Hi, I was wondering how do you know when to use the present value budget constraint and the future value budget constraint?
Also, during lecture i wrote down a budget constraint that is (1+r)c1 + (1+pi)c2 = (1+r)m1 +(1+pi)m2 , what is the difference between this budget constraint and the present and future budget constraint?