Hi sudheer,
Thanks for your opinion.
I figured out. You have to check all the documents that has to be attached while sending the drawing. If some have them are not checked then it will not work at all. Try yourself once.
Abrar told me not to attach the hard copy of the drawing until it is finalised by the engineer in charge. They rejected my first file citing the reason, that hard copy of the drawing is not available.
It is weird that abrar says that hard copy is not required with the file, and when I do not check that box, then I will not get LP no. So I checked all the docs and sent it, and I received the LP no.
What is the status of the sanction of your first project?
mehar.
--
K. Meharnath