Keith <me...@kb3tcb.com>: Apr 06 07:17AM -0400
Just thought I update you periodically on our progress.
We made several links with Frederick from Leesburg, Virginia today.
39.166216, -77.588928
We did a 28 mile link between the Leesburg Tennis and WN3R, 39.125207,
-77.567111
The signal strength ranged from 73 to 85.
Testing to the Leesburg hospital is next.
http://www.MAIPN.com
It is too early to draw any definite conclusions but I am willing to say
that a 28 mile link is pushing the limits for
a backbone link unless it is between to perfect high points. I'd think
that about 12 miles is a good distance under average conditions.
It seems you want a signal around 78 dbi or better for an on/off ramp
and a signal in the 60-70 dbi range for the backbone.
Keith
Keith <me...@kb3tcb.com>: Apr 06 07:08AM -0400
Just thought I update you periodically on our progress.
We made several links with Frederick from Leesburg, Virginia today.
39.166216, -77.588928
We did a 28 mile link between the Leesburg Tennis and WN3R, 39.125207,
-77.567111
The signal strength ranged from 73 to 85.
Testing to the Leesburg hospital is next.
http://www.MAIPN.com
It is too early to draw any definite conclusions but I am willing to say
that a 28 mile link is pushing the limits for
a backbone link unless it is between to perfect high points. I'd think
that about 12 miles is a good distance under average conditions.
It seems you want a signal around 78 dbi or better for an on/off ramp
and a signal in the 60-70 dbi range for the backbone.
Keith
You received this digest because you're subscribed to updates for this group. You can change your settings on the group membership page.
To unsubscribe from this group and stop receiving emails from it send an email to boar-net+u...@googlegroups.com.