Anybody signed agreement in October 2012 with Casa Imperia?

Deepali Joshi

unread,
Oct 11, 2014, 7:52:13 AM10/11/14
to Ramchandra Narkhede, casai...@googlegroups.com

Yes we did sign in Oct 2012

Ramchandra Narkhede

unread,
Oct 11, 2014, 8:04:10 AM10/11/14
to Deepali Joshi, casai...@googlegroups.com

As per the agreement builder needs to give posession within 24 months. If he fails to give posession, he needs to pay interest at the rate of 12%. You can call builder and ask for posession or interest. This way they will feel some presure.

I singed in dec so i cant call and ask for it. Those who have signed in oct, please call and ask for posession and/or interest @12%.

Abhijeet Bedare

unread,
Oct 12, 2014, 1:50:49 AM10/12/14
to Ramchandra Narkhede, Deepali Joshi, casai...@googlegroups.com
legally we cant as for that...
If u go through ur agreement, they must have clearly mentioned that, if the delay is because of things which are not in control of builder like government permissions or delay from supplier, they are not liable to pay the interest.
Please correct me if I'm wrong.  

Ramchandra Narkhede

unread,
Oct 12, 2014, 2:21:26 AM10/12/14
to Abhijeet Bedare, Deepali Joshi, casai...@googlegroups.com
True, but:

1. I don't think it's any thing related with permission from government. I was told by Pravin(person in place of Bhavana) that your flats are ready but they are delaying the possession only because the road is not ready. If at this is the case they should not have given possession for A building.

2. Also, it's only because the builder is working at slow pace. If it's about govt permission's what are they doing since last 2 years. 

Most of us were given the possession date as Nov 2013(Diwali). Some how we need to make them realize that we can't take this delay anymore.

Jatin

unread,
Oct 12, 2014, 7:54:23 AM10/12/14
to Ramchandra Narkhede, Abhijeet Bedare, Deepali Joshi, casai...@googlegroups.com
Hello

Do we know any other person then Dhananjay jain or can we all go there main office one day and talk to some other reliable person then Dhananjay, as Dhananjay and his team are marketing guys; speaking lies in there blood. 

Sent from my iPhone

Ramchandra Narkhede

unread,
Oct 17, 2014, 4:01:34 AM10/17/14
to Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare

Hi All,

I spoke to Dhananjay yesterday. He says Dec 15 we will get keys for interior work. And end of Jan possession. Also, it his final promise (I doubt).

Mr Dhananjaj jain-9767754184

Thanks,
Ram.

Ramchandra Narkhede

unread,
Nov 5, 2014, 11:48:12 PM11/5/14
to Jatin, joshid...@gmail.com, casai...@googlegroups.com, Abhijeet Bedare

Anybody has any update?

Jatin

unread,
Nov 6, 2014, 2:13:48 AM11/6/14
to Ramchandra Narkhede, joshid...@gmail.com, casai...@googlegroups.com, Abhijeet Bedare
I visited site before Diwali. I just visited first floor still couple of flats are not completed, did not go upstair. Did not meet any one in office. Lot of work still looks pending but they are sticking to this dec and Jan date. 
My guess Mostly without amenities if they can give possession they will give as per there date. With complete amenities I don't see Jan 2015 is feasible date.

Sent from my iPhone

Ramchandra Narkhede

unread,
Nov 8, 2014, 11:07:24 AM11/8/14
to Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare

Hi All,

Today I visited Casa Imperia. Noticed few things.

1. Podium garden is now changed to plain garden.
2. The space where they had sales office they are constructing 3 story parking + club house.
3. Cleaning and final touch up  work was in progress. So hopefully we will get keys by Dec 15 and possession in Jan 2015.

Thanks,
Ram.

IMG_20141108_130746.jpg

jimish thakkar

unread,
Nov 15, 2014, 6:13:48 AM11/15/14
to Ramchandra Narkhede, Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare
Hi Guys,

I visited Casa Imperia today, and here is the update:

15th Dec is when they are planning to give the Keys for Furniture
End of January is the Possession of the flat as per them so far.

Well Interesting thing, Kids Garden will be ready at the time of Possession, but Club House and other amenities like Swimming Pool, they will only start Constructing it 3-4 months after possession. According to them Internal Road is part of the Amenities :)

Just a comment, so far we have seen for 1 year commitment from their side, it takes them 3 years, not sure by when we will actually get the amenities to use...but well thats what we have. 

Thanks,
Jimish Thakkar

Jayesh Bhave

unread,
Dec 4, 2014, 12:39:25 AM12/4/14
to jimish thakkar, Ramchandra Narkhede, Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare
Here is an update.

I called Pravin, Casa Imperia.  He told me that they are starting keys handover process for furniture work.  There is balance payment to be made.  The OC is expected by end Jan.  He told me that two people have started furniture.  Please let me know if anyone in this group has taken keys.

I am planning to start few things from this month.

thanks
Jayesh   


Aarti Mohan

unread,
Dec 4, 2014, 1:34:13 AM12/4/14
to Jayesh Bhave, jimish thakkar, Ramchandra Narkhede, Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare
I haven't received anything as yet.

Sent from my BlackBerry 10 smartphone.
From: Jayesh Bhave
Sent: Thursday, 4 December 2014 09:39
To: jimish thakkar
Cc: Ramchandra Narkhede; Jatin; casai...@googlegroups.com; joshid...@gmail.com; Abhijeet Bedare
Subject: Re: Agreement

Jayesh Bhave

unread,
Dec 4, 2014, 1:35:35 AM12/4/14
to Aarti Mohan, jimish thakkar, Ramchandra Narkhede, Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare
Guess it is on need basis.  Those who approach may get this option. 

Jatin

unread,
Dec 4, 2014, 1:54:47 AM12/4/14
to Jayesh Bhave, Aarti Mohan, jimish thakkar, Ramchandra Narkhede, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare
This is really good news. Will try to meet Dhananjay in this weekend. 

I am thinking to make furniture. Any one has contact that can help to make/buy in good rates.

Sent from my iPhone

gaurav khadse

unread,
Dec 4, 2014, 3:19:40 AM12/4/14
to Jatin, Jayesh Bhave, Aarti Mohan, jimish thakkar, Ramchandra Narkhede, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare
I got the keys. For everyone the process will start by Dec 15. You will need to make balance payment and pay additional amount for maintenance for next 12 month at the rate Rs.2 per sq feet (yes you read it right it is Rs.2). Pravin's justification is that unused amount will be transferred to Society once it is formed.


@ Jatin - If you are looking for finishing and hassle free experience go for Buy option. If you are looking for consistency in everything and have time and energy to invest go for Make option. Anyways you will need to get your modular kitchen made only.

Regards,
Gaurav Khadse

Manohar Rao

unread,
Dec 10, 2014, 7:40:01 AM12/10/14
to gaurav khadse, Jatin, Jayesh Bhave, Aarti Mohan, jimish thakkar, Ramchandra Narkhede, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare
I have also asked Dhananjay to ready my flat by 15 Dec. We have to pay balance outstanding amount before they can handover the keys. I also checked my flat and its almost ready some finishing work is pending which they said will be completed by 15 Dec. And yes handover of the keys is for furniture work only.

Thanks
Manohar
B1-203
--
Thanks & Regards
Manohar

Jayesh Bhave

unread,
Dec 10, 2014, 8:25:19 AM12/10/14
to Manohar Rao, joshid...@gmail.com, Jatin, Ramchandra Narkhede, gaurav khadse, jimish thakkar, Aarti Mohan, Abhijeet Bedare, casai...@googlegroups.com

I have done the same thing
Jayesh
B1-605

Jatin

unread,
Dec 28, 2014, 2:23:58 AM12/28/14
to Jayesh Bhave, Manohar Rao, joshid...@gmail.com, Ramchandra Narkhede, gaurav khadse, jimishthakkar, Aarti Mohan, Abhijeet Bedare, casai...@googlegroups.com
Hello

Any one got the keys? 
Still water and fittings are not available in apt. 

Sent from my iPhone

Ramchandra Narkhede

unread,
Dec 28, 2014, 2:43:37 AM12/28/14
to Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare, jimishthakkar, gaurav khadse, Manohar Rao, Jayesh Bhave, Aarti Mohan

I asked for keys last week. I'll get it tomorrow. They take 8 days to handover keys for furniture even after making final payment. Pravin says we need 8 days for cleaning the flat.

Yes electricity, water not available. Even water taps fitting is not done. Probably they will do it at the time of actual possession. Dhananjay told me I can move in to apartment on Feb 1.

gaura...@yahoo.com

unread,
Dec 28, 2014, 3:00:17 AM12/28/14
to Ramchandra Narkhede, Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare, jimishthakkar, gaurav khadse, Manohar Rao, Jayesh Bhave, Aarti Mohan
Any idea if we can get possession letter before 31- Mar?

On the move

Jatin

unread,
Dec 28, 2014, 3:09:21 AM12/28/14
to gaura...@yahoo.com, Ramchandra Narkhede, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare, jimishthakkar, gaurav khadse, Manohar Rao, Jayesh Bhave, AartiMohan
I talked earlier for letter, Dhananjay told we will be getting partial (not exactly partial but he used some word, I forget that), he says that is good for income tax purpose.


Sent from my iPhone

Ramchandra Narkhede

unread,
Dec 28, 2014, 4:04:48 AM12/28/14
to Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare, jimishthakkar, Manohar Rao, gaurav khadse, AartiMohan, Jayesh Bhave, gaura...@yahoo.com

I took provisional possession letter and submitted to office for income tax. You can take provisional posession letter by paying your balance amount and maintenance payment for 1yr @ per sq.ft.

Ramchandra Narkhede

unread,
Dec 28, 2014, 4:07:42 AM12/28/14
to Jatin, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare, jimishthakkar, Manohar Rao, gaurav khadse, AartiMohan, Jayesh Bhave, gaura...@yahoo.com
maintenance payment at 2 rs / sq.ft.

Manohar Rao

unread,
Dec 29, 2014, 1:18:13 AM12/29/14
to Jatin, Jayesh Bhave, joshid...@gmail.com, Ramchandra Narkhede, gaurav khadse, jimishthakkar, Aarti Mohan, Abhijeet Bedare, casai...@googlegroups.com
I got keys. They said they will start water after 30 Dec. I am waiting for water to start my furniture work.

Ramchandra Narkhede

unread,
Dec 31, 2014, 5:57:10 AM12/31/14
to Manohar Rao, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare, jimishthakkar, Jatin, gaurav khadse, Jayesh Bhave, Aarti Mohan

Hi Manohar,

I'm taking keys from Pravin. He says water will be started end of Jan(at the time when will move in).

Ram.

Ramchandra Narkhede

unread,
Dec 31, 2014, 6:01:59 AM12/31/14
to Manohar Rao, Abhijeet Bedare, Jatin, jimishthakkar, gaurav khadse, casai...@googlegroups.com, Jayesh Bhave, Aarti Mohan, joshid...@gmail.com

Hi, can you add syog...@gmail.com B1, 1101.

Manohar Rao

unread,
Dec 31, 2014, 6:03:26 AM12/31/14
to Ramchandra Narkhede, Abhijeet Bedare, Jatin, jimishthakkar, gaurav khadse, casai...@googlegroups.com, Jayesh Bhave, Aarti Mohan, joshid...@gmail.com
Yes I talked to builder as well and  he also confirmed that water connection wont start before 30th Jan.

Ramchandra Narkhede

unread,
Dec 31, 2014, 7:18:28 AM12/31/14
to Manohar Rao, casai...@googlegroups.com, joshid...@gmail.com, Abhijeet Bedare, jimishthakkar, Jatin, gaurav khadse, Jayesh Bhave, Aarti Mohan

Please add prasad.g...@gmail.com B1 603.

syogesh22

unread,
Jan 4, 2015, 12:33:43 AM1/4/15
to casai...@googlegroups.com
Hi all,

As we have been noticing builder is not adhering to his oral commitments, can we All ask him to give us in writing (provisinal oc or anything otherwise ) expected date of formal OC. As per them it will take another 6 months for PCMC water and related stuff,which can actualy take a year or more. Without OC it is illegal to occupy flats especially when we are paying entire flat cost ,getting OC is our right.

Besides we can hold meetings periodically with builder for pending issues to expedite OC and other things committed in agreement ..

It isn't easy for an individual to fight against builder.. We have to handle it as residents' body.

Please share your thoughts/ issues/ strategies around it.

Thanks,
Yogesh

Shrinivas Kulkarni

unread,
Jan 4, 2015, 1:08:23 AM1/4/15
to syogesh22, casai...@googlegroups.com
I think its a good idea to have meeting as a group with the builder. I am ok with it.

Builder is highly unpredictable. As we have experienced the completion date has been frequently delayed. Now he wants us to take flat's possession without providing even the basic amenities. This is ridiculous. As being told drainage, water, gas etc are going to take time. It will be a big loss for us if take possession in this condition even for furniture as the flat cannot be used for anything. Even the guys making furniture need to stay there for few days which is not possible in the given condition.

We are the customers we are paying him for flat and not getting it for free. So he cannot force us to take the possession as and when he feels it. I am of the opinion that I would take the possession only when the flat is completely ready. Otherwise its no point to take the possession. Its like buying a car which cannot be driven because it has no wheels no steering and sorts.



Regards
Shrinivas.

Jatin

unread,
Jan 4, 2015, 3:26:33 AM1/4/15
to Shrinivas Kulkarni, syogesh22, casai...@googlegroups.com
I also agree.


Sent from my iPhone

prasad gandhewar

unread,
Jan 4, 2015, 8:46:36 AM1/4/15
to syogesh22, casai...@googlegroups.com

I am in for this.

Thanks
Prasad Gandhewar

Aarti Mohan

unread,
Jan 4, 2015, 10:35:36 AM1/4/15
to prasad gandhewar, syogesh22, casai...@googlegroups.com
I am in for this too

Sent from my BlackBerry 10 smartphone.
From: prasad gandhewar
Sent: Sunday, 4 January 2015 18:30
To: syogesh22
Subject: Re: OC

Jayesh Bhave

unread,
Jan 5, 2015, 4:24:56 PM1/5/15
to Aarti Mohan, prasad gandhewar, syogesh22, casai...@googlegroups.com
Now almost all builders are missing their commitments.  Agree that we must jointly take it.  But some of us do not belong to Pune, so may not be possible.  But suggest to keep communicating with builders by mails even though they are not responding.  This may help us in building a case.  We even mark copy to all the group, so that they understand that we are fighting together and not individually.

thanks, Jayesh Bhave   

Jatin

unread,
Jan 6, 2015, 1:32:12 AM1/6/15
to Jayesh Bhave, Aarti Mohan, prasad gandhewar, syogesh22, casai...@googlegroups.com
I think let's we decide one date and time and all of us meet; note down the issues and possible monetary loss because of the issue and we can plan how to handle this. As our group is also small we can bring as many more we can do and probably more we group that can help us.
The big issue I can see on amenities side. Still final layout is not final forget about the timeline. 
As most of paying rent somewhere they definitely want move asap. I am one of them. 
Even I can see issues like OC, amenities don't see any other better way other than pay pending money as that is negligible in compare to what is already paid and get keys. 
Jatin B2-103.

Sent from my iPhone

Ramchandra Narkhede

unread,
Jan 7, 2015, 2:12:41 AM1/7/15
to Jatin, casai...@googlegroups.com, Yogesh Shinde, prasad gandhewar, Jayesh Bhave, Aarti Mohan

Hi All,

I'll write to Dhananjay today to complete any pending work of my flat and other common areas like lobby, lift etc. I'm planning to ocuppy on Feb 1, 2015. Please share if any one is occupying near by Feb 1. I know Yogesh & Prasad and are willing to occupy on Feb 1.

Thanks,
Ramchandra Narkhede

Jatin

unread,
Jan 7, 2015, 4:35:39 AM1/7/15
to Ramchandra Narkhede, casai...@googlegroups.com, Yogesh Shinde, prasadgandhewar, Jayesh Bhave, Aarti Mohan
I got the keys for my apt.
My plan to move in from 1st Feb.

Sent from my iPhone

Yogesh Shinde

unread,
Jan 7, 2015, 11:22:25 AM1/7/15
to Jatin, Ramchandra Narkhede, casai...@googlegroups.com, prasadgandhewar, Jayesh Bhave, Aarti Mohan
Yes, amanities point is perfectly valid and need followup.

Also do we have CA or good accountant in group?.. Because we will need his/her help for audititing building expenses done by builder. We can even discuss breakup of maintenance with builders.

I had talk with praveen today,he told me:
1. Lift ,water , electricity will start from 1 Feb

2.OC will be given by Jan end i.e. at Time of occupying.

3. Water pipeline is laid out just connection to main line is to pending and eta is 2 weeks post OC I.e. around 15 Feb.

Shout if you have any contradictory info.

Thanks,
Yogesh
--
Sent from iPhone

gaurav khadse

unread,
Jan 8, 2015, 9:45:53 PM1/8/15
to casai...@googlegroups.com

---------- Forwarded message ----------
From: gaurav khadse <gkh...@gmail.com>
Date: Thu, Jan 8, 2015 at 8:43 AM
Subject: Re: OC
To: Yogesh Shinde <syog...@gmail.com>


Hi Yogesh,

I also have the same information. But issue is that they should stick to these dates.

You have raised a very good point to track expenses as builder is charging 2 per sq ft as maintenance. To sell his flats in upcoming C, D and E he will spend money carelessly to make everything look fabulous. You may notice A building is recently painted.

Also I have noticed that A building is still dependent on tankers. They still did not get pipeline connection I suppose, how come we will get it.

Other points adding to your list:
4. Piped gas connection will take anything between 4 to 6 months

5. There is only one internet provider JOISTER and builder has tie-up with him only as both owners know each other. No other cable internet is allowed.

6. There is fixed list of TV providers that builder has tie-up with. You can take only those connection. So forget about your existing connection. Also individual dish are not allowed.

7. Parking was supposed to be allotted by 15 Dec. No ETA on it.


Personally I would want the lift to be available by 24th Jan as then it gives us time to start moving stuff slowly.

We can plan to meet this weekend with the builder.

Regards,
Gaurav

Aarti Mohan

unread,
Jan 9, 2015, 2:07:47 AM1/9/15
to gaurav khadse, casai...@googlegroups.com
Hi friends,

Wish you all a very happy new year!!!

I have been seeing emails. I am in with all on this. But since I am out of country can't do much personally.

I am with all on whatever initiative you want to take up with the builder.

Thanks

Aarti

Sent from my BlackBerry 10 smartphone.
From: gaurav khadse
Sent: Friday, 9 January 2015 08:08
Subject: Fwd: OC

Shrinivas Kulkarni

unread,
Jan 9, 2015, 2:58:04 AM1/9/15
to Aarti Mohan, gaurav khadse, casai...@googlegroups.com
Hi Gaurav,
Let me know what time you plan to meet builder. I will try to be there. 

 
Regards
Shrinivas. 

Deepali Joshi

unread,
Jan 9, 2015, 5:09:10 AM1/9/15
to Shrinivas Kulkarni, Aarti Mohan, gaurav khadse, casai...@googlegroups.com
Hello All,

I am surprised to see the email saying people have to depend on tankers in A building.  This means the builder is not completing the things from his end.  When we booked the flat he had assured that would be 24 x 7 water supply. This itself shows how reliable the builder is. I think we must meet the builder collectively and raise all these questions. If possible catch hold of someone from A building so that the builder cant run away from the question. 

Thanks
Deepali

Shrinivas Kulkarni

unread,
Jan 13, 2015, 5:35:28 AM1/13/15
to Deepali Kulkarni, casai...@googlegroups.com, Aarti Mohan, gaurav khadse

Builder is charging 2 per sq foot because some he has to pay for water tanker in addition to many other things mentioned before.
Also the link below might be useful to you for various tax deductions related points:
http://m.businesstoday.in/story/tips-to-use-all-the-tax-benefits-that-are-available-on-home-loans/1/214121.html

Regards,
Shrinivas.

Ramchandra Narkhede

unread,
Jan 15, 2015, 8:21:56 AM1/15/15
to casai...@googlegroups.com
Hi All,

Me & Yogesh spoke few mins back. Dhananjay confirmed Yogesh that there are nearly 16 people who are ready to occupy their flats on Feb 1, 2015. I see there are so many things pending.

1. Tap fittings & Water supply
2. Electricity
3. Lifts
4. Door bells
5. Security etc

If we are to occupy on Feb 1, we need to start pushing the builder now and we should get proper confirmation from him. I think we should ask from some hard copy/email confirmation, verbal confirmation does not help 

We will also have to ask builder to make all arrangements on or before 31 Jan and we should personally check on 31 Jan, so that we don't get last minute surprises. 

Let's meet this Saturday around 11 PM. We all can discuss between us and the speak to Dhananjay then. Please raise your points in this mail thread so that we can highlight to Dhananjay.

Note: Please update your contact details on the sheet I created earlier, so if required we can reach each other. Here is the link.


Thanks,
Ram.

Abhijit Bote

unread,
Jan 15, 2015, 9:21:48 AM1/15/15
to casai...@googlegroups.com

Hi All,
I wanted to add some inputs from my side-
1) Currently Electricity is available for each flat. I am sure because I have done pooja/vastukshanti of my own flat on end.of November '14 and I personally stay there on that night. It just need to start from distribution unit.
2) there are three water tanks on top floor /terrace for daily use, drinking and for solar system. I have personally climb and checked it.
3) I guess tap fitting is done in flat no B-1 1101. I heard it from site engineer.

I do agree about pushing builder for early completions. And we all need to ask him to give last demand on mail along with confirm possession date and amenities readiness.

330.gif

Ramchandra Narkhede

unread,
Jan 16, 2015, 2:19:08 AM1/16/15
to Abhijit Bote, casai...@googlegroups.com
Hi All,

Dhananjay is not available this weekend. He said we can meet him on Tuesday. We will confirm the timings on Monday.


Thanks,
Ram.

gaurav khadse

unread,
Jan 16, 2015, 3:15:48 AM1/16/15
to Ramchandra Narkhede, Abhijit Bote, casai...@googlegroups.com

He knows weekday no one will show up. Any chance about Sunday if not Saturday?


Regards,
Gaurav

Ramchandra Narkhede

unread,
Jan 16, 2015, 3:27:46 AM1/16/15
to gaurav khadse, Abhijit Bote, casai...@googlegroups.com
No. He said he is going to some other site this weekend somewhere in Satara. Do you work out of Hinjewadi?

jimish thakkar

unread,
Jan 16, 2015, 3:31:10 PM1/16/15
to Ramchandra Narkhede, gaurav khadse, Abhijit Bote, casai...@googlegroups.com
Well I did visit the site today....I think C building construction is going in Full Swing, and according to me, the builder is not interested in giving the Amenities before the C building is ready...this is my take, as we know how well this builder has kept his past promises, he is saying in 6 Months all amenities will be done, I really doubt.

Weekdays, it is easy to tackle fewer audience for him, and hence Tuesday is the day for meeting.

We also need to check how safe the premises is for the Kids after 1st Feb, if he is giving possession at that time, and what measures they are going to take. We are just 2 weeks away, and I do not see any precautions taken yet.

-Jimish Thakkar

Shrinivas Kulkarni

unread,
Jan 16, 2015, 10:46:20 PM1/16/15
to jimish thakkar, casai...@googlegroups.com, Abhijit Bote, Ramchandra Narkhede, gaurav khadse

Hi,
Does anybody know anybody staying in Atlanta, the project in front of us along the main road. It is has been fully complete for some time now I guess though it started at the same time as casa. If residents there are getting water, gas etc. then we can hope to get them after some time as the builder is saying. If Atlanta residents are not getting these things and they are still getting water from tanker etc. then the whole area itself is problematic. In this case I dont think casa will get water etc even after six months , the builder is just trying to get us stay quiet. If somebody knows anybody staying around then please check and let us know. At least we will get some realistic idea.

Shrinivas.

Jatin

unread,
Jan 16, 2015, 11:41:15 PM1/16/15
to Shrinivas Kulkarni, jimish thakkar, casai...@googlegroups.com, Abhijit Bote, Ramchandra Narkhede, gaurav khadse
To me to get things done from builder is two ways.
1. Surrender the builder,take false promises and get things when they ready.
2. Seek legal help and fight against builder. Ready to bear the cost and
Future consequences but chances are there you get your things on your condition.

Sent from my iPhone

Shrinivas Kulkarni

unread,
Feb 1, 2015, 10:38:24 PM2/1/15
to Jatin, casai...@googlegroups.com, Abhijit Bote, Ramchandra Narkhede, jimish thakkar, gaurav khadse

Anybody moved in?
Can you share your experience(s)?

Regards,
Shrinivas.

jayesh mahajan

unread,
Feb 17, 2015, 6:48:24 AM2/17/15
to Shrinivas Kulkarni, Jatin, casai...@googlegroups.com, Abhijit Bote, Ramchandra Narkhede, jimish thakkar, gaurav khadse

Hello,

Can anybody share update on possession status please.

Thanks,
Jayesh


Sent from RediffmailNG on Android
Get your own FREE website, FREE domain & FREE mobile app with Company email.  
Know More >

jayesh mahajan

unread,
Feb 17, 2015, 6:48:32 AM2/17/15
to Shrinivas Kulkarni, Jatin, casai...@googlegroups.com, Abhijit Bote, Ramchandra Narkhede, jimish thakkar, gaurav khadse

Hello,

Can anybody share update on possession status please.

Thanks,
Jayesh


Sent from RediffmailNG on Android

From: "Shrinivas Kulkarni"shrinivas...@gmail.com
Sent:Mon, 02 Feb 2015 09:08:15 +0530
To: Jatin jati...@gmail.com
Cc: casai...@googlegroups.com,"Abhijit Bote"botea...@gmail.com,"Ramchandra Narkhede"ramchandr...@gmail.com,"jimish thakkar"jimis...@yahoo.co.in,"gaurav khadse"gkh...@gmail.com
Subject: Re: OC

Jatin

unread,
Feb 17, 2015, 7:35:07 AM2/17/15
to jayesh mahajan, Shrinivas Kulkarni, <casaimperia@googlegroups.com>, AbhijitBote, Ramchandra Narkhede, jimish thakkar, gaurav khadse
5-6 family are staying there.
Drinking water is available for only 15
Minutes a day.
No TV as still management has not finalize dish operators for us.

This all I heard from residents, not experienced by my self.

Jatin
B-103
Sent from my iPhone
Reply all
Reply to author
Forward