CED Report

13 views
Skip to first unread message

Azreen Bakar

unread,
Aug 24, 2013, 10:57:36 AM8/24/13
to ced_...@googlegroups.com
Dear members,
So everybody notices that we have to submit the report on this Thursday right? But before that I would like to ask Karim, the evaluation form that you just rumpled on  that day of presentation, did you keep it or u've thrown it away? I forgot to tell u to keep it. I need to know what else they need it so I can include in our report. And Asyidah, could u please share here what have you wrote (the recommendation by the judges) on that presentation day?
Thank u very much. I look forward to do this report together. 

--
Nur Azreen Abu Bakar

B.Hons Civil Engineering 
Universiti Teknologi Petronas
Bandar Seri Iskandar, 31750 Tronoh, Perak, Malaysia.
azree...@yahoo.com
azree...@gmail.com

Abdel Karim Mohd. Elkhair

unread,
Aug 24, 2013, 11:04:48 AM8/24/13
to Azreen Bakar, ced_...@googlegroups.com
oh unfortunately i threw it awayim sorry..but im sure the GA aziz has a soft copy of it..aziz....@gmail.com


--
You received this message because you are subscribed to the Google Groups "CED Team 2" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ced_team2+...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.

nor asyidah mohd ahmadan

unread,
Aug 24, 2013, 11:05:25 AM8/24/13
to Azreen Bakar, ced_...@googlegroups.com
recommandation :

1.shear wall is part of RC, so its not one of the concept so we can replace it with composite.
2.we should consider the environmental impact assessment
3.water reticulation layout
4.should we use IBS?
5. I ask another group about soil investigation cost and they get around 10-15 K



On Sat, Aug 24, 2013 at 10:57 PM, Azreen Bakar <azree...@gmail.com> wrote:

--

Azreen Bakar

unread,
Aug 24, 2013, 11:06:01 AM8/24/13
to Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
I have a strong feeling he wont give it as easy as it seems. But ill try. 

Azreen Bakar

unread,
Aug 24, 2013, 11:08:18 AM8/24/13
to Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
thank you Syidah. about the IBS part I will consider it. Somehow for the other part I think we can start doing it now. I will draft the complete outline later after I got all the information and will divide for each of us to finish it. Thank you. 

Nadia Jalil

unread,
Aug 24, 2013, 11:12:12 AM8/24/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
I think i have the copy of the evaluation form. I will check as soon as i get back to utp.

Sent from my iPhone

Azreen Bakar

unread,
Aug 24, 2013, 11:11:47 AM8/24/13
to Nadia Jalil, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
thank you. 

Azreen Bakar

unread,
Aug 25, 2013, 9:19:02 PM8/25/13
to Nadia Jalil, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
IMPORTANT! Please note your task.
thank you very much. 

The report. I think you can start writing for each of your part.

1. INTRODUCTION - the company profile, the team, briefly about the project/ Azreen
2. Project Background - details about the background, location/Ashraf,Azreen
3. Project Planning - Scheduling, task, time management/Ashraf
4. Authorities Approval - OSC, drawings, plans/Ashraf
5. Soil Work & Sub-structure - soil investigation, sub-structure (piling) /Nadia
6. Infrastructure - Earthwork, Water Rec Layout, Drainage layout, environmental consideration/Karim
7. Building Structure - conceptual design, IBS/Shidah,Azreen
8. Conclusion - ALL

And one more thing, I do really hope you already have the idea since all of you were there on our presentation day. The way how they want the project to be, etc. And if you want me to check your work please give it to me early as I have another project to submit on the same day. Thank you very much. Let's work! :)

Nadia Jalil

unread,
Aug 25, 2013, 9:29:23 PM8/25/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
Noted with thanks.

Attached is the copy of the presentation evaluation form as requested.

Regards.
--
Nadia Binti Abdul Jalil 
3rd Year 1st Semester,
Bachelor (Hons) Civil Engineering,
Universiti Teknologi Petronas,
Tronoh, Perak.

IMG.pdf
IMG_0001.jpg

Abdel Karim Mohd. Elkhair

unread,
Aug 26, 2013, 7:04:14 AM8/26/13
to Nadia Jalil, Azreen Bakar, ced_...@googlegroups.com
noted 

nor asyidah mohd ahmadan

unread,
Aug 26, 2013, 8:20:20 AM8/26/13
to Abdel Karim Mohd. Elkhair, Nadia Jalil, Azreen Bakar, ced_...@googlegroups.com
noted

Abdel Karim Mohd. Elkhair

unread,
Aug 26, 2013, 3:33:14 PM8/26/13
to ashraf, nor asyidah mohd ahmadan, Nadia Jalil, Azreen Bakar, ced_...@googlegroups.com
and this is my part, the floor is open for any corrections :D


On Tue, Aug 27, 2013 at 1:12 AM, ashraf <ashraf...@gmail.com> wrote:
this is my part.if there is any correction,feel free to voice up your opinion

360.gif
environmental considerations, drainage and domestic water).docx

Azreen Bakar

unread,
Aug 26, 2013, 9:54:49 PM8/26/13
to Abdel Karim Mohd. Elkhair, ashraf, nor asyidah mohd ahmadan, Nadia Jalil, ced_...@googlegroups.com
I will go through later okay as I have bdct test today and also project to submit on the same day. I will as soon as possible. And you also can add up some more for your part if in case I left out some things. Help me to remember. thank you very much. 
360.gif

Nadia Jalil

unread,
Aug 27, 2013, 12:41:59 PM8/27/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ashraf, nor asyidah mohd ahmadan, ced_...@googlegroups.com
Ayin, is it possible to post the presentation slides here?

Thanks :)
360.gif

Azreen Bakar

unread,
Aug 27, 2013, 12:43:17 PM8/27/13
to Nadia Jalil, Abdel Karim Mohd. Elkhair, ashraf, nor asyidah mohd ahmadan, ced_...@googlegroups.com
i'm so sorry the file is too big. but I think i can shorten up. nak part mana? 
360.gif

Azreen Bakar

unread,
Aug 27, 2013, 6:17:40 PM8/27/13
to Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
Guys,
After being 'pushed' by Dr Amila, just want to let you know that I've decided to change our building design using IBS - Blockwork System.
You can watch this video for a clear idea. Good Luck.



On Sat, Aug 24, 2013 at 11:04 PM, Abdel Karim Mohd. Elkhair <abdelka...@gmail.com> wrote:

Nadia Jalil

unread,
Aug 27, 2013, 8:22:41 PM8/27/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
Thanks Ayin... Interesting video & idea~~ 

Nadia Binti Abdul Jalil 
Final Year 1st Semester,

Nadia Jalil

unread,
Aug 28, 2013, 2:14:40 AM8/28/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ashraf, nor asyidah mohd ahmadan, ced_...@googlegroups.com
Dear Ayin,

This is my part.

But without the earthwork. May i know what should i put in that section?

Thanks.
Nadia Binti Abdul Jalil 
Final Year 1st Semester,
360.gif
Foundation Part.docx
SI COST.docx

Azreen Bakar

unread,
Aug 28, 2013, 3:38:03 AM8/28/13
to Nadia Jalil, Abdel Karim Mohd. Elkhair, ashraf, nor asyidah mohd ahmadan, ced_...@googlegroups.com
Give me a moment. Kejap ehh.. ;)
360.gif

Azreen Bakar

unread,
Aug 28, 2013, 4:38:16 AM8/28/13
to Nadia Jalil, Abdel Karim Mohd. Elkhair, ashraf, nor asyidah mohd ahmadan, ced_...@googlegroups.com
something like this but based on our project i think. 
360.gif
Earthwork.docx

Nadia Jalil

unread,
Aug 28, 2013, 4:39:50 AM8/28/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ashraf, nor asyidah mohd ahmadan, ced_...@googlegroups.com
okay.. will send it to u later..

thanks
360.gif

Azreen Bakar

unread,
Aug 28, 2013, 8:38:52 AM8/28/13
to Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
GUYS, before I forgot could u please send me all your references in APA style format. Need to include in reference part. and i would like to ask ur opinion especially Nadia, the details of Soil Investigation cost, what do u think, do u want to include in the main report or appendices? 


On Sat, Aug 24, 2013 at 11:04 PM, Abdel Karim Mohd. Elkhair <abdelka...@gmail.com> wrote:

Nadia Jalil

unread,
Aug 28, 2013, 8:45:43 AM8/28/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
I will send u my references once i'm in my room. 

About the si cost,i think u can put in the report but if others think it should be put in the appendices that its fine. ;)

Thanks Ayin

Sent from my iPhone

nor asyidah mohd ahmadan

unread,
Aug 28, 2013, 12:57:44 PM8/28/13
to Nadia Jalil, Azreen Bakar, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
my part..if you guys want me to add anything just let me know..tq
project report CED- SYIDA.docx

Azreen Bakar

unread,
Aug 28, 2013, 8:43:21 PM8/28/13
to nor asyidah mohd ahmadan, Nadia Jalil, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com
Guys, good job for your work! I will print it by today of course as now I'm still compiling. Thank you very much for your cooperation. :)

Abdel Karim Mohd. Elkhair

unread,
Aug 29, 2013, 3:39:07 AM8/29/13
to Azreen Bakar, nor asyidah mohd ahmadan, Nadia Jalil, ced_...@googlegroups.com
no probs..we are one company :P ALKE for life

Azreen Bakar

unread,
Aug 29, 2013, 10:04:07 AM8/29/13
to Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com, Nadia Jalil, nor asyidah mohd ahmadan

Done. I've seen the reports by others also at Aziz's table, and I can tell ya we're not far behind. It just that i saw 1 very fancy report, full-graphics and stuff and it's doing offshore project. I'm 100% it's Azrul's and the geng. haha. however good job guys. Thank you. see ya in capstone 2. Good Luck for ur finals.

Nadia Jalil

unread,
Aug 29, 2013, 10:06:27 AM8/29/13
to Azreen Bakar, Abdel Karim Mohd. Elkhair, ced_...@googlegroups.com, nor asyidah mohd ahmadan
Thanks a lot Ayin. Thanks a lot everyone.  

About the report, haha, i'm sure its Azrul's group coz during the submission of company profile, they were really good in designing!

Good luck to everyone too!

See u guys soon!

Take care all...~~~
Reply all
Reply to author
Forward
0 new messages