Sorry I missed the meeting tonight. Our Site Director had a surprise for me
and my ITA. Over the last three months we re-engineered the physical layout
of the ports on our three CISCO switches and revamped the LAN cabling. This
project saved Sykes ~ $12k, cost of a contractor to come in and do that.
Well, to our surprise, he took us out to the East 40 tonight for a great
steak dinner as a reward for our work.
Hope to be at the next one in Oct.
Harley.
No virus found in this incoming message.
Checked by AVG - www.avg.com
Version: 9.0.851 / Virus Database: 271.1.1/3110 - Release Date: 09/02/10
13:50:00