Message on High School Intersection/Traffic Circulation Needs Assessment Now!

5 views
Skip to first unread message

TONY Redington

unread,
Dec 2, 2021, 2:53:54 PM12/2/21
to Burlington Walk/Bike Council
Good Day:

As a result of Walk Bike Council meeting discussion--and in face of unlimited planning funds from feds--sent this message later last night to key folks involved in planning for world class high school at the current site:

Good Day Ward 2 and 3 School Commissioners:

At the Walk Bike Council meeting this evening the importance of a full integrated traffic circulation plan as part of the new high school facilities location--assuming the current site--came up.  With a roundabout on the North Ave Corridor Plan (2014) at Institute Drive and consideration of walk/bike/transit connections north to the 127 area, the need for a preliminary design seemed to those attending to be of importance.  

I did surface this question with you about a year ago when things were very unsettled and it was suggested this was in the province of DPW and did forward the concern to them.  However, it is now clear a new building or two is possible and the traffic circulation, transit, roundabout (the only intersection type which Federal Highway has designated as a proven pedestrian safety countermeasure), etc., should be evaluated before and during facilities design, not afterward. 

Am not sure who should take the lead, but am just trying to get the word out!

Note the attached photo of the Montpelier Keck Circle Roundabout now 26 years old located 300 feet from Main Street Middle School--in 20 years 0 bike crashes, one non-serious (non-student) pedestrian injury and two minor car occupant injuries.  Our 20 high crash BTV intersections on VTrans list (concentrated in ONE and Downtown) average 1.5 injuries a year!

   Yours truly, 

   Tony Redington
   Walk Safety Advocate
   125 Saint Paul St  Apt 3-03

cc  Erik Brotz Brown, Chair, Walk Bike Council
     Chapin Spencer, DPW Director
     DPW Commissioner Peggy O'Neal Vivanco
     Nicole Losch, DPW
     NPA 2/3 Steering Committee
     Jen Green, BED
     Max Tracy, City Council
     Mark Barlow, City Council
     Max Schindler, Burlington CCRPC Representative
     Jack Hanson, TEUC Chair
     Jane Stromberg, City Council
     Charles Baker, CCRPC Director
     Jonathan Weber, Local Motion

--

What can you do?

Sign the Stop the Champlain Parkway Project and Choose the Champlain RIGHTway Petition: http://chng.it/tS9Ts5FjDx   SafeStreetsBurlington.com

 




10490074-BCCB-4351-83F2-57FFD53B680E.jpeg
Reply all
Reply to author
Forward
0 new messages