This is for your kind information that your Representatives are continuously forcing me for taking over of flat A-89. They had confirmed that flat is complete in all respect and ready to move position but while I reached at site on 22/10/2014 and examined the flat following major deficiencies have been observed -
1. One tile of Master bedroom is broken.
2. Window glass of hall and both the bathrooms/toilets are not fitted.
3. Gaps observed between floor tiles as well as level also not maintained.
4. Gap observed between floor tiles and skating tiles at all over.
5. Door lock of One toilet is not functioning.
6. Door bell switch not installed/fitted.
7. Floor level is not maintained i.e. water stayed / accumulated at middle of main hall floor.
8. One wall tiles cracked in kitchen.
9. One wall tile cracked in Bathroom.
10. Semi modular kitchen not furnished completely. work is pending.
11. Seepage observed in one balcony near tap.
12. Quality of workmanship is not up-to the mark.
13. Coating of one fabricated aluminum door is peeling off need to replace.
14. Toilet seats are very dirty / used by workers.
15. Both Wardrobe / wooden almirah are not completed.
16. Electric fittings are seems to be loosed.
17. Chitkani of most of the windows and doors are not functioning properly.
18. False sealing of both bathroom / Toilets are not fitted properly.
19. Electric connection in both bathrooms are not cleared to make further fittings.
20. All windows and doors are not cleaned.
Above deficiencies have been verified by your Rep. Shri Manoj Malhotra and Shri Anupam. I can not understand that how your representatives declared that the flat is ready to move and I can take over the flat. It is not possible to takeover the flat without fulfill / correction of above deficiencies and delay in possession is at your part.
I have to come from Jabalpur (M.P.) every time but till date not getting my flat which make me very unhappy.
It is regretting to say that quality of work and material used are not upto the mark and no one is bothered about customer and their difficulties. They just passing the time and every time they promised to complete the work within two or three days but after one month the position is same. I have to return back to Jabalpur by Monday i.e. 27/10/2014 at morning so please confirm that my flat could be handed over to me by Sunday Noon By 12:00 hrs after getting corrected above all deficiencies.
Project Director of GOWO is also requested to look in to matter and make necessary assistance to overcome from this problem.
Kind Regards,
Arvind Yadav
Flat no. A-89,
Balmukunda Residency, RNE Project
(Mo) 09424314118