Google Groups no longer supports new Usenet posts or subscriptions. Historical content remains viewable.
Dismiss

FCC Daily Digest 2021-10-12

14 views
Skip to first unread message

FCC via ba.broadcast.moderated Admin

unread,
Oct 12, 2021, 1:24:34 PM10/12/21
to

(Moderator's Note: Only FCC actions for the Bay-Area are shown below.)

________________________________
[fcclogo]
Daily Digest
Federal Communications Commission
45 L Street NE
Washington, DC 20554

Vol. 40 No. 937
News media information 202 / 418-0500
Internet: http://www.fcc.gov
ASL Video Call: 1-844-432-2275


October 12, 2021
________________________________
* * * * *


[...]

IN THE MATTER OF FORESTHILL FIRE PROTECTION DISTRICT REQUEST FOR WAIVER OF
SECTION 90.242(B)(4)(IV) OF THE COMMISSION'S RULES. Order grants FFPD's
request for a waiver of the Commission's rules to expand its Travelers'
Information Station area so that it may provide a 2 mV/m signal at 5.25
kilometers from the TIS transmitter site . Action by: Chief, Policy and
Licensing Division, Public Safety and Homeland Security Bureau. Adopted:
2021-10-12 by ORDER. (DA No. 21-1265). PSHSB.
DA-21-1265A1.docx<https://docs.fcc.gov/public/attachments/DA-21-1265A1.docx>
DA-21-1265A1.pdf<https://docs.fcc.gov/public/attachments/DA-21-1265A1.pdf>
DA-21-1265A1.txt<https://docs.fcc.gov/public/attachments/DA-21-1265A1.txt>


(Moderator's Note:

Call Letters or Unlicensed and Company or Place Name match found in
contents linked at URL:


FFPD also specifically demonstrated that it complies with the TIS
spacing rule The TIS spacing rule in 47 CFR § 90.242(a)(2)(i) provides that
the transmitting site of the TIS Station must be located at least 15 km (9.3
miles) measured orthogonally outside the measured 0.5 mV/m daytime contour
(0.1 mV/m for Class A stations) of any AM broadcast station operating on a
first adjacent channel and at least 130 km (80.6 miles) outside the measured
0.5 mV/m daytime contour (0.1 mV/m for Class A stations) of any AM broadcast
station operating on the same channel.

in section 90.242(a)(2)(i) of the Commission’s rules. When FFPD
initially applied for its TIS authorization, FFPD demonstrated that its TIS
station is outside the 0.5 mV/m contour of the nearest co-channel station
operating on 1020 kilohertz (KTNQ, Los Angeles, CA) by 305 miles; outside the
0.5 mV/m contour of the nearest first adjacent station operating on 1010
kilohertz (KIQI, San Francisco, CA) by 65 miles; and outside the 0.5 mV/m
contour of the nearest first adjacent station operating on 1030 kHz (KJDJ,
San Luis Obispo, CA) by 195 miles. See File No. 0009254474, Foresthill Fire
Protection District (filed Oct. 12, 2020). We find that this analysis is
still valid today.



)

[...]

0 new messages