Stage 5 of M37 Newcastle Inner City By-pass

202 views
Skip to first unread message

kakaduhwyA21 (formerly stuarthwy87)

unread,
Oct 10, 2020, 2:15:17 AM10/10/20
to Aussie Highways
Hi

Does anyone know when the Stage 5 of the Newcastle Inner City By-pass is opening, I know work started last year but I can't seem to find an opening date. Does anyone know anything or not.

Cheers,
kakaduhwyA21

Nihat

unread,
Oct 11, 2020, 4:44:49 AM10/11/20
to Aussie Highways
As far as the website goes the pedestrian bridge was being built as part of early works. There was funding in the federal budget for construction of the actual bypass so it may finally get going


--
You received this message because you are subscribed to the Google Groups "Aussie Highways" group.
To unsubscribe from this group and stop receiving emails from it, send an email to aussie-highwa...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/aussie-highways/2b2fa8ef-739e-4958-99ff-453bbb97b7a5n%40googlegroups.com.

kakaduhwyA21 (formerly stuarthwy87)

unread,
Oct 11, 2020, 5:06:02 AM10/11/20
to Aussie Highways

Nihat

unread,
Nov 19, 2020, 4:00:34 AM11/19/20
to Aussie Highways

Paul Rands

unread,
Nov 21, 2020, 7:40:17 PM11/21/20
to aussie-...@googlegroups.com

The project page artist's impression is impressive: https://www.rms.nsw.gov.au/projects/newcastle-inner-city-bypass/rankin-park-to-jesmond.html

It will be good to finally see this completed. Would be good to see the final tie in with Pacific Hwy (A43) at Sandgate too. The reservation has been there forever.

--
Paul Rands
li...@paulrands.com
WWW: http://www.expressway.online/

davis

unread,
Nov 22, 2020, 12:10:26 AM11/22/20
to Aussie Highways
They expressly declined to construct a grade separated northern interchange when the Sandgate section was constructed. 

I'd have though removing the frontage properties and at grade intersections in the original section would be highest priority. Then possible southward extension

Paul Rands

unread,
Nov 22, 2020, 1:12:16 AM11/22/20
to aussie-...@googlegroups.com

I must have missed that. I agree separating traffic from properties should be a priority. And given how backed up the turn from Pacific Hwy onto Sandgate Rd gets in peak, I would've thought they'd be all over getting that sorted out

--
Paul Rands
li...@paulrands.com

doratroad23 (formerly kakaduhwy21)

unread,
Nov 22, 2020, 4:31:08 AM11/22/20
to Aussie Highways
Hi Paul

What is up with A43?

Oh and yes, we will soon get an M route higher than 31 for once

On Sunday, November 22, 2020 at 11:40:17 AM UTC+11 Paul Rands wrote:

doratroad23 (formerly kakaduhwy21)

unread,
Nov 22, 2020, 5:08:05 AM11/22/20
to Aussie Highways
That is a huge bottleneck. At least for the least bit, do JRD/M4 style intersection. (if that's a thing)

Nihat

unread,
Jul 23, 2022, 5:27:01 AM7/23/22
to Aussie Highways
Finally contract awarded


Contract awarded to build fifth stage of Newcastle Inner City Bypass

A design and construct contract has been awarded to Fulton Hogan Construction Pty ahead of the construction of the fifth section of the Newcastle Inner City Bypass getting underway later this year.
 
This section of works will deliver the ‘missing link’ of the bypass between Rankin Park and Jesmond, meaning a faster, safer commute for locals who will be able to bypass 11 sets of traffic lights along this notorious stretch of road.
 
The contract will also involve delivering an early works package, on Lookout Road and McCaffrey Drive, to enable Fulton Hogan to accelerate work around the southern interchange later this year. 
 
Major work is expected to start in October this year with the first cars expected to drive along the new bypass in 2025.
 
The $450 million project is jointly funded on an 80:20 basis by the Australian and New South Wales governments. 
 
Transport for NSW is working closely with NSW Health to ensure the project aligns with work on the John Hunter Health Innovation Precinct and to provide a second access road to the hospital campus.
 
More information about the project is available at nswroads.work/rp2j
 
Quotes attributable to Federal Infrastructure, Transport, Regional Development and Local Government Minister Catherine King:
 
“This 3.4-kilometre stage of the bypass will be one of Newcastle’s largest infrastructure projects.
 
“This is an exciting day for the community, who have long benefitted from the previous stages of the Newcastle Inner City Bypass and know the positive impact this project will have on travel times and congestion.
 
“Once the bypass is complete, commuters will enjoy a reduction of up to 80 per cent on travel times during the morning and afternoon peaks, bypassing 11 sets of traffic lights between Rankin Park and Jesmond.”
 
Quotes attributable to NSW Metropolitan Roads Minister Natalie Ward:
 
“The NSW Government has committed $90 million towards this project, which is expected to create up to 900 jobs during major work.
 
“The Newcastle Inner City Bypass has been designed to provide traffic relief to the surrounding road network by removing up to 30,000 vehicles each day from Lookout Road, Croudace Street and Newcastle Road.
 
“This is a transformational project for the city that will improve traffic flow, reduce travel times and enhance safety for all road users.”
 
Quotes attributable to Federal Member for Newcastle Sharon Claydon:
 
“It is exciting to see the early work at the southern end of the project nearing completion in preparation for major work on the bypass to kick off later in 2022. 
 
“Over the past six months, workers have been busy relocating existing utilities including water, sewer, electrical, gas and telecommunications to pave the way for major work on this vital project.
 
“This job-creating project is good for local workers and will be a big win for commuters across Newcastle.”

Paul Rands

unread,
Jul 23, 2022, 5:52:10 AM7/23/22
to aussie-...@googlegroups.com

About time, this entire route should've been delivered in the 80s.

--
Paul Rands
li...@paulrands.com

AlienChex

unread,
Jul 23, 2022, 8:30:26 PM7/23/22
to Aussie Highways
Have they said anything about what they’ll do to the small strip of suburban road between McCaffey Drive and Myall Road? It will be freeway-grade on both ends but this will still be a standard suburban-grade road with traffic lights. Unless that’s part of a future plan to upgrade the intersections of Cardiff Road and Carnely Ave