From: Yip Mei Kee [mailto:MK...@kpkqs.com]
Sent: Friday, 28 December, 2012 5:15 PM
To: kho...@ppcity.com.my
Cc: KPK-R9; Carch_breezeway (1012_br...@c-arch.com.my); la...@ppcity.com.my; mar...@ppcity.com.my; Jacky Ow (ja...@ppcity.com.my); ye...@ppcity.com.my; kh...@tdceng.com.my; lee...@ppcity.com.my
Subject: Breezeway - COSTING: Design Issues & Proposed Resolution
Importance: High
Dear Mr Khoo,
Kindly find the attached cost estimation for your attention and further action.
Thanks & regards
Nasirah / Yip
From: yong [mailto:ccy...@mektrik.com.my]
Sent: Friday, December 28, 2012 4:27 PM
To: 'Marcus Mok'; Yip Mei Kee; 'Fam'
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; jame...@mektrik.com.my; cArch Anny; Chew; lee...@ppcity.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Dear Madam Toh/Ms Yip/ Nasirah,
Please find the VO cost breakdown details as following: -
Option 1
a) To relocate 1 no lighting point type C (7 lot) = RM630
b) Hacking & labour cost for type C (7 lot) = RM 560
c) To relocate ceiling fan point for type A,A1 & C (17 lot) = RM2,720
d) Hacking & labour cost for type A,A1 & C (17 lot) = RM1,360
Total = RM 5,270
Option 2
a) To relocate 1 no light point for type C ( 7 lot) = RM630
b) Hacking & labour cost for type C (7 lot) = RM 560
Total = RM 1,190
The cost above is current additional cost incur at site, which is based on 17 units (Total is 76 units).
We need your early confirmation for the design, as there is balance of 59 units yet to be done. Else there will be more VO cost incur as the site is in progress.
We trust the above is in order and please do not hesitate should you have any queries.
Thank you.
Regards,
C.C. Yong
Electrical Engineer
Perunding Mektrik Sdn. Bhd.
No.8, Jalan SS2/103,
47300 Petaling Jaya,
Selangor.
Tel: 03 7729 7759
From: Marcus Mok [mailto:mar...@ppcity.com.my]
Sent: Friday, 28 December, 2012 11:18 AM
To: 'Yip Mei Kee'; 'Fam'; ''yong''
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; 'KPK-R9'; jame...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Ms.Yip,
OK please revert to us ASAP once you have compiled the M&E and additional box-up’s costing.
Fam/Yong,
Please reply by today.
Thanks & Regards,
Marcus
From: Yip Mei Kee [mailto:MK...@kpkqs.com]
Sent: Friday, December 28, 2012 11:12 AM
To: Marcus Mok
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; 'Fam'; jame...@mektrik.com.my; 'yong' (ccy...@mektrik.com.my)
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Dear Marcus
Please be informed that the M&E cost estimation given is NOT completed as they haven’t provide us the M&E cost impact, if any for those units not done on site if Option 1 or Option 2 is adopt.
We will forward to you the said cost estimation once we receive the balance of the M&E costing.
Thanks & regards
Yip Mei Kee,
Deputy Contract Manager,
D +603 2166 8000
mk...@kpkqs.com
KPK Quantity Surveyors
18-6 & 18-7, Block B,
18th Floor, Megan Avenue II,
12 Jalan Yap Kwan Seng,
50450 Kuala Lumpur, Malaysia.
T +603 2166 8000 F +603 2166 8228
www.kpkqs.com
From: Marcus Mok [mailto:mar...@ppcity.com.my]
Sent: 28 December 2012 10:57
To: 'yong'; Toh Keng Loi; 'C'arch-breezeway'; Nasirah Mahamad; Yip Mei Kee
Cc: la...@ppcity.com.my; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; 'Fam'; jame...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Mdm/Ms.Yip/Nasirah,
Please give us the costing ASAP. Thanks
Regards,
Marcus
From: Marcus [mailto:mar...@ppcity.com.my]
Sent: Wednesday, December 26, 2012 6:06 PM
To: 'yong'; 'Toh Keng Loi'; 'C'arch-breezeway'; 'Nasirah Mahamad'; 'Yip Mei Kee'
Cc: 'la...@ppcity.com.my'; 'kho...@ppcity.com.my'; 'ja...@ppcity.com.my'; 'Jeremy Yee'; 's...@c-arch.com.my'; 'kh...@tdceng.com.my'; 'KPK-R9'; 'Fam'; 'jame...@mektrik.com.my'
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Mdm/Ms.Yip/Nasirah,
Can I have the costing by Friday morning.
Regards,
Marcus
From: yong [mailto:ccy...@mektrik.com.my]
Sent: Monday, December 24, 2012 6:49 PM
To: 'Toh Keng Loi'; 'C'arch-breezeway'; 'Nasirah Mahamad'; 'Yip Mei Kee'
Cc: la...@ppcity.com.my; 'Marcus'; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; 'KPK-R9'; 'Fam'; jame...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Dear Madam Toh/ Nasirah,
The cost of the M&E works for the changes on the two option are as follow in red:
1. Option 1 – relocation of A/C to false beam/ box up at the perimeter of the void; add fibrous plaster ceiling over the void (to minimize exposed R.C. beams). No hacking involved.
No additional cost from A/C works.
Electrical (Relocated lighting point, make good, hacking cost, omit ceiling fan point & add wall fan point = RM 5,270)
2. Option 2 – no relocation of A/C, but hacking to allow for A/C drain pipe to go through the floor slab. Additional false beam/ box up at the stair (for A/C copper pipe) and fibrous ceiling over the void (to minimize exposed R.C. beams).
Additional cost of RM 150.00/ unit for hacking works involve for the drain piping and making good.
Electrical (omit ceiling fan point, made good, hacking cost & add wall fan point = RM 1,190)
We trust the above is in order and please do not hesitate should you have any queries.
Thank you.
Regards,
C.C. Yong
Electrical Engineer
Perunding Mektrik Sdn. Bhd.
No.8, Jalan SS2/103,
47300 Petaling Jaya,
Selangor.
Tel: 03 7729 7759
From: Toh Keng Loi [mailto:KL...@kpkqs.com]
Sent: Monday, 24 December, 2012 1:19 PM
To: C'arch-breezeway; Nasirah Mahamad; Yip Mei Kee
Cc: la...@ppcity.com.my; 'Marcus'; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; Fam; jame...@mektrik.com.my; ccy...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Thanks Chee for the quick response
Toh Keng Loi,
Technical Director, Malaysia
KPK Quantity Surveyors (Semenanjung) Sdn Bhd
18-6 & 18-7, Block B,
18th Floor, Megan Avenue II,
12 Jalan Yap Kwan Seng,
50450 Kuala Lumpur, Malaysia.
From: C'arch-breezeway [mailto:1012_br...@c-arch.com.my]
Sent: Monday, 24 December, 2012 1:04 PM
To: Toh Keng Loi; Nasirah Mahamad; Yip Mei Kee
Cc: la...@ppcity.com.my; 'Marcus'; kho...@ppcity.com.my; ja...@ppcity.com.my; 'Jeremy Yee'; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9; Fam; jame...@mektrik.com.my; ccy...@mektrik.com.my
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Mdm Toh,
Please see our reply in red below.
Many thanks.
Regards,
CHEE E TANG
C' arch architecture & design sb
D5-1-G, Pusat Perdagangan Dana 1
Jalan PJU 1A/46
47301 Petaling Jaya
Selangor Darul Ehsan
Malaysia
Tel : +603 7843 6866
Fax: +603 7843 6860
From: Toh Keng Loi [mailto:KL...@kpkqs.com]
Sent: Friday, December 21, 2012 10:04 PM
To: C'arch-breezeway
Cc: la...@ppcity.com.my; Marcus; kho...@ppcity.com.my; ja...@ppcity.com.my; Jeremy Yee; s...@c-arch.com.my; kh...@tdceng.com.my; KPK-R9
Subject: RE: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Importance: High
Dear Mr Chee
While doing our costing for the above, we realised that we need the following info in order for us to do a complete cost reporting:
1) C’Arch to provide sross sections of the affected areas for both options, for us to have better understanding of the construction
See our sketches attached.
2) C’Arch to advise No of units for which construction had been done, for us to cost out abortive work
Type A/A1 – Affected Block 1, 2, 3 & 6
Type C – Option 1 – Affected Block 1, 2, 3, 4 & 6
Type C – Option 2 – Affected ALL Blocks
3) M&E Engineer to advise related M&E costs such as air-con piping, relocation cost, additional fan point, etc
PMSB to advise.
4) C&S Engineer to confirm if hacking of slab is allowable taking into consideration diameter of pipe, etc
TDC to advise.
By copy of this email, we appreciate that the respective consultants can advise us accordingly.
Thanks & Regards
Toh Keng Loi,
Technical Director, Malaysia
KPK Quantity Surveyors (Semenanjung) Sdn Bhd
18-6 & 18-7, Block B,
18th Floor, Megan Avenue II,
12 Jalan Yap Kwan Seng,
50450 Kuala Lumpur, Malaysia.
From: C'arch-breezeway [mailto:1012_br...@c-arch.com.my]
Sent: Thursday, 20 December, 2012 10:51 AM
To: KPK-R9; Toh Keng Loi; Yip Mei Kee; Nasirah Mahamad
Cc: la...@ppcity.com.my; Marcus; kho...@ppcity.com.my; ja...@ppcity.com.my; Jeremy Yee; s...@c-arch.com.my
Subject: 1012 - Breezeway - COSTING: Design Issues & Proposed Resolution
Mdm Toh & Nasirah,
Please find attached herewith the summary of design issues, together with the proposed resolutions, for your immediate action.
There are 2 options for Parkhomes Type C Study:
1. Option 1 – relocation of A/C to false beam/ box up at the perimeter of the void; add fibrous plaster ceiling over the void (to minimize exposed R.C. beams). No hacking involved.
2. Option 2 – no relocation of A/C, but hacking to allow for A/C drain pipe to go through the floor slab. Additional false beam/ box up at the stair (for A/C copper pipe) and fibrous ceiling over the void (to minimize exposed R.C. beams).
Additional adjustments are also noted on the drawings and/or tabulated.
Please do not hesitate should you have any queries and/or wish to discuss this further. Kindly revert with the cost by tomorrow, 21.12.2012, as agreed in the CCM yesterday.
Many thanks.
Regards,
CHEE E TANG
C' arch architecture & design sb
D5-1-G, Pusat Perdagangan Dana 1
Jalan PJU 1A/46
47301 Petaling Jaya
Selangor Darul Ehsan
Malaysia
Tel : +603 7843 6866
Fax: +603 7843 6860
From: C'arch-breezeway [mailto:1012_br...@c-arch.com.my]
Sent: Wednesday, December 19, 2012 8:03 PM
To: la...@ppcity.com.my; Marcus
Cc: kho...@ppcity.com.my; ja...@ppcity.com.my; Jeremy Yee; s...@c-arch.com.my
Subject: 1012 - Breezeway - Design Issues & Proposed Resolution
Dear Mr. Lai,
Further to the meeting and site inspection this afternoon, please find attached herewith our summary of the design issues, together with the proposed resolutions, for your immediate attention. Hopefully the tabulation and drawings are succinct enough.
However please do not hesitate to contact us should you have any queries and/or require any additional information/drawings.
Many thanks.
Regards,
CHEE E TANG
C' arch architecture & design sb
D5-1-G, Pusat Perdagangan Dana 1
Jalan PJU 1A/46
47301 Petaling Jaya
Selangor Darul Ehsan
Malaysia
Tel : +603 7843 6866
Fax: +603 7843 6860