Hey guys I just copied these thing from our previous discussion about final report. Since We already done the slides, so I bet you understand better regarding the content right??
So I think we can work at the cafe (previous place like usual so we can work it until night and until finish), starting at maybe around 2 I guess? Today?
I may come late because I want to settle my fyp lab first (sad right), so can you please work it out? Just refer to the slide. I think nadia or ashraf have it.
Final Report Draft Content:
Introduction
-The company
-The project
-etc,
1.0 Soil Investigation
-Soil properties
-Soil investigation detail (equipment, requirement)
-Soil investigation cost details
2.0 Statutory Submission Requirements
-Submission to authorities ( to every department, everything during CED 1)
-Earthwork Layout (Cut and fill section)
-Earthwork calculation (details)
-Submission time table (conclusion, OSC, etc)
3.0 Substructure
-Foundation Structure
= Piling Detail (RC square pile.....etc)
= Piling calculation (derived from the calculation of the building, later will finished by Shidah and me)
-Basement/ Wall System
= Retaining Wall Detail
=Retaining Wall Calculation
-Pilecap
= Pilecap Detail
=Pilecap Calculation
-Ground Floor Structural System
= Beam and Slabs Layout
= Calculation example (loading,etc)
= Column stump
-Other considerations
= Waterproofing
= Anti-Termites
4.0 Superstructure
- Column System = details & calculation
-Connection
- Beam system
- .....still in discussion....
5.0 Structural Analysis
- TBA *To be agreed later
6 , 7, 8, 9 - Please refer to the score sheets and make your own sub-topics
Cc : Ashraf and Karim
10.0 Quantity Surveying Works
- For this part, each of you need to do the research for your own part. Me and Ashraf just met Dr Shahir last week and he told me that the required cost is THE CONSTRUCTION COST, hence we need to come out with the amount from each of our part.
Construction Cost here means that all the cost from C&S (Civil Structural Works) which are :
- Earthworks
- Infrastructures (Road, Drainage, Water Reticulation, Wastewater Pipeline)
-Structural Work
--
Nur Azreen Abu Bakar
B.Hons Civil Engineering
Universiti Teknologi Petronas