[BetterNepal] KL Tower plans mid-April soft launch

10 views
Skip to first unread message

sohan

unread,
Jan 17, 2012, 7:26:53 AM1/17/12
to bette...@googlegroups.com
KL Tower and Multicomplex is planning to open KL Tower at Chuchhepati, Kathmandu by mid-April 2012. Although the mall will be formally launched in mid-July 2012, a soft launch will be held in mid-April. We will be able to obtain products and utilize the facilities after the soft launch.




Currently under construction, the 10-storey building will house branded stores and a department store on the ground floor, electronics stores on the first floor, readymade clothes stores on the second and third floors, a gaming zone on the fourth floor, a food court on the fifth floor, a multiplex on the sixth, seventh and eighth floors and office space on the ninth and 10th floors. The mall will be centrally air conditioned. 


Apart from this, the mall will also operate a viewing tower on the top floor. According to Dhungana, the view tower will be a centre of attraction for tourists as one can see the Himalaya and the cultural heritage of the Kathmandu valley. The mall will also feature a bank.


Keeping in mind traffic congestion and unavailability of parking space, the mall is constructing a double basement parking lot that can accommodate around 100 four-wheelers and 400 two-wheeler's.

--
Posted By sohan to BetterNepal at 1/17/2012 04:26:00 AM
Reply all
Reply to author
Forward
0 new messages