DHBVN is advising to submit manual application for Direct Connection

620 views
Skip to first unread message

Amit Singh

unread,
Jun 25, 2018, 8:51:19 AM6/25/18
to ardee-cit...@googlegroups.com

Note: DHBVN is advising to submit manual application. Their site is not robust enough to handle the rush and is crashing.

Tomorrow security guard from our lane will visit each house, if you are facing problems with applying for direct connection, do mention that in the register.
If your reply is YES, then a group of volunteers will assist you applying for the same.

Please apply for new connection from DHBVN without any delay.

Note that ONLY DHBVN supply would be there. 

Mind that once DHBVN changeover, residents having DHBVN meter would be legal consumers of electricity. Government treats Illegal consumption of electricity severely. Therefore, It’s humbly advised to avoid that situation by applying for new connection. 🙏🏽
 
Steps to apply offline:

1) Ready following documents:
  • Two passport size photo
  • Identity proof (copy) : possession letter or allotment letter or sale deed document
  • Ownership proof (copy) : Adhaar card or Voter I card or Pan Card or Passport
  • In case of joint ownership NOC of any of the two owners who is not applying (on a plane paper) to be submitted stating that I have no objections to this application for new connection.
2) Demand Draft in favour of DHBVN 
Calculation of the amount payable:
Load × 1775 + 2840

Example: for 8KVA
(1775 X 8) + 2840 = 17,040 Rs

3) Physical forms are available at RWA office ( D-11/18 - Basement )
Or take a printout of the empty form attached in this email.
Or collect the printed form from me at B-70 (GF)

Also attached is a sample application form for reference.

Note while filling the form:

Circle: Gurugram II
Subdivision: G26 (South City)
Type of Supply: Permanent 
Category: Domestic (DS)

The filled application form needs to be submitted at  ( D-11/18 - Basement ), from there it will be picked up by DHBVN employees.

regards
Amit

WhatsApp Image 2018-06-24 at 16.26.47.jpeg
WhatsApp Image 2018-06-24 at 16.26.36.jpeg

S K Adya

unread,
Jun 25, 2018, 10:37:38 AM6/25/18
to ardee-cit...@googlegroups.com
Please send the copy of authority letter that orders the replacement of the system, with copy to Ardee city replacing their supply of electricity. Else it may not be apply-able.
Thanks

SKAdya
B55 GF

--
You received this message because you are subscribed to the Google Groups "Ardee City B- Block" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ardee-city-b--b...@googlegroups.com.
To post to this group, send email to ardee-cit...@googlegroups.com.
Visit this group at https://groups.google.com/group/ardee-city-b--block.
For more options, visit https://groups.google.com/d/optout.

Amit Singh

unread,
Jun 25, 2018, 11:31:45 AM6/25/18
to ardee-cit...@googlegroups.com
Here is the communication we got from DHBVN (attached)
Apart from this, as you are aware that DHBVN was not entertaining any direct connection application from ardee residents just a few days back, but now the entire machinery is supporting us to file the applications, so that they can take the next step.

I'm sure you are aware that how this all works, can't make big claims here, but you have to read between the lines. Only and only, for your benefit.


To unsubscribe from this group and stop receiving emails from it, send an email to ardee-city-b--block+unsub...@googlegroups.com.
To post to this group, send email to ardee-city-b--block@googlegroups.com.

--
You received this message because you are subscribed to the Google Groups "Ardee City B- Block" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ardee-city-b--block+unsub...@googlegroups.com.
To post to this group, send email to ardee-city-b--block@googlegroups.com.
WhatsApp Image 2018-06-24 at 09.34.33.jpeg
Reply all
Reply to author
Forward
0 new messages