COSTING: Design Issues & Proposed Resolution

53 views
Skip to first unread message

Jacky Ow

unread,
Dec 28, 2012, 8:44:00 PM12/28/12
to bree...@googlegroups.com

From: Yip Mei Kee [mailto:MK...@kpkqs.com]
Sent: Friday, 28 December, 2012 5:15 PM
To: kho...@ppcity.com.my
Cc: KPK-R9; Carch_breezeway (1012_br...@c-arch.com.my); la...@ppcity.com.my; mar...@ppcity.com.my; Jacky Ow (ja...@ppcity.com.my); ye...@ppcity.com.my; kh...@tdceng.com.my; lee...@ppcity.com.my
Subject: Breezeway - COSTING: Design Issues & Proposed Resolution
Importance: High

 

 

Dear Mr Khoo,

 

Kindly find the attached cost estimation for your attention and further action.

 

Thanks & regards

 

Nasirah / Yip

 

From: yong [mailto:ccy...@mektrik.com.my]
Sent: Friday, December 28, 2012 4:27 PM
To: 'Marcus Mok'; Yip Mei Kee; 'Fam'
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; jame...@mektrik.com.my; cArch Anny; Chew; lee...@ppcity.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Dear Madam Toh/Ms Yip/ Nasirah,

 

Please find the VO cost breakdown details as following: -

 

Option 1

 

a)      To relocate 1 no lighting point type C (7 lot) = RM630

b)      Hacking & labour cost for type C (7 lot) = RM 560

c)        To relocate ceiling fan point for type A,A1 & C (17 lot) = RM2,720

d)      Hacking & labour cost for type A,A1 & C (17 lot) = RM1,360

Total = RM 5,270

 

 

Option 2

 

a)      To relocate 1 no light point for type C ( 7 lot) = RM630

b)      Hacking & labour cost for type C (7 lot) = RM 560

Total = RM 1,190

 

The cost above is current additional cost incur at site, which is based on 17 units (Total is 76 units).

We need your early confirmation for the design, as there is balance of 59 units yet to be done. Else there will be more VO cost incur as the site is in progress.

 

We trust the above is in order and please do not hesitate should you have any queries.

 

Thank you.

 

 

Regards,

 

C.C. Yong

Electrical Engineer

Perunding Mektrik Sdn. Bhd.

No.8, Jalan SS2/103,

47300 Petaling Jaya,

Selangor.

Tel: 03 7729 7759

 

 

 

 

 

 

 

 

From: Marcus Mok [mailto:mar...@ppcity.com.my]
Sent: Friday, 28 December, 2012 11:18 AM
To: 'Yip Mei Kee'; 'Fam'; ''yong''
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; 'KPK-R9'; jame...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Ms.Yip,

 

OK please revert to us ASAP once you have compiled the M&E and additional box-up’s costing.

 

Fam/Yong,

Please reply by today.

 

Thanks & Regards,

Marcus

 

From: Yip Mei Kee [mailto:MK...@kpkqs.com]
Sent: Friday, December 28, 2012 11:12 AM
To: Marcus Mok
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; 'Fam'; jame...@mektrik.com.my; 'yong' (ccy...@mektrik.com.my)
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Dear Marcus

 

Please be informed that the M&E cost estimation given is NOT completed as they haven’t provide us the M&E cost impact, if any for those units not done on site if Option 1 or Option 2 is adopt.

 

We will forward to you the said cost estimation once we receive the balance of the M&E costing.

 

Thanks & regards

 

Yip Mei Kee,
Deputy Contract Manager,

D +603 2166 8000
mk...@kpkqs.com 

 

KPK Quantity Surveyors
18-6 & 18-7, Block B,
18th Floor, Megan Avenue II,
12 Jalan Yap Kwan Seng,
50450 Kuala Lumpur, Malaysia.
T +603 2166 8000 F +603 2166 8228
www.kpkqs.com

 

From: Marcus Mok [mailto:mar...@ppcity.com.my]
Sent: 28 December 2012 10:57
To: 'yong'; Toh Keng Loi; 'C'arch-breezeway'; Nasirah Mahamad; Yip Mei Kee
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; 'Fam'; jame...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Mdm/Ms.Yip/Nasirah,

 

Please give us the costing ASAP. Thanks

 

Regards,

Marcus

 

 

From: Marcus [mailto:mar...@ppcity.com.my]
Sent: Wednesday, December 26, 2012 6:06 PM
To: 'yong'; 'Toh Keng Loi'; 'C'arch-breezeway'; 'Nasirah Mahamad'; 'Yip Mei Kee'
Cc: 'la...@ppcity.com.my'; 'kho...@ppcity.com.my'; 'ja...@ppcity.com.my'; 'Jeremy Yee'; 's...@c-arch.com.my'; 'kh...@tdceng.com.my'; 'KPK-R9'; 'Fam'; 'jame...@mektrik.com.my'
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Mdm/Ms.Yip/Nasirah,

 

Can I have the costing by Friday morning.

 

Regards,

Marcus

 

From: yong [mailto:ccy...@mektrik.com.my]
Sent: Monday, December 24, 2012 6:49 PM
To: 'Toh Keng Loi'; 'C'arch-breezeway'; 'Nasirah Mahamad'; 'Yip Mei Kee'
Cc: la...@ppcity.com.my; 'Marcus'; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; 'KPK-R9'; 'Fam'; jame...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Dear Madam Toh/ Nasirah,

 

The cost of the M&E works for the changes on the two option are as follow in red:

 

1.     Option 1 – relocation of A/C to false beam/ box up at the perimeter of the void; add fibrous plaster ceiling over the void (to minimize exposed R.C. beams). No hacking involved.

No additional cost from A/C works.

Electrical (Relocated lighting point, make good, hacking cost, omit ceiling fan point & add wall fan point = RM 5,270)

 

2.       Option 2 – no relocation of A/C, but hacking to allow for A/C drain pipe to go through the floor slab. Additional false beam/ box up at the stair (for A/C copper pipe) and fibrous ceiling over the void (to minimize exposed R.C. beams).

Additional cost of RM 150.00/ unit for hacking works involve for the drain piping and making good. 

Electrical (omit ceiling fan point, made good, hacking cost & add wall fan point = RM 1,190)

 

We trust the above is in order and please do not hesitate should you have any queries.

Thank you.

 

 

Regards,

 

C.C. Yong

Electrical Engineer

Perunding Mektrik Sdn. Bhd.

No.8, Jalan SS2/103,

47300 Petaling Jaya,

Selangor.

Tel: 03 7729 7759

 

 

 

 

 

From: Toh Keng Loi [mailto:KL...@kpkqs.com]
Sent: Monday, 24 December, 2012 1:19 PM
To: C'arch-breezeway; Nasirah Mahamad; Yip Mei Kee
Cc: la...@ppcity.com.my; 'Marcus'; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; Fam; jame...@mektrik.com.my; ccy...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Thanks Chee for the quick response

 

Toh Keng Loi,

Technical Director, Malaysia

D +603 2166 8006

kl...@kpkqs.com

 

KPK Quantity Surveyors (Semenanjung) Sdn Bhd

18-6 & 18-7, Block B,

18th Floor, Megan Avenue II,

12 Jalan Yap Kwan Seng,

50450 Kuala Lumpur, Malaysia.

T +603 2166 8000 F +603 2166 8228

www.kpkqs.com

 

From: C'arch-breezeway [mailto:1012_br...@c-arch.com.my]
Sent: Monday, 24 December, 2012 1:04 PM
To: Toh Keng Loi; Nasirah Mahamad; Yip Mei Kee
Cc: la...@ppcity.com.my; 'Marcus'; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; Fam; jame...@mektrik.com.my; ccy...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Mdm Toh,

 

Please see our reply in red below.

 

Many thanks.

 

 

 

Regards,

CHEE E TANG

C' arch architecture & design sb

D5-1-G, Pusat Perdagangan Dana 1

Jalan PJU 1A/46

47301 Petaling Jaya

Selangor Darul Ehsan

Malaysia

Tel :    +603 7843 6866

Fax:    +603 7843 6860

e    :    pro...@c-arch.com.my

 

 

 

From: Toh Keng Loi [mailto:KL...@kpkqs.com]
Sent: Friday, December 21, 2012 10:04 PM
To: C'arch-breezeway
Cc: la...@ppcity.com.my; Marcus; kho...@ppcity.com.my; ja...@ppcity.com.my; Jeremy Yee; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Importance: High

 

Dear Mr Chee

 

While doing our costing for the above, we realised that we need the following info in order for us to do a complete cost reporting:

 

1)      C’Arch to provide sross sections of the affected areas for both options, for us to have better understanding of the construction

See our sketches attached.

2)      C’Arch to advise No of units for which construction had been done, for us to cost out abortive work

Type A/A1 – Affected Block 1, 2, 3 & 6

Type C – Option 1 – Affected Block 1, 2, 3, 4 & 6

Type C – Option 2 – Affected ALL Blocks

3)      M&E Engineer to advise related M&E costs such as air-con piping, relocation cost, additional fan point, etc

PMSB to advise.

4)      C&S Engineer to confirm if hacking of slab is allowable taking into consideration diameter of pipe, etc

TDC to advise.

 

By copy of this email, we appreciate that the respective consultants can advise us accordingly.

 

Thanks & Regards

 

Toh Keng Loi,

Technical Director, Malaysia

D +603 2166 8006

kl...@kpkqs.com

 

KPK Quantity Surveyors (Semenanjung) Sdn Bhd

18-6 & 18-7, Block B,

18th Floor, Megan Avenue II,

12 Jalan Yap Kwan Seng,

50450 Kuala Lumpur, Malaysia.

T +603 2166 8000 F +603 2166 8228

www.kpkqs.com

 

From: C'arch-breezeway [mailto:1012_br...@c-arch.com.my]
Sent: Thursday, 20 December, 2012 10:51 AM
To: KPK-R9; Toh Keng Loi; Yip Mei Kee; Nasirah Mahamad
Cc: la...@ppcity.com.my; Marcus; kho...@ppcity.com.my; ja...@ppcity.com.my; Jeremy Yee; s...@c-arch.com.my
Subject: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution

 

Mdm Toh & Nasirah,

 

Please find attached herewith the summary of design issues, together with the proposed resolutions, for your immediate action.

 

There are 2 options for Parkhomes Type C Study:

1.     Option 1 – relocation of A/C to false beam/ box up at the perimeter of the void; add fibrous plaster ceiling over the void (to minimize exposed R.C. beams). No hacking involved.

2.     Option 2 – no relocation of A/C, but hacking to allow for A/C drain pipe to go through the floor slab. Additional false beam/ box up at the stair (for A/C copper pipe) and fibrous ceiling over the void (to minimize exposed R.C. beams).

 

Additional adjustments are also noted on the drawings and/or tabulated.

 

Please do not hesitate should you have any queries and/or wish to discuss this further. Kindly revert with the cost by tomorrow, 21.12.2012, as agreed in the CCM yesterday.

 

Many thanks.

 

 

 

Regards,

CHEE E TANG

C' arch architecture & design sb

D5-1-G, Pusat Perdagangan Dana 1

Jalan PJU 1A/46

47301 Petaling Jaya

Selangor Darul Ehsan

Malaysia

Tel :    +603 7843 6866

Fax:    +603 7843 6860

e    :    pro...@c-arch.com.my

 

 

 

From: C'arch-breezeway [mailto:1012_br...@c-arch.com.my]
Sent: Wednesday, December 19, 2012 8:03 PM
To: la...@ppcity.com.my; Marcus
Cc: kho...@ppcity.com.my; ja...@ppcity.com.my; Jeremy Yee; s...@c-arch.com.my
Subject: 1012 - Breezeway - Design Issues & Proposed Resolution

 

Dear Mr. Lai,

 

Further to the meeting and site inspection this afternoon, please find attached herewith our summary of the design issues, together with the proposed resolutions, for your immediate attention. Hopefully the tabulation and drawings are succinct enough.

 

However please do not hesitate to contact us should you have any queries and/or require any additional information/drawings.

 

Many thanks.

 

 

 

Regards,

CHEE E TANG

C' arch architecture & design sb

D5-1-G, Pusat Perdagangan Dana 1

Jalan PJU 1A/46

47301 Petaling Jaya

Selangor Darul Ehsan

Malaysia

Tel :    +603 7843 6866

Fax:    +603 7843 6860

e    :    pro...@c-arch.com.my

 

 