Hello Everybody,
First of all wish you very happy New Year!!!

Here are some updates of my recent visit.
1) Brick work is almost completed of all 12 floories (only noticeable work)
2) Flooring/tiling has not yet started.
3)Half work done of Plastering/plumbing till 7th Floor of both buildings.
4) Work around the building is very slow and they pretending that because of this overall work progress is affecting.
5) Very important is they again postponed possession date till June-July 2014 (?)

I think we have push them hard and demand to give possession asap. Request everyone to visit or contact them and pressurised to boost up work.

//Abhijit Bote
B1-606

Manish Choudhary

unread,
Jan 15, 2014, 5:25:30 AM1/15/14
to Abhijit Bote, casai...@googlegroups.com

Hi All,

 

Today I visited the Casa Imperia and want to add some more few updates over to below mail-

  1. Connecting road to Hinjwadi from Casa to Indian Oil Petrol Pump work has started.
  2. They will start the possession of Phase I (A1, A2 & A3) from 26th Jan 2014
  3. Also Bhumi Poojan of C Building will be on 26th Jan 2014
  4. According to the current position of the Phase II (B1 & B2) I don’t think they will give the possession in June/July 2014, I will be extend till Dec-2014 or could be possible 26th Jan 2015.

 

Yes Abhijit you are right we should have to push the builder to get it completed ASAP, because current position of the work is too slow.

 

Regards

Manish Choudhary

B1 – 404

9049008277

--
Manish

Ramchandra Narkhede

unread,
Mar 7, 2014, 6:15:19 AM3/7/14
to Manish Choudhary, casai...@googlegroups.com

Guys, I got call for demand(97%) today. In reality work done is not even 80%.

When i asked when is the posession i was told it will be july-aug. So we will not get before Dec 2014 for sure. Evertime its an extension of 1 month. We cant wait like. When are we going to meet builder(only builder no incharge or someone)? Lets plan and meet them else this will continue to be delayed. I suggest day after tomorrow. Please suggest.

Thanks,
Ram.

Manohar Rao

unread,
Mar 7, 2014, 6:43:23 AM3/7/14
to Ramchandra Narkhede, Manish Choudhary, casai...@googlegroups.com
I also got the demand letter. But I have not yet paid to them. Yes lets decide to meet together and visit office.
--
Thanks & Regards
Manohar

Manish Choudhary

unread,
Mar 7, 2014, 6:52:29 AM3/7/14
to Manohar Rao, Ramchandra Narkhede, casai...@googlegroups.com
Even one more interesting things is that one of my friend who booked the flat in B2 wing got the demand letter of 90% construction only its around 1.80 lac's.

That means all the purchasers are not synchronized. Seriously we should get together and ask them about it.

I also visited the site and even plaster work is in progress, flooring is not done yet still they are saying that 97% work has completed, I don't know on what basis they the clamming that 97% work has done.

Please let me know the date and time if anyone is planning to meet over there.

Thanks
Manish Choudhary   
--
Manish

jimish thakkar

unread,
Mar 7, 2014, 11:02:52 AM3/7/14
to Manish Choudhary, Manohar Rao, Ramchandra Narkhede, casai...@googlegroups.com
So I see we are meeting on Sunday, what time is good with all.....

-Jimish Thakkar

Abhijit Bote

unread,
Mar 7, 2014, 11:37:50 AM3/7/14
to casai...@googlegroups.com

Ok for me. Lets meet at 11 am. on Sunday if its convenient to all who are coming. And we will NOT intimate them. Will go directly.

gaurav khadse

unread,
Mar 7, 2014, 9:00:37 PM3/7/14
to Abhijit Bote, casai...@googlegroups.com
11 is good with me as well... We will be meeting Dhanajay? or someone else?

Jayesh Bhave

unread,
Mar 7, 2014, 9:50:13 PM3/7/14
to Ramchandra Narkhede, manish.ch...@gmail.com, casai...@googlegroups.com

Yes, unless we raise voice, they will be delays. Unfortunately some of us are not in pune. But can make several calls to keep the pressure

very_...@yahoo.com

unread,
Mar 7, 2014, 10:13:46 PM3/7/14
to gaurav khadse, Abhijit Bote, casai...@googlegroups.com
Dear All,

I have received a demand letter‎ too and have written to  Dhananjay on the completion of the Project.

Being in Dubai can't do much except for worrk jointly with ‎all.

Regards

Aarti
From: gaurav khadse
Sent: Saturday, 8 March 2014 06:01
To: Abhijit Bote
Subject: Re: Re: Casa Imperia Updates as on 10Jan2014

Deepali Joshi

unread,
Mar 8, 2014, 2:34:03 AM3/8/14
to very_...@yahoo.com, Abhijit Bote, casai...@googlegroups.com, gaurav khadse, Shrinivas Kulkarni, r r kulkarni

11 is good for us too

gaura...@yahoo.com

unread,
Mar 8, 2014, 4:16:32 AM3/8/14
to Deepali Joshi, very_...@yahoo.com, Abhijit Bote, casai...@googlegroups.com, gaurav khadse, Shrinivas Kulkarni, r r kulkarni
11 is ok for me too. Just one thing, if we r planning to meet mr dhananjay, some one should check his avalability for tomorrow without telling our plan. 

Sent from my iPhone

mantra...@gmail.com

unread,
Mar 8, 2014, 10:48:14 AM3/8/14
to gaura...@yahoo.com, Deepali Joshi, very_...@yahoo.com, Abhijit Bote, casai...@googlegroups.com, gaurav khadse, Shrinivas Kulkarni, r r kulkarni
Hi I am Mrs Mantrawadi
From  last one month builder was demanding for amount upto 90% on telephone only .in last week they send said demand note by email.Same day We went there for B1 block all slabs completed ext plaster almost completed Flooring just started.But I think  for possession it wl be in Dec only. There is.lot of miscommunication on site .In our flat no.B1 204 door frame of master room was wrongly fixed so that attached toilet became common .We pointed out this point to site Engineer then he agreed their mistake &now they are rectifying that.So I request u all to see ur flat according to plan
Then we gave cheque for. 90%
& day.before yesterday accountant lady gave me ring for further payment.of 97% before realisation of first cheque. I don't.understand how they r giving   two demand lr within one week .They are saying this demand letter is as per amgt payment slab 97% .Pl tell me whether we shall pay  upto 97%

Regards
Mrs Mantrawadi

Deepali Joshi

unread,
Mar 8, 2014, 11:20:55 AM3/8/14
to mantra...@gmail.com, very_...@yahoo.com, Shrinivas Kulkarni, casai...@googlegroups.com, Abhijit Bote, gaurav khadse, r r kulkarni, gaura...@yahoo.com

Are we meeting at 11 tomorrow

gaurav khadse

unread,
Mar 8, 2014, 12:25:44 PM3/8/14
to Deepali Joshi, Pradnya Mantrawadi, very_...@yahoo.com, Shrinivas Kulkarni, casai...@googlegroups.com, Abhijit Bote, r r kulkarni, gaura...@yahoo.com
See you at 11 tomorrow.

Abhijit Bote

unread,
Mar 8, 2014, 11:53:34 PM3/8/14
to gaurav khadse, mantra...@gmail.com, very_...@yahoo.com, casai...@googlegroups.com, Shrinivas Kulkarni, Deepali Joshi, gaura...@yahoo.com, r r kulkarni

Lets use introductory keyword as "B1B2" to recognise group members. :-)

Jayesh Bhave

unread,
Mar 9, 2014, 12:00:54 AM3/9/14
to gaurav khadse, mantra...@gmail.com, very_...@yahoo.com, Shrinivas Kulkarni, Deepali Joshi, r r kulkarni, Abhijit Bote, casai...@googlegroups.com, gaura...@yahoo.com

Can we write formal letter and all can start sensing?? I am too planning visit   by last week of March

On 08-Mar-2014 10:56 pm, "gaurav khadse" <gkh...@gmail.com> wrote:

gaura...@yahoo.com

unread,
Mar 9, 2014, 12:41:10 PM3/9/14
to Jayesh Bhave, gaurav khadse, mantra...@gmail.com, very_...@yahoo.com, Shrinivas Kulkarni, Deepali Joshi, r r kulkarni, Abhijit Bote, casai...@googlegroups.com
I couldn't go to casa today. Did anyone go there, any feedback/ response frm builder. Pls share.

Sent from my iPhone

jimish thakkar

unread,
Mar 10, 2014, 12:42:38 PM3/10/14
to gaura...@yahoo.com, Jayesh Bhave, gaurav khadse, mantra...@gmail.com, very_...@yahoo.com, Shrinivas Kulkarni, Deepali Joshi, r r kulkarni, Abhijit Bote, casai...@googlegroups.com
We did visit last Sunday as planned, only 4 of us were there....as per agreement copy they claim 97% of the work is done, slabs and brick work.

Secondly, I had a personal point, not sure of all, but the last demand letter I got was 6 months back which covered 90%, and now I know that most of us are paying the 90% demand letter, and now the we are getting the 97% demand letter.
 
Dhananjay was not there, but did have a telephonic conversation with him and we can meet him once he lets us know his availability.

Will let all know once I get a call from Dhananjay.

-Jimish Thakkar

gaurav khadse

unread,
Mar 14, 2014, 9:42:02 PM3/14/14
to casai...@googlegroups.com
Dear All - I have added the extra names going in the email. Please check the following link and let me know if email ID of someone you know is missing.
https://groups.google.com/forum/#!managemembers/casaimperia/members/active

Also a request, if anyone has visited the construction site post Jimish's visit, please update us on the overall progress and plaster work.

Hi Jimish,

Did you hear from Dhananjay? If not, should we schedule a meeting for 22nd March with him, if everyone here agrees on the date and day. It should not happen that only we 4 turn up again.

Regards,
Gaurav Khadse

Manish Choudhary

unread,
Mar 14, 2014, 11:03:04 PM3/14/14
to gaurav khadse, casai...@googlegroups.com
Hi Gaurav,

Please add the below email address as well in the Casa Imperia Group,

Lalit Joshi:

Can yo please share the FLAT details in casa imperia of above these your friends.

Thanks
Manish Choudhary
--
Manish

Ramchandra Narkhede

unread,
Mar 15, 2014, 1:32:00 AM3/15/14
to Manish Choudhary, gaurav khadse, casai...@googlegroups.com
Hi Guarva,

Please add kish...@gmail.com ( B1, 501 ).

Thanks,
Ram.

jimish thakkar

unread,
Mar 15, 2014, 2:15:27 AM3/15/14
to Ramchandra Narkhede, Manish Choudhary, gaurav khadse, casai...@googlegroups.com
No call from Dhananjay yet....

Let me know who all are in for next Saturday 22nd March for visit...Depending on the replies I can connect with Dhananjay and try to get his availability.

-Jimish Thakkar

Ramchandra Narkhede

unread,
Mar 15, 2014, 3:55:39 AM3/15/14
to jimish thakkar, Manish Choudhary, gaurav khadse, casai...@googlegroups.com
Dhananjay is in office. I got call from Accounts and I confirmed if he is in office. @Jimesh, can you check with him?

very_...@yahoo.com

unread,
Mar 15, 2014, 4:26:33 AM3/15/14
to Ramchandra Narkhede, jimish thakkar, Manish Choudhary, gaurav khadse, casai...@googlegroups.com
Hi everyone.

I am out. Of country.

Thanks

Aarti

Sent from my BlackBerry 10 smartphone.
From: Ramchandra Narkhede
Sent: Saturday, 15 March 2014 13:26
To: jimish thakkar
Cc: Manish Choudhary; gaurav khadse; casai...@googlegroups.com
Subject: Re: Casa Imperia Updates as on 10Jan2014

Ramchandra Narkhede

unread,
Mar 15, 2014, 4:29:48 AM3/15/14
to very_...@yahoo.com, Manish Choudhary, casai...@googlegroups.com, gaurav khadse, jimish thakkar

Everyone, please stop payment processing till the time we speak to them.

Manohar Rao

unread,
Mar 17, 2014, 4:36:03 AM3/17/14
to Ramchandra Narkhede, very_...@yahoo.com, Manish Choudhary, casai...@googlegroups.com, gaurav khadse, jimish thakkar
What time on 22nd we are planning to go to Casa?

gaura...@yahoo.com

unread,
Mar 21, 2014, 2:30:27 PM3/21/14
to Ramchandra Narkhede, very_...@yahoo.com, Manish Choudhary, casai...@googlegroups.com, gaurav khadse, jimish thakkar
I can visit casa on 22 mar 10 am. Who else can?

Sent from my iPhone

Jayesh Bhave

unread,
Mar 22, 2014, 10:24:46 AM3/22/14
to gaura...@yahoo.com, Ramchandra Narkhede, very_...@yahoo.com, Manish Choudhary, casai...@googlegroups.com, gaurav khadse, jimish thakkar
Got a call from Builder, they have raised one more demand.  Last month I paid one installment.  This is kind of surprise to have demand in just a month.  He informed that the possession is planned in July.


Ramchandra Narkhede

unread,
Mar 22, 2014, 10:30:24 AM3/22/14
to Jayesh Bhave, gaura...@yahoo.com, very_...@yahoo.com, Manish Choudhary, casai...@googlegroups.com, gaurav khadse, jimish thakkar
Hi All,

Me & Kishor(B1-501) went to Casa today. I saw flooring work done for few flats mostly 101,201,301..... skipping others. So there flats looks 70% complete. But nothing done for other flats.

I got call for 97% payment from Anupama. She said they are will take money up to 97% and remaining 3% while possession. Not sure now whether to pay or now. What you all say?


Thanks,
Ram. 

very_...@yahoo.com

unread,
Mar 22, 2014, 10:54:29 AM3/22/14
to Jayesh Bhave, gaura...@yahoo.com, Ramchandra Narkhede, Manish Choudhary, casai...@googlegroups.com, gaurav khadse, jimish thakkar, raman
I have also received emails from dhananjay for my apt B1 - 601.

I have it on mortgage and hence have asked him to respond on email on the progress and status of completion. To which he responded to call him. I have further written to him to give it in writing‎.

Am awaiting a response.

Regards

Aarti

Sent from my BlackBerry 10 smartphone.
From: Jayesh Bhave
Sent: Saturday, 22 March 2014 18:24
Cc: Ramchandra Narkhede; very_...@yahoo.com; Manish Choudhary; casai...@googlegroups.com; gaurav khadse; jimish thakkar

gaurav khadse

unread,
Mar 23, 2014, 12:33:46 AM3/23/14
to Aarti Khurana, Jayesh Bhave, gaura...@yahoo.com, Ramchandra Narkhede, Manish Choudhary, casai...@googlegroups.com, jimish thakkar, raman
Hi Jayesh, Ram, Kishore,

Builder will ask for 97% as it is in the agreement. Our primary focus (for atleast the people who are currently staying on rent) should be to ensure possession date does not get further postponed. Some of us has followed possession of their A1,2,3 units closely and we know builder can easily postpone July date by citing number of reasons. Hence we wanted to meet the builder and understand his plans, then we can interject if we see any delay during completion work.


@Jayesh - One month back the amount you paid must be for 90%. Now they are asking for 97% as brickwork is complete. They could have asked this amount last time itself, but I believe somehow they missed.

@Ram and Kishore - You have to pay as this is the agreement you signed. There is a payment schedule in there, that will explain why they are asking for 97% (i.e. when brickwork is complete for the said unit/flat)

Regards,
Gaurav Khadse
779690034


On Sat, Mar 22, 2014 at 8:24 PM, <very_...@yahoo.com> wrote:
I have also received emails from dhananjay for my apt B1 - 601.

I have it on mortgage and hence have asked him to respond on email on the progress and status of completion. To which he responded to call him. I have further written to him to give it in writing.

Jayesh Bhave

unread,
Mar 23, 2014, 1:36:58 AM3/23/14
to Ramchandra Narkhede, manish.ch...@gmail.com, very_...@yahoo.com, casai...@googlegroups.com, gaurav khadse, gaura...@yahoo.com, jimish thakkar

Thanks Gaurav.
I think, we shall send multiple mail asking for possession date along with OC.  Even though some of us may not on rent, but everyone needs to push.

Jayesh Bhave

unread,
Aug 25, 2014, 2:24:51 AM8/25/14
to Ramchandra Narkhede, Manish Choudhary, Aarti Khurana, casai...@googlegroups.com, gaurav khadse, gaura...@yahoo.com, jimish thakkar
Dear All,

Yesterday, I got latest information about further delay on possession of our flats.  It is now November'14 (again verbal confirmation).  Last month, when I visited, they told me that the it would be in September.  Builder is taking us for granted and adding up delays.  From the original schedule, it is now delayed by almost one year.  We all shall take this matter very seriously and keep banging on builder for speeding up the completion.  We all are loosing money in paying in interest.  I think we must take to Consumer Court, what all you think about it?

Jayesh Bhave

Abhijit Bote

unread,
Aug 25, 2014, 2:35:34 AM8/25/14
to Jayesh Bhave, Manish Choudhary, casai...@googlegroups.com, Ramchandra Narkhede, gaura...@yahoo.com, gaurav khadse, Aarti Khurana, jimish thakkar

I agree with Jayesh. Even I visited several times since last month and hear same updates from them as Jayesh. We really need to push. We all need set plan of action and work accordingly. But for raising a case we need to have evidence and they never agreed anything about it in written. I think first we will start sending mail and asking Upadates of possession and progress.
Please suggest if anything new.

Ramchandra Narkhede

unread,
Aug 25, 2014, 3:18:08 AM8/25/14
to Abhijit Bote, Manish Choudhary, Jayesh Bhave, Aarti Khurana, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, jimish thakkar

Lets ask for provisional posession letter. We anyway need it for income tax proof submission. Based on that we can push builder. What you say?

Manohar Rao

unread,
Aug 25, 2014, 4:20:24 AM8/25/14
to Ramchandra Narkhede, Abhijit Bote, Manish Choudhary, Jayesh Bhave, Aarti Khurana, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, jimish thakkar
Guys, consumer court is good option provided there is anyone who's agreement shows the data of possession. As per my agreement its mentioned that builder has to give the possession within 48 months of registration date. I did the registration in Jan 2013. If you guys can check your copy and find out if there is anyone whose date is already past then  he can claim the compensation for the same. For rest i think consumer court is not the an option. The only way is to bang his door. I too visited them on this Sunday and to me they said September end is when we can give you possession.

Thanks
Manohar

Jayesh Bhave

unread,
Aug 25, 2014, 7:13:10 AM8/25/14
to Manohar Rao, Ramchandra Narkhede, Abhijit Bote, Manish Choudhary, Aarti Khurana, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, jimish thakkar
I called the builder today morning, Manish or Manoj indicated November.  Looking at the clause in our agreements about 48 months and compensation if present, then we can approach consumer forum.  

But we all shall send repetitive communication indicating the time that Builder tells on every occasion as a record.  These hopefully will be useful in order to build a case.

Aarti Mohan

unread,
Sep 10, 2014, 3:07:29 AM9/10/14
to Jayesh Bhave, Manohar Rao, Ramchandra Narkhede, Abhijit Bote, Manish Choudhary, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, jimish thakkar, Raman Khurana, Raman Chhina
Dear Jayesh,

I have a 24 months clause which completes on 11th  September 2014.


Regards
Aarti

Jayesh Bhave

unread,
Sep 10, 2014, 3:50:30 AM9/10/14
to Aarti Mohan, Manohar Rao, Ramchandra Narkhede, Abhijit Bote, Manish Choudhary, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, jimish thakkar, Raman Khurana, Raman Chhina
I am yet to check mine.  However, I went to site last Sunday.  The revised schedule for possession is December (I hope year remains 2014!!).  I made lot of noise since builder continues to extend months and that to when we approach.  I do not know if other got similar answers.  We all need to hit and pressurize for completion.

regards,
Jayesh

Ramchandra Narkhede

unread,
Sep 10, 2014, 5:08:45 AM9/10/14
to Jayesh Bhave, Raman Khurana, Raman Chhina, gaurav khadse, jimish thakkar, Manish Choudhary, Aarti Mohan, Manohar Rao, casai...@googlegroups.com, Abhijit Bote, gaura...@yahoo.com

I was told by Praveen that we can start Furniture work aorund 10-15 oct if we want. And in first week of november will get posession.

Jayesh Bhave

unread,
Sep 11, 2014, 6:04:40 AM9/11/14
to Ramchandra Narkhede, Raman Khurana, Raman Chhina, gaurav khadse, jimish thakkar, Manish Choudhary, Aarti Mohan, Manohar Rao, casai...@googlegroups.com, Abhijit Bote, gaura...@yahoo.com
Yes, I was told Nov possession when I called 15 days back.  Getting OC is important. 

gaurav khadse

unread,
Sep 12, 2014, 12:06:17 AM9/12/14
to Jayesh Bhave, Ramchandra Narkhede, Raman Khurana, Raman Chhina, jimish thakkar, Manish Choudhary, Aarti Mohan, Manohar Rao, casai...@googlegroups.com, Abhijit Bote, gaura...@yahoo.com
I went to site couple of weeks back to take measurements for furniture. I found in the Master bathroom, that the only light point is in bathing area. You cannot take bath without getting electrocuted. Attached is the pic.

Please visit your flat to check all these small things.

@Arthi - I believe you can claim compensation from builder now. Please check your agreement and Maharashtra agreement law for how much.

Regards,
Gaurav Khadse
B1 - 1006

2014-08-31 15.59.33.jpg

Jatin

unread,
Oct 7, 2014, 3:35:28 AM10/7/14
to gaurav khadse, Jayesh Bhave, Ramchandra Narkhede, Raman Khurana, Raman Chhina, jimish thakkar, Manish Choudhary, Aarti Mohan, Manohar Rao, casai...@googlegroups.com, Abhijit Bote, gaura...@yahoo.com
Hello

Today I got new dates as below.
Getting keys for interior work on Dec 15 2014.
Possession probably on end of Jan 2015.


Sent from my iPhone
<2014-08-31 15.59.33.jpg>

Jayesh Bhave

unread,
Oct 7, 2014, 4:29:15 AM10/7/14
to Jatin, gaurav khadse, Ramchandra Narkhede, Raman Khurana, Raman Chhina, jimish thakkar, Manish Choudhary, Aarti Mohan, Manohar Rao, casai...@googlegroups.com, Abhijit Bote, gaura...@yahoo.com
They are testing our patience 

Jayesh Bhave

unread,
Oct 8, 2014, 3:50:29 AM10/8/14
to Dhananjay Jain, Ramchandra Narkhede, Abhijit Bote, Manish Choudhary, Aarti Khurana, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, jimish thakkar, Manohar Rao
Dear Mr. Dhananjay Jain,

Last more than 6 months, whenever anyone of us is visiting site or enquiring, we could not get confirmation on possession. On every occasion, commitment is pushed by one month.  At the time of booking, you told us the project completion by Diwali 2013.  But the project has been delayed substantially and may be pushed well beyond Diwali 2014.  There is no communication from your side at all.  We have put up good amount of money and obviously wanting possession at earliest.  It is frustrating for us to follow up every time and get a disappointing reply.

You have been in this  business and government delays must be accounted in the plan.  This is besides the slow construction.  Please clarify the situation and give a firm commitment for possession. This will make our lives easy.

Anticipating your response
Thanks      

jimish thakkar

unread,
Oct 10, 2014, 9:02:20 AM10/10/14
to Jayesh Bhave, Dhananjay Jain, Ramchandra Narkhede, Abhijit Bote, Manish Choudhary, Aarti Khurana, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, Manohar Rao
Hello Dhananjay,

I would request if you can please reply to Jayesh's email.

Thanks,
Jimish Thakkar

Ramchandra Narkhede

unread,
Oct 10, 2014, 9:12:29 AM10/10/14
to jimish thakkar, Jayesh Bhave, Dhananjay Jain, Abhijit Bote, Manish Choudhary, Aarti Khurana, gaurav khadse, gaura...@yahoo.com, casai...@googlegroups.com, Manohar Rao
Dhananjay, you were to call me. ( I got this update from Pravin ). Expecting your call tomorrow if not today.
Reply all
Reply to author
Forward
0 new messages