Dear Dr. Maarten Sierhuis,Thank you very much for the detailed reply. Its really helpful to proceed further in designing one combined model (Generic Model) keeping in view scenario-1 to scenario-n. However, I have few questions to verify the concept of one combined Brahms Model(Generic Model) representing all the features of scenario-1 to scenario-n.1. Do we need to create brahms model and simulation run separately for each scenario from 1 to n before creating one single combined brahms model (Generic Model)?
2. I have understanding like, once we create one single combined brahms model (Generalized Model) for all scenarios from 1 to n, we can test all our scenarios from 1 to n on the same generalized Brahms Model. Am I right?
3. Generally speaking, If I remember the concept of Machine Intelligence, we have to train our machine by giving lots of inputs and data. Consequently, we can predict our model based on the database history. However, in case of Generic Model of Brahms, we are creating one general model which is representing all the features of scenario-1 to scenario-n. Do we consider this general model of Brahms in terms of Machine Intelligence or its just simple intelligence?
4. I have studied your Ph.D thesis which you sent me before. There is a concept of Predictive Modeling in the thesis. If I want to create Predictive Model like, I observed one situation in the work practice system having 40 scenarios, should I use concept of Machine learning or simply create Generic model which represents all the features of scenario1 to scenario-40?or Where is the concept of Machine Intelligence in this regard? Please guide and suggest
5. What features of Brahms distinguishes it from other Multi Agent Systems so that I can be strongly convinced that without Brahms, I wouldn't be able to create predictive model/Generic Model as mentioned above? Please shed light on it. Please remember, I have gone through your research papers but I want to make it more clear from your side.
6. Recently, I switched over from Windows 8.1 to Windows 10. Brahms simulator is not running in Windows 10 while it was working well in Windows 8.1. Is there any solution?
--
You received this message because you are subscribed to a topic in the Google Groups "Brahms Forum" group.
To unsubscribe from this topic, visit https://groups.google.com/d/topic/brahms-forum/2WxZ0dNnYcQ/unsubscribe.
To unsubscribe from this group and all its topics, send an email to brahms-forum+unsubscribe@googlegroups.com.
Dear Dr. Maarten Sierhuis,
Abid Ghaffar
Dear Dr. Maarten Sierhuis,
Once again so nice of you for your kind guidance and support. Its really helping me to proceed in the right direction. I am creating Brahms Predictive Model at some Malaysian University Department where we have around 12 people working in the work practice system. Activities are not that much complex as in your case for the Mars Exploration Mission. I am trying to simulate the work practice system through predictive modelling as per research available from your side in particular.Ethnography, I have completed and now I am simulating the scenarios. I would like to ask you the question here, generally how many scenarios approx needed to create generic model (Prediictive Model)? For example, in my case all the activities monitored in two weeks may complete all the observations, however more observations are also available upto three months for a particular situation.
1)Do you think two weeks scenarios would be enough to simulate the generic model assuming scenario-1 to scenario-10, as we have 10 working days in two weeks. Scenario-10 reflects all the other activities from scenario-1 to scenario-9. Is it necessary we should get scenarios for six months or more (160 scenarios for six months period) to create generic/predictive modelling. What if, our 10 scenarios have complete observations? Please suggest and guide here. What is the practice in general?
2) In case of generic model, the time line would be reflected from 8am to 5 p.m.(Lets assume office timings from 8 am to 5pm). How can we get the exact timing of each activity from scenario-1 to scenario-10 in the Agent Viewer?. Do you think we can print exact timings of activities as it happens in real work practice situation in the Agent Viewer Program. In my experience with Brahms and also from your Thesis, I see the timings are written in SECONDS like 20seconds or 5 seconds; not like 09:45:50 format. Activities are occurred at some particular time like 3:30pm or 10:30am. Is it possible, we could know about the exact time of happening of activities? Please shed light on it.
Dear Dr. Maarten Sierhuis,
Best Regards,
Abid Ghaffar
To unsubscribe from this group and all its topics, send an email to brahms-forum...@googlegroups.com.
To post to this group, send email to brahms...@googlegroups.com.
Visit this group at https://groups.google.com/group/brahms-forum.
For more options, visit https://groups.google.com/d/optout.