Direct Air capture (DAC) deployment: A review of the industrial deployment

33 views
Skip to first unread message

Geoengineering News

unread,
Nov 12, 2023, 6:16:07 PM11/12/23
to CarbonDiox...@googlegroups.com
This item and others will be in the weekly “Carbon Removal Updates Substack” newsletter: https://carbonremovalupdates.substack.com/
-----------------------------------------------------------------

https://www.sciencedirect.com/science/article/pii/S0009250923009727

Authors
Filippo Bisotti, Karl Anders Hoff, Anette Mathisen, Jon Hovland


06 November 2023

Highlights
•Several factors may brake DAC deployment on an industrial scale by 2030.

•TRL assessment for DAC technologies is addressed based on prior literature.

•Only small-scale pilots have been built compared to the required gigatons scale.

•Build and planned DAC facilities and their capture volumes are reviewed.

•Materials supply chain could further slowdown the industrial deployment of DAC.

Abstract
Currently, scientists and investors consider Direct Air Capture (DAC) as one of the candidates to reduce CO2 emissions. The emissions cut is pressing since 30% of the current greenhouse gas emissions must be addressed by 2030. In seven years, CO2 removal (CDR) technologies are expected to reach a Technology Readiness Level (TRL), relevant to industrial applications. The most promising technologies are at TRL-7, but the jump to TRL-11 in the new IEA scale for disruptive technologies looks unlikely because the scale-up from small pilots to industrial scale requires time and large investments. Moreover, validation on a large scale is still missing or even unplanned. This work also identifies the critical materials supply chain and the competition with the energy transition as limiting factors which could further hinder DAC deployment and reduce DAC contribution in the next years when a first significant emissions cut should be addressed.