Road events for next week, 9/29/2025 to 10/6/2025:
########################################################
-------------------------------------------------
## Allen St. Bridge ##
Bridge between S Morton and S Walnut (150-156 W Allen St)
W Allen ST from S Morton ST to S Walnut ST
January 7, 2020 to January 7, 2027
Road Closed; expect to detour, signage in place.
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
https://bloomington.in.gov/inroads/events/view?id=3798
-------------------------------------------------
## Poplars Redevelopment Project ##
400 E 7th St
February 17, 2025 to November 21, 2025
Lane Restriction; expect short delays, signage in place.
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
https://bloomington.in.gov/inroads/events/view?id=6277
-------------------------------------------------
## Kirkwood 2025 Pedestrian Season / Dining Closure ##
E kirkwood Ave
April 2, 2025 to November 14, 2025
Road Closed; expect to detour, signage in place.
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
https://bloomington.in.gov/inroads/events/view?id=6402
-------------------------------------------------
## Duke Energy Lane Closure ##
1606 S Rogers St
May 1, 2025 to October 31, 2025
Lane Restriction; expect short delays, signage in place.
Lane restrictions for pole work
https://bloomington.in.gov/inroads/events/view?id=6275
-------------------------------------------------
## Bloomington Convention Center Site Preparation ##
302 S Walnut st
June 27, 2025 to January 26, 2026
Lane Restriction; expect short delays, signage in place.
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
https://bloomington.in.gov/inroads/events/view?id=6556
-------------------------------------------------
## ROW2025-04-1544 ##
Multiple locations within the city
July 1, 2025 to April 28, 2026
Lane Restriction; expect short delays, signage in place.
Single lane closures for Circuit Sectionalization
https://bloomington.in.gov/inroads/events/view?id=6676
-------------------------------------------------
## Duke Energy Lane Closures ##
315 E North Dr
July 1, 2025 to November 30, 2025
Lane Restriction; expect short delays, signage in place.
WO #46704275, 1-2 days of lane closures per location
Sheet 1 - Replacing overhead equipment on pole # 765-564 on E side of S Walnut Street. Replacing pole # 161-169 on E side of S Walnut Street
Sheet 2 - Replacing pole # 164-173 on S side of E North Drive. Replacing pole # 164-174 on N side of E North Drive. Replacing overhead equipment on pole # 164-172 on N side of E North Drive.
Sheet 3 - Replacing pole #'s 174-456, 174-458, and 764-768 on N side of E North Drive.
No overnight closures. Please allow 3 business days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6384
-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
720 N grant St
July 7, 2025 to December 20, 2025
Lane Restriction; expect short delays, signage in place.
SC-IN E 11th St 510454_0003
Location: In the ROW at the intersecting corner of E 11th St and N Grant St.
Type of work: Type of work: Equipment swap/upgrade of telecommunications equipment at an existing small cell site. See attached drawing for more details and scope of work.
Extent of Closure: Closure at the side of an intersection, Crosswalk closures and pedestrian detours - see pages 9 & 10 of submitted drawing.
Expected date and/or duration: 6/20/2025-12/20/2025
The work is estimated to take 3 days max with the lanes and sidewalks open during the evenings when the crew is not onsite.
https://bloomington.in.gov/inroads/events/view?id=6587
-------------------------------------------------
## Duke Energy Lane Closure ##
2490 S Burberry Ln
July 15, 2025 to October 31, 2025
Lane Restriction; expect short delays, signage in place.
WO # 42544946, lane closure for Installing new pole # MNI-20082 along S side of E Winslow Road. No overnight closure. Work will be completed in 1 day, but please allow for 3 days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6272
-------------------------------------------------
## Duke Energy Lane Closure ##
3874 S Laurel Ct
July 15, 2025 to October 31, 2025
Lane Restriction; expect short delays, signage in place.
WO # 56247048
Sheet 1 - Replacing overhead equipment on pole # 173-250 on west side of S Walnut Street Pike.
Sheet 2 - Replacing pole # 153-257 on E side of S Walnut Street Pike. Replacing pole #'s 153-256 and 153-253 on W side of S Walnut Street Pike.
Sheet 3 - Replacing pole #'s 153-260 and 153-258 along E side of S Walnut Street Pike.
Sheet 4 - Replacing pole # 151-208 along W side of S Walnut Street Pike. Replacing pole #'s 179-898 and 151-207 along W side of S Walnut Street Pike.
Sheet 5 - Replacing pole # 171-200 along E side of S Walnut Street Pike.
Sheet 6 - Replacing pole # 151-197 along W side of S Walnut Street Pike. Replacing overhead equipment on pole # 763-221 along E side of S Henderson Street.
No overnight closures. Work will take 1 day in each location, but please allow for 7 business days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6335
-------------------------------------------------
## Duke Energy Overhead Pole Equipment Replacement ##
2630 S Rogers ST
August 1, 2025 to November 30, 2025
Lane Restriction; expect short delays, signage in place.
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Watson St to replace overhead equipment on on pole # 814-4433 at the north west intersection of W Watson St and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
https://bloomington.in.gov/inroads/events/view?id=6174
-------------------------------------------------
## Duke Energy Overhead Equipment Replacement ##
2315 S Rogers ST
August 1, 2025 to November 30, 2025
Lane Restriction; expect short delays, signage in place.
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Coolidge Dr to replace overhead equipment on pole # 814-4444 at the North East intersection of W Coolidge Dr and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
https://bloomington.in.gov/inroads/events/view?id=6176
-------------------------------------------------
## Duke Energy Lane Closure ##
327 S Rogers
August 1, 2025 to November 30, 2025
Road Closed; expect to detour, signage in place.
WO # 41372422, Replacing overhead equipment on pole # 814-4426 at 2721 S Rogers Street. Pole is on the south east side of W Country Club Dr and S Rogers Street intersection. No overnight closure. Work will take 1-2 hours.
https://bloomington.in.gov/inroads/events/view?id=6264
-------------------------------------------------
## Hopwell West (S. Jackson Street & S. Rogers Street) ##
S. Rogers St from W 1st St and W 2nd St
August 4, 2025 to October 31, 2025
Lane Restriction; expect short delays, signage in place.
The construction of one block of Jackson Street and the reconstruction of one block of Rogers Street, from 1st Street to 2nd Street. The project scope includes installation of new stormwater infrastructure, sidewalks, a multi-use path, and a protected bike lane.
https://bloomington.in.gov/inroads/events/view?id=6683
-------------------------------------------------
## Noth Walnut Street Resurfacing Project ##
North Walnut Street from the SR 45 Bypass to 400 feet north of N Old 37
August 4, 2025 to November 1, 2025
Lane Restriction; expect short delays, signage in place.
Curb ramp replacements, curb repair, guardrail repair, removal of excess pavement, and updates to signs and markings.
https://bloomington.in.gov/inroads/events/view?id=6682
-------------------------------------------------
## ROW2025-07-1786 ##
S Cory Ln just south of the Intersection of 3rd St and S Cory Ln
August 11, 2025 to September 30, 2025
Lane Restriction; expect short delays, signage in place.
closure of south bound lane of S Cory Ln just south of the Intersection of 3rd St and S Cory Ln
https://bloomington.in.gov/inroads/events/view?id=6669
-------------------------------------------------
## ROW2025-07-1786- ##
Left hand turn lane of West bound 3rd street at the intersection of 3rd and S Cory Ln
August 11, 2025 to September 30, 2025
Lane Restriction; expect short delays, signage in place.
2 day closure between 08/11 and 9/30
https://bloomington.in.gov/inroads/events/view?id=6667
-------------------------------------------------
## Duke Energy Lane Closure ##
2106 E 3nd St
August 15, 2025 to October 31, 2025
Lane Restriction; expect short delays, signage in place.
WO # 42544989, 1 day lane closure for replacing overhead equipment on pole # 167-653 along the east side of S High Street. No overnight closure. Work will take 1 day, but please allow for 3 days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6287
-------------------------------------------------
## Duke Energy Lane Restriction ##
2425 S Rogers
August 15, 2025 to September 30, 2025
Lane Restriction; expect short delays, signage in place.
WO 40995878, Replacing overhead equipment (Crossarm, clevises, and pin insulators) on pole # 814-4442. Lane restriction will take place on East side of S Rogers street, and traffic flagging will take place for Northbound traffic on S Rogers Street. Work should take only 1 day, but please allow for 3 days in case of inclement weather. No overnight closure. Work will be completed using a bucket truck.
https://bloomington.in.gov/inroads/events/view?id=6266
-------------------------------------------------
## Duke Energy Lane Closure ##
1805 S Walnut St
August 15, 2025 to November 30, 2025
Lane Restriction; expect short delays, signage in place.
WO # 4254498, 1 day lane closure on east side of S Walnut St for removing electronic relcoser on pole # 151-134 along east side of S Walnut Street. No overnight closure. Work will be completed in 1 day, but please allow for up to 3 days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6285
-------------------------------------------------
## Duke Energy Lane Closure ##
1906 E Hillside
August 15, 2025 to November 30, 2025
Lane Restriction; expect short delays, signage in place.
WO # 42544994, Installing new pole # MNI-20164 Along SW corner of E Hillside Drive and S Clifton Avenue. No overnight closure. Work should take 1 day, but please allow for 3 days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6273
-------------------------------------------------
## Kinser Ridge -- FULL CLOSURE OF W ACUFF ##
1030 W Acuff
August 18, 2025 to October 7, 2025
Road Closed; expect to detour, signage in place.
Full closure of W Acuff
https://bloomington.in.gov/inroads/events/view?id=6712
-------------------------------------------------
## Duke 1-2 day closure of W Dodds alleyway ##
508 W Dodds St
August 27, 2025 to October 27, 2025
Road Closed; expect to detour, signage in place.
WO # 52851282. 1-2 Day closure of the alleyway between W Dodds St and W Wylie St adjacent to 508 W Dodds St occuring between 08/27/25 and 10/27/25. Replacing overhead equipment on 5 poles. No overnight closure.
https://bloomington.in.gov/inroads/events/view?id=5973
-------------------------------------------------
## ROW2025-08-1837 ##
Work Site: Along W. Arlington Rd., W. Gourley Pike, & W. Hickory Ln.
September 2, 2025 to August 12, 2026
Lane Restriction; expect short delays, signage in place.
1-2 day single lane closure and sidewalk detour when needed.
Type of work: replacing equipment only on 16 existing poles (814-1258, 155-359, 155-363, 176-557, 167-785, 167-786, 152-504, 289-338, 152-521, 761-193, 152-522, 176-556, 156-525, 152-524, 176-554, & 765-838), replacing 13 existing poles (155-404, 155-364, 155-366, 155-368, 152-541, 152-498, 152-499, 152-500, 152-501, 152-503, 152-506, 152-519, & 152-523), replacing span guy from Pole 155-364 to Pole 291-976, from Pole 155-366 to Pole 155-367, from Pole 155-368 to Pole 179-651, from Pole 152-519 to Pole 289-338, & from Pole 152-523 to Pole 152-524, restaple pole ground on existing Pole 167-784, installing new equipment only on existing Pole 167-783, & bond down guys on existing Pole 152-531
https://bloomington.in.gov/inroads/events/view?id=6762
-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
1314 N Eagleson Ave
September 8, 2025 to March 8, 2026
Lane Restriction; expect short delays, signage in place.
SC-IN E 17th St 523288_0167
Location: In the ROW at the corner of E 17th St and the private driveway.
Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.
Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
https://bloomington.in.gov/inroads/events/view?id=6589
-------------------------------------------------
## Hopwell West (S. Jackson Street & S. Rogers Street) ##
W 1st Street from S Fairview St to S Rogers St
September 11, 2025 to October 3, 2025
Road Closed; expect to detour, signage in place.
The construction of one block of Jackson Street and the reconstruction of one block of Rogers Street, from 1st Street to 2nd Street. The project scope includes installation of new stormwater infrastructure, sidewalks, a multi-use path, and a protected bike lane.
https://bloomington.in.gov/inroads/events/view?id=6684
-------------------------------------------------
## Duke Energy Alleyway Closure ##
409 S Walnut St
September 15, 2025 to November 30, 2025
Road Closed; expect to detour, signage in place.
WO # 42544967, Replacing pole # 152-907 in alleyway south of E Smith Avenue and West of S Walnut Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6268
-------------------------------------------------
## Duke Energy Lane Closure ##
2610 E Moores Pk
September 15, 2025 to November 30, 2025
Lane Restriction; expect short delays, signage in place.
WO # 42544965, lane closure on Installing new pole # MNI-12564 along S Side of E Moores Pike. No overnight closure. Work should be completed in 1 day, but please allow for 3 days in case of inclement weather.
https://bloomington.in.gov/inroads/events/view?id=6269
-------------------------------------------------
## Duke Energy Pole Work ##
612 E Atwater Dr
September 15, 2025 to October 31, 2025
Lane Restriction; expect short delays, signage in place.
WO #45028886, 1-2 lane closure in the eastbound lane of Atwater Ave to replace overhead equipment on pole # 177-201 and installing new pole # MNI-12665.
https://bloomington.in.gov/inroads/events/view?id=5862
-------------------------------------------------
## Milling and Resurfacing on W 11th St ##
W 11th St from W Fountain Dr to N Fairview St
September 15, 2025 06:00 am to 16:00 pm October 2, 2025
Lane Restriction; expect short delays, signage in place.
Lane Restrictions and No Parking on W 11th St from W Fountain Dr to N Fairview St for milling and resurfacing.
https://bloomington.in.gov/inroads/events/view?id=6737
-------------------------------------------------
## Crown Castle Small Cell Tower Work ##
902 E Cottage Grove Ave
September 15, 2025 to March 15, 2026
Lane Restriction; expect short delays, signage in place.
SC-IN E Cottage Grove Ave 522219_0204
Location: In the ROW to the north of the apartment complex at 900 E Cottage Grove Ave
Type of Work: Replace existing utility pole with new 50' wood utility pole (43'-0" final above grade height) and install telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Lane closure and detour, sidewalk closure. See page 16 of submitted drawing.
Expected date and/or duration: 9/15/2025-3/15/2026.
The work is expected to take 3 days max with the area being opened during the evening hours.
https://bloomington.in.gov/inroads/events/view?id=6585
-------------------------------------------------
## Lane Restrictions for Hand Rail Repairs ##
W 3rd St from S Madison St to S College Ave
September 22, 2025 06:00 am to 16:00 pm October 3, 2025
Lane Restriction; expect short delays, signage in place.
The northern most westbound lane of W 3rd St from S Madison St to S College Ave will be closed for hand rail repairs. Traffic will still be able to use the southern most westbound lane. Signage will be in place.
https://bloomington.in.gov/inroads/events/view?id=6735
-------------------------------------------------
## CBU - Water and Sewer Main Work - Phase #4 ##
W 2nd Street from west of the B-Line Trail to east of Rogers Street.
September 22, 2025 to October 8, 2025
Road Closed; expect to detour, signage in place.
Beginning Monday, September 22, CBU will close W 2nd Street, from just west of the B-Line Trail to just east of Rogers Street, to continue sewer and water line improvements. This phase is anticipated to last through Wednesday, October 8, allowing time for water line testing and final road restoration.
https://bloomington.in.gov/inroads/events/view?id=6773
-------------------------------------------------
## Thornton/Arden Greenway and S Washington Traffic Calming Project ##
Thornton Dr from Olive St to High St.
S Washington St from 1st St to Grimes Ln.
S Washington ST from E 1st ST to E Grimes LN
E Thornton DR from S Olive ST to S Oxford DR
E Arden DR from S Oxford DR to S High ST
September 22, 2025 to October 10, 2025
Lane Restriction; expect short delays, signage in place.
Thornton Dr will have new curbs and new curb ramps placed throughout. There will also be asphalt speed humps installed. Along S Washington St, there will be asphalt speed humps installed. When speed humps are being installed, there may be a limited time road closure. Speed cushion installation will occur near the end of Spetember and beginning of October
https://bloomington.in.gov/inroads/events/view?id=6324
-------------------------------------------------
## ROW2025-07-1771 - Single lane closure ##
Eastbound lane of Miller at 1800 S Huntington Gardens
September 24, 2025 to October 1, 2025
Lane Restriction; expect short delays, signage in place.
Single lane Closure
https://bloomington.in.gov/inroads/events/view?id=6692
-------------------------------------------------
## ROW2025-09-1951-
ROW2025-09-1952- ##
1919 N Kinser Pike-
1925 N Kinser Pike-
September 29, 2025 to October 6, 2025
Lane Restriction; expect short delays, signage in place.
Single lane closure of South bound lane of N Kinser Pike
https://bloomington.in.gov/inroads/events/view?id=6793
-------------------------------------------------
## CBU - Fire Hydrant Repair ##
S Sare Rd between E Moores Pike and E Cathcart St.
September 29, 2025 09:00 am to 14:00 pm
Lane Restriction; expect short delays, signage in place.
CBU will be replacing a fire hydrant that was recently damaged on S Sare Rd., between E Moores Pike and E Cathcart St. Work is scheduled to begin on Monday, September 29, 2025, at 9:00 a.m. and is expected to be completed by 2:00 p.m. the same day.
https://bloomington.in.gov/inroads/events/view?id=6796
-------------------------------------------------
## Milling and Resurfacing on W Fountain Dr ##
W Fountain Dr from N Crescent Rd to the railroad tracks
September 29, 2025 06:00 am to 16:00 pm October 2, 2025
Lane Restriction; expect short delays, signage in place.
Lane Restrictions on W Fountain Dr from N Crescent Rd to the railroad tracks for milling and resurfacing.
https://bloomington.in.gov/inroads/events/view?id=6797
-------------------------------------------------
## Lane Restrictions on E 3rd St for Utility Cut Repair ##
E 3rd St between S Clarizz Blvd and S Smith Rd
September 29, 2025 06:00 am to 16:00 pm
Lane Restriction; expect short delays, signage in place.
Westbound lane restrictions on E 3rd St between S Clarizz Blvd and S Smith Rd for utility cut repair. Signage will be in place.
https://bloomington.in.gov/inroads/events/view?id=6799
-------------------------------------------------
## Hoosier Hoops on Kirkwood Event ##
300/400/500 blocks of Kirkwood and Grant St from 6th to 4th and Dunn St from 6th to 4th
October 2, 2025
Road Closed; expect to detour, signage in place.
Hoosier Hoops on Kirkwood Event
https://bloomington.in.gov/inroads/events/view?id=6781
########################################################
Future road events
########################################################
-------------------------------------------------
## QC Communication Lane Closure ##
4223 N Kinser Pk
October 6, 2025 to October 10, 2025
Road Closed; expect to detour, signage in place.
single day of lane closure for boring 148' of conduit on the west side of N Kinser Pk adjacent to 4223 N Kinser Pk between 10/6/25 and 10/10/25.
https://bloomington.in.gov/inroads/events/view?id=6788
-------------------------------------------------
## CBU - Water and Sewer Main Work - Phase #5 ##
Intersection of Rogers Street and W 2nd Street.
October 8, 2025 20:00 pm to 06:00 am October 9, 2025
Road Closed; expect to detour, signage in place.
Overnight work requiring the closure of the intersection of Rogers Street and W 2nd Street is scheduled for Wednesday, October 8, from 8:00 p.m. until Thursday, October 9, at 6:00 a.m. CBU expects this phase to be completed within the overnight timeframe.
https://bloomington.in.gov/inroads/events/view?id=6774
-------------------------------------------------
## CBU - Water and Sewer Main Work - Phase #6 ##
W 2nd Street just west of the Rogers Street Intersection
October 8, 2025 20:00 pm to 15:00 pm October 9, 2025
Road Closed; expect to detour, signage in place.
W 2nd Street just west of Rogers Street is planned to reopen on Thursday, October
9, following completion of Phase 5. If sewer work progresses smoothly, portions of Phase 6 may also
be completed at that time, with only final road repairs remaining.
https://bloomington.in.gov/inroads/events/view?id=6792
-------------------------------------------------
## IU Homecoming Parade ##
Woodlawn from 17th to 7th
October 17, 2025 17:30 pm to 19:30 pm
Road Closed; expect to detour, signage in place.
IU Homecoming Parade
https://bloomington.in.gov/inroads/events/view?id=6748
-------------------------------------------------
## ROW2025-08-1895 ##
1722 S High ST
October 22, 2025 to November 5, 2025
Lane Restriction; expect short delays, signage in place.
-Replace transformer and overhead service
-Close southbound lane of S High St
-Close for one day between 10/22/25 and 11/5/25
https://bloomington.in.gov/inroads/events/view?id=6778
-------------------------------------------------
## Trades District Block Party ##
Madison b/t 10th and 11th; Makers Way b/t Rogers and Madison
November 7, 2025
Road Closed; expect to detour, signage in place.
Trades District Block Party
https://bloomington.in.gov/inroads/events/view?id=6750
-------------------------------------------------
## ROW2025-08-1877 ##
S Walnut Street PIKE
November 26, 2025 to August 22, 2026
Lane Restriction; expect short delays, signage in place.
1–2 day lane restriction for pole replacement
https://bloomington.in.gov/inroads/events/view?id=6767
-------------------------------------------------
## ROW2025-09-1938
2 day lane restriction of Eastbound lane ##
1609 W Allen ST
December 1, 2025 to December 15, 2025
Lane Restriction; expect short delays, signage in place.
-WO 59205855
-1609 W Allen St
-Replace equipment on pole 161-502, replace pole 161-504
-Close eastbound lane of W Allen St
https://bloomington.in.gov/inroads/events/view?id=6779
-------------------------------------------------
## W Bloomfield Road Closure ##
In front of Twin Lakes Recreation Center on West Bloomfield Rd, Bewteen S Weimer Road and Cory Lane
December 24, 2025 20:30 pm to 06:00 am December 25, 2025
Road Closed; expect to detour, signage in place.
This road is closed due to a water main break.
https://bloomington.in.gov/inroads/events/view?id=6239
-----------------------------------------------------------