warming-up (2 years): 1992 – 1993
calibration period (6 years): 1994 - 1999
validation period (3 years): 2000-2002
My question is for calibrate and validated the model in SWAT-CUP, SUFI2. The TxtInOut simulated in SWAT should be for the 11 years, and then I just configure the observed files in SUFI2 for the 19994 -1999 for the calibration. Then after get the optimal parameters simulated the best range for the 3 years of validation: 2000 - 2002? That means, that I just run ArcSWAT one time and create just one project in SWAT-CUP.--
You received this message because you are subscribed to the Google Groups "ArcSWAT" group.
To unsubscribe from this group and stop receiving emails from it, send an email to arcswat+u...@googlegroups.com.
To post to this group, send email to arc...@googlegroups.com.
Visit this group at http://groups.google.com/group/arcswat.
For more options, visit https://groups.google.com/d/optout.