic to Rogers St and a pedestrian detour to Walnut St and 2nd St

Phase 3:
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
https://bloomington.in.gov/inroads/events/view?id=7046

-------------------------------------------------
## Arlington Multifamily Project Lane Closures ##
1210 W Arlington Rd



March 2, 2026 to June 16, 2026
Lane Restriction; expect short delays, signage in place.
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.

Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
https://bloomington.in.gov/inroads/events/view?id=6994

-----------------------------------------------------------