Hi , I am having this timestep synchronization error(shown below) when i link my energyplus and simulink in BCVTB. I have change my idf to timestep 6, and spf director(polmety) timestep to 600 but is still not working. Can I seek advice on this?
ptolemy.kernel.util.IllegalActionException: Simulation time of .system.Simulink is not synchronized.
Time step in Ptolemy = 600.0
Time step in client = 900.0
Time in client = 1800.0