Public Input Requested On Ann Arbor B2B Trail Tunnel Under The Tracks & Barton Nature Area Trail Routing

1 view
Skip to first unread message

Bob Krzewinski

unread,
Feb 28, 2019, 11:11:40 AM2/28/19
to border-t...@googlegroups.com

The Washtenaw County Parks & Recreation Commission and the City of Ann Arbor have hired an engineering firm to perform a feasibility study to construct a pedestrian and non-motorized tunnel underneath the MDOT railroad at the north end of Bandemer Park. Additionally, the team is exploring options for routing the trail through Barton Nature Area to connect to the parking lot south of Barton Dam, approximately 0.6 miles.


Public comment is requested and appreciated through March 12th at https://www.washtenaw.org/DocumentCenter/View/11889/Public-Comment-Sheet-Barton-Bandemer-Project. For further information, click on the links below…

·         Map of the proposed project

·         Project description

·         Washtenaw County Parks & Recreation Commission B2B projects web page

Ben Thompson

unread,
Feb 28, 2019, 12:19:08 PM2/28/19
to border-t...@googlegroups.com
public comment link is broken, FYI<div
id="DAB4FAD8-2DD7-40BB-A1B8-4E2AA1F9FDF2"><br />
<table style="border-top: 1px solid #D3D4DE;">
<tr>
<td style="width: 55px; padding-top: 13px;"><a
href="https://www.avast.com/sig-email?utm_medium=email&utm_source=link&utm_campaign=sig-email&utm_content=webmail&utm_term=icon"
target="_blank"><img
src="https://ipmcdn.avast.com/images/icons/icon-envelope-tick-round-orange-animated-no-repeat-v1.gif"
alt="" width="46" height="29" style="width: 46px; height: 29px;"
/></a></td>
<td style="width: 470px; padding-top: 12px; color: #41424e;
font-size: 13px; font-family: Arial, Helvetica, sans-serif;
line-height: 18px;">Virus-free. <a
href="https://www.avast.com/sig-email?utm_medium=email&utm_source=link&utm_campaign=sig-email&utm_content=webmail&utm_term=link"
target="_blank" style="color: #4453ea;">www.avast.com</a>
</td>
</tr>
</table><a href="#DAB4FAD8-2DD7-40BB-A1B8-4E2AA1F9FDF2" width="1"
height="1"></a></div>

On 2/28/19, Bob Krzewinski <wolv...@gmail.com> wrote:
> The Washtenaw County Parks & Recreation Commission and the City of Ann
> Arbor have hired an engineering firm to perform a feasibility study to
> construct a pedestrian and non-motorized tunnel underneath the MDOT
> railroad at the north end of Bandemer Park. Additionally, the team is
> exploring options for routing the trail through Barton Nature Area to
> connect to the parking lot south of Barton Dam, approximately 0.6 miles.
>
>
> Public comment is requested and appreciated through March 12th at
> https://www.washtenaw.org/DocumentCenter/View/11889/Public-Comment-Sheet-Barton-Bandemer-Project.
> For further information, click on the links below…
>
> · *Map of the proposed project
> <https://www.washtenaw.org/DocumentCenter/View/11787/Barton-Bandemer-Project-Overview-Map>*
>
> · Project description
> <https://www.washtenaw.org/DocumentCenter/View/11788/Barton-Bandemer-Project-Description-and-Meeting-Notice>
>
> · Washtenaw County Parks & Recreation Commission B2B projects web
> page <https://www.washtenaw.org/952/Border-to-Border-Trail-Projects>
>
> --
> You received this message because you are subscribed to the Google Groups
> "Border To Border" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to border-to-bord...@googlegroups.com.
> To post to this group, send email to border-t...@googlegroups.com.
> Visit this group at https://groups.google.com/group/border-to-border.
> For more options, visit https://groups.google.com/d/optout.
>

Bob Krzewinski

unread,
Feb 28, 2019, 12:39:00 PM2/28/19
to border-t...@googlegroups.com
Thanks Ben. Looks like the problem is with the Washtenaw County website. I am checking on it now.

Bob Krzewinski
Friends of the B2B Trail

Bob Krzewinski

unread,
Feb 28, 2019, 12:41:22 PM2/28/19
to border-t...@googlegroups.com
Please note that the comment link is temporarily down.

Bruce Geffen

unread,
Feb 28, 2019, 1:01:04 PM2/28/19
to Bob Krzewinski, border-t...@googlegroups.com
I emailed Peter about it.

--
You received this message because you are subscribed to the Google Groups "b2b-board-discussion" group.
To unsubscribe from this group and stop receiving emails from it, send an email to b2b-board-discus...@googlegroups.com.
To post to this group, send email to b2b-board-...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/b2b-board-discussion/CA%2BURHCmA99jhinzANeqCCa%2BCb4wD%2BM_2yeuWGjKH3VmWOXGr6w%40mail.gmail.com.

Bob Krzewinski

unread,
Feb 28, 2019, 1:05:05 PM2/28/19
to Bruce Geffen, border-t...@googlegroups.com
Thanks. 

Bob

Bruce Geffen

unread,
Feb 28, 2019, 2:05:50 PM2/28/19
to border-t...@googlegroups.com


---------- Forwarded message ---------
From: Peter Sanderson <sande...@washtenaw.org>
Date: Thu, Feb 28, 2019 at 1:56 PM
Subject: RE: Public Input Requested On Ann Arbor B2B Trail Tunnel Under The Tracks & Barton Nature Area Trail Routing
To: Bruce Geffen <gef...@gmail.com>


Thanks Bruce. I’ve fixed the link.

 

Peter Sanderson, PLA

 

Park Planner / Landscape Architect

Washtenaw County Parks

 

P: (734) 971-6337 x332

E: sande...@washtenaw.org

 

From: Bruce Geffen [mailto:gef...@gmail.com]
Sent: Thursday, February 28, 2019 12:27 PM
To: Peter Sanderson
Subject: Fwd: Public Input Requested On Ann Arbor B2B Trail Tunnel Under The Tracks & Barton Nature Area Trail Routing

 

Good afternoon Peter.

 

Thanks for the excellent presentation the other night.

 

I am trying to access the link for the public commentary portion of this, but only get directed to a WCPAR home page sort of thing.  Would you have someone please adjust the settings?

 

Thank you.

 

Bruce Geffen

---------- Forwarded message ---------
From: Bob Krzewinski <wolv...@gmail.com>
Date: Thu, Feb 28, 2019 at 11:11 AM
Subject: Public Input Requested On Ann Arbor B2B Trail Tunnel Under The Tracks & Barton Nature Area Trail Routing
To: <border-t...@googlegroups.com>

 

The Washtenaw County Parks & Recreation Commission and the City of Ann Arbor have hired an engineering firm to perform a feasibility study to construct a pedestrian and non-motorized tunnel underneath the MDOT railroad at the north end of Bandemer Park. Additionally, the team is exploring options for routing the trail through Barton Nature Area to connect to the parking lot south of Barton Dam, approximately 0.6 miles.

--
You received this message because you are subscribed to the Google Groups "Border To Border" group.
To unsubscribe from this group and stop receiving emails from it, send an email to border-to-bord...@googlegroups.com.


To post to this group, send email to border-t...@googlegroups.com.
Visit this group at https://groups.google.com/group/border-to-border.

Reply all
Reply to author
Forward
0 new messages