You do not have permission to delete messages in this group
Copy link
Report message
Sign in to report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to
Hi,
I need to create a schedule where if I make a change to the block in the tag section of the schedule, the leader block changes also on the plan. Is that possible? I use AutoCAD 2015 LT