Road closings for the week: 12/15/2025 to 12/22/2025

0 views
Skip to first unread message

inr...@bloomington.in.gov

unread,
Dec 12, 2025, 3:00:05 PM12/12/25
to cob_road...@googlegroups.com
This is an automated email message from inRoads.

inRoads is a digital service of the City of Bloomington to publish planned
and future road closings, lane reductions, parking reservations and more.
inRoads can be accessed online at http://bloomington.in.gov/inroads.

########################################################
Road events for next week, 12/15/2025 to 12/22/2025:
########################################################

-------------------------------------------------
## Allen St. Bridge ##
Bridge between S Morton and S Walnut (150-156 W Allen St)

W Allen ST from S Morton ST to S Walnut ST

January 7, 2020 to January 7, 2027
Road Closed; expect to detour, signage in place.
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
https://bloomington.in.gov/inroads/events/view?id=3798

-------------------------------------------------
## Bloomington Convention Center Site Preparation ##
302 S Walnut st



June 27, 2025 to January 26, 2026
Lane Restriction; expect short delays, signage in place.
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
https://bloomington.in.gov/inroads/events/view?id=6556

-------------------------------------------------
## ROW2025-04-1544 ##
Multiple locations within the city



July 1, 2025 to April 28, 2026
Lane Restriction; expect short delays, signage in place.
Single lane closures for Circuit Sectionalization
https://bloomington.in.gov/inroads/events/view?id=6676

-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
720 N grant St



July 7, 2025 to December 20, 2025
Lane Restriction; expect short delays, signage in place.
SC-IN E 11th St 510454_0003

Location: In the ROW at the intersecting corner of E 11th St and N Grant St.

Type of work: Type of work: Equipment swap/upgrade of telecommunications equipment at an existing small cell site. See attached drawing for more details and scope of work.

Extent of Closure: Closure at the side of an intersection, Crosswalk closures and pedestrian detours - see pages 9 & 10 of submitted drawing.

Expected date and/or duration: 6/20/2025-12/20/2025
The work is estimated to take 3 days max with the lanes and sidewalks open during the evenings when the crew is not onsite.
https://bloomington.in.gov/inroads/events/view?id=6587

-------------------------------------------------
## ROW2025-08-1837 ##
Work Site: Along W. Arlington Rd., W. Gourley Pike, & W. Hickory Ln.



September 2, 2025 to August 12, 2026
Lane Restriction; expect short delays, signage in place.
1-2 day single lane closure and sidewalk detour when needed.

Type of work: replacing equipment only on 16 existing poles (814-1258, 155-359, 155-363, 176-557, 167-785, 167-786, 152-504, 289-338, 152-521, 761-193, 152-522, 176-556, 156-525, 152-524, 176-554, & 765-838), replacing 13 existing poles (155-404, 155-364, 155-366, 155-368, 152-541, 152-498, 152-499, 152-500, 152-501, 152-503, 152-506, 152-519, & 152-523), replacing span guy from Pole 155-364 to Pole 291-976, from Pole 155-366 to Pole 155-367, from Pole 155-368 to Pole 179-651, from Pole 152-519 to Pole 289-338, & from Pole 152-523 to Pole 152-524, restaple pole ground on existing Pole 167-784, installing new equipment only on existing Pole 167-783, & bond down guys on existing Pole 152-531
https://bloomington.in.gov/inroads/events/view?id=6762

-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
1314 N Eagleson Ave



September 8, 2025 to March 8, 2026
Lane Restriction; expect short delays, signage in place.
SC-IN E 17th St 523288_0167

Location: In the ROW at the corner of E 17th St and the private driveway.

Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.

Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.

Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
https://bloomington.in.gov/inroads/events/view?id=6589

-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
902 E Cottage Grove Ave



September 15, 2025 to March 15, 2026
Lane Restriction; expect short delays, signage in place.
SC-IN E Cottage Grove Ave 522219_0204

Location: In the ROW to the north of the apartment complex at 900 E Cottage Grove Ave

Type of Work: Replace existing utility pole with new 50' wood utility pole (43'-0" final above grade height) and install telecommunications equipment. See attached drawing for more details and scope of work.

Extent of closure: Lane closure and detour, sidewalk closure. See page 16 of submitted drawing.

Expected date and/or duration: 9/15/2025-3/15/2026.
The work is expected to take 3 days max with the area being opened during the evening hours.
https://bloomington.in.gov/inroads/events/view?id=6585

-------------------------------------------------
## Poplars Redevelopment ##
400 E 7th St



November 22, 2025 to March 2, 2026
Lane Restriction; expect short delays, signage in place.
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.

This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
https://bloomington.in.gov/inroads/events/view?id=6945

-------------------------------------------------
## Poplars Redevelopment ##
400 E 7th St



November 22, 2025 to June 18, 2026
Road Closed; expect to detour, signage in place.
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.

This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
https://bloomington.in.gov/inroads/events/view?id=6947

-------------------------------------------------
## ROW2025-08-1895 ##
1722 S High ST



November 24, 2025 to December 18, 2025
Lane Restriction; expect short delays, signage in place.
SIngle lane restriction of south bound lane of S High ST
https://bloomington.in.gov/inroads/events/view?id=6876

-------------------------------------------------
## ROW2025-08-1877 ##
S Walnut Street PIKE



November 26, 2025 to August 22, 2026
Lane Restriction; expect short delays, signage in place.
1–2 day lane restriction for pole replacement
https://bloomington.in.gov/inroads/events/view?id=6767

-------------------------------------------------
## ROW2025-09-1983 ##
Banneker CC.



December 8, 2025 to December 31, 2025
Road Closed; expect to detour, signage in place.
Full Closure of W 7th
https://bloomington.in.gov/inroads/events/view?id=6976

-------------------------------------------------
## ROW2025-12-2149 ##
Full closure of alley on the East side of the church



December 9, 2025 to December 23, 2025
Road Closed; expect to detour, signage in place.
Service Master and Wells Masonry will be sharing this alley closure to complete work need for restoration of church.
https://bloomington.in.gov/inroads/events/view?id=6996

-------------------------------------------------
## ROW2025-10-2011 ##
W 11th from W Fountain Dr. to N. Adams St.



December 11, 2025 to December 25, 2025
Lane Restriction; expect short delays, signage in place.
This phase will last 2 weeks and will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
https://bloomington.in.gov/inroads/events/view?id=7004

-------------------------------------------------
## City of Bloomington Utilities
Lane Closure ##
Far right lane CLOSED at 2500 E 3rd St & S Woodscrest Dr. for service line repair.



December 11, 2025 daily until December 25, 2025
Lane Restriction; expect short delays, signage in place.
CBU is closing the far right lane at 2500 E 3rd St & S Woodscrest Drive - 10am - 3pm.
https://bloomington.in.gov/inroads/events/view?id=7006

########################################################
Future road events
########################################################

-------------------------------------------------
## W Bloomfield Road Closure ##
In front of Twin Lakes Recreation Center on West Bloomfield Rd, Bewteen S Weimer Road and Cory Lane



December 24, 2025 20:30 pm to 06:00 am December 25, 2025
Road Closed; expect to detour, signage in place.
This road is closed due to a water main break.
https://bloomington.in.gov/inroads/events/view?id=6239

-------------------------------------------------
## ROW2025-10-2022 ##
2744 S Pinehurst DR



January 12, 2026 to January 26, 2026
Lane Restriction; expect short delays, signage in place.
Closure of southbound lane of S Pinehurst for one day between 01/12/2026 and 01/26/2026
https://bloomington.in.gov/inroads/events/view?id=6869

-------------------------------------------------
## Arlington Multifamily Project Lane Closures ##
1210 W Arlington Rd



March 2, 2026 to June 16, 2026
Lane Restriction; expect short delays, signage in place.
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.

Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
https://bloomington.in.gov/inroads/events/view?id=6994

-----------------------------------------------------------