Dear colleagues,
Is the following scenario possible:
Mapping a VM (1 Core, 1000 MIPS) to a Host (4 Cores, 500 MIPS each core)
As I noticed when I configure my simulation based on this way (Hosts' cores greater in number but least in power), the simulation gets terminated and show errors about boundaries
Thanks in advance.