Junta,
we need to test whatever modifications have been made on the plant with compressed air fr leaks.
You all the protocol for it pretty well.
So we will be doing the testing tomorrow afti - 1 manager and two orgis per slot.
Our work is basically testing the level indicators of all vessels and the NRVs on top of all 3 pumps.
Today evening we need to check the availability of all the things required fr the testing so kal koi pain na ho.
Following 3 ppl are supposed to go today n upload info regd. the availability of all requirements ( nozzle compressor tube, water bottles, soap, etc.)
Manager: Vivek Yadav
Alok
Sumant
(Time fr the slot yadav decide karke bata dega)
Pls put up the info as soon as possible.
--
Prateek Maheshwari
Third Year Undergraduate
Chemical Engineering Department
IIT Bombay