USING POTHOLES

14 views
Skip to first unread message

Rym Hadded

unread,
Jul 1, 2025, 2:08:19 PM7/1/25
to ArcSWAT
Dear all, 
I am using potholes to simulate extra recharge by varying pol-K .
I introduced all needed changes for potholes, like POT-FR, POT-TILE, POT-VOLX,POT-K ; in the HRU. file .
 Also for the mgt.2 file I added a line for concerned HRUs (presenting potholes) and I changed the MGT-OP =13 for all concerned HRUs .
Normally I changed all variables attached to potholes, but no changes in the HRUs outputs.
So I changed also the I-POT in the subbasin file by introducing the number of HRU presenting ppotholes , but no changes in the output HRU results.
Could you guide me if there is a missing step or where is the issue?
Thank you
Reply all
Reply to author
Forward
0 new messages