Marina Parking lot

3 views
Skip to first unread message

12air

unread,
Sep 21, 2011, 1:36:59 PM9/21/11
to Marina Coastal Condors
Hello all,

As of yesterday the State has fenced off the Northwest corner of the
parking lot to begin construction of the New bathrooms.

Does anyone...new "el Presidente", have any idea when to remove and
replace the insturments, connections, and possibly the power?

Also of note: the ramp area looks like crap.
Maybe a meeting to set a date before winter to clean up the mess.

Best Regards,

12air

Dennis Bowman

unread,
Sep 21, 2011, 6:46:20 PM9/21/11
to coastal...@googlegroups.com
12Air,
I forwarded this on to the new president.
Ex El Presidente'

Steve Cahill

unread,
Sep 22, 2011, 2:14:34 AM9/22/11
to coastal...@googlegroups.com
Gents: let me know when the windtalker setup needs to be tweaked for changes. It seemed things were going a bit too smoothly. Sigh. Best-case would be some kind of temporary pole or stand for the anemometer just up the hill from the present location, while the new stuff is going in, assuming that the project takes months. That would be do-able pretty easily if the vault can stay in place; there's just some low-voltage cables to extend.
 
If the vault has to come out soon, we'd need a coresponding temporary cabinet at the base of the temporary pole, and a buried extension cord running up to it. I think.
 
Or perhaps the new construction will only take a few weeks (hope, hope) and we can just live with the out-of-service situation.
 
The good news is that I have the high-res cameras sorted out, more or less. Nothing installed, but it looks promising.
 
And, yes, I haven't forgotten that the new setup will need a simple local display for speed and direction. Having a schedule for the construction would help me plan that work - way better to get the mounting for it in place while construction is under way, than after.
 
Steve Cahill

Reply all
Reply to author
Forward
0 new messages