Weekly Tower Approval Summary

This summary highlights approvals still pending tower-wise across all categories.

Status T1T2T3T4T5T6
Approvals Sought 393939393939
Approvals Pending 333429332833
Pending Value (₹) ₹69,31,628₹74,03,748₹61,05,092₹69,31,628₹50,44,494₹69,31,628

T1 – Pending Approvals

Amenities

  • WPS Swimming pool operation & maintenance – ₹10,83,240
  • Water purification services. – ₹5,59,320
  • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
  • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
  • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
  • Tennis Court flooring refurbishment work – ₹0
  • Clubhouse amenities curtains rectification cost (T1 GYM, T4 Library, T5 GYM,T1 Dance Room, T2 Banquet Hall) – ₹29,618
  • Tower 1 GYM cross trainer Programmed PCB replacement, Tower 5 GYM Leg press machine spares replacement cost – ₹48,062
  • Conference room floor carpet tiles replacement cost – ₹21,269
  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

Water & STP

  • Raintal Pump 2 x 10 HP cutter pump & 1 x 5 HP cutter pump for STP disaster management. – ₹51,000
  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
  • Pilot tank Pump automation 34,750/- – ₹34,750
  • ACE hygiene Water purifier AMC Cost with GST 11950/- – ₹12,000
  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
  • Swimming pool media replacement cost 42,500/- – ₹42,500

Electricity Fire Camera & DG

  • DG 'B' check – ₹7,61,104
  • FAPA Maintenance – ₹3,65,000
  • S. V. Technology Inverter for the common area – ₹1,12,100
  • ACL Meptech – ₹1,06,301
  • Vihan Enterprises – ₹64,010
  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
  • Snow tech Exhaust fan & duct installation & sitf Motor rewinding – ₹0
  • MEP tech Ventilation System 96440+ Gst AMC – ₹1,13,799
  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
  • Restaurant Ac Cost 56000/- – ₹56,000
  • Miner repairing at kida play area & swimming pool area Welding & fabrication work – ₹5,000

Structural & All Other

  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
  • BOOM barrier Maintenance – ₹1,27,000

T2 – Pending Approvals

Amenities

  • WPS Swimming pool operation & maintenance – ₹10,83,240
  • Water purification services. – ₹5,59,320
  • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
  • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
  • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
  • Total Project Cost: ₹521,500 – ₹5,21,500
  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
  • Tennis Court flooring refurbishment work – ₹0
  • Clubhouse amenities curtains rectification cost (T1 GYM, T4 Library, T5 GYM,T1 Dance Room, T2 Banquet Hall) – ₹29,618
  • Tower 1 GYM cross trainer Programmed PCB replacement, Tower 5 GYM Leg press machine spares replacement cost – ₹48,062
  • Conference room floor carpet tiles replacement cost – ₹21,269
  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

Water & STP

  • Raintal Pump 2 x 10 HP cutter pump & 1 x 5 HP cutter pump for STP disaster management. – ₹51,000
  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
  • Pilot tank Pump automation 34,750/- – ₹34,750
  • ACE hygiene Water purifier AMC Cost with GST 11950/- – ₹12,000
  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
  • Swimming pool media replacement cost 42,500/- – ₹42,500
  • STP return sludge pipe need to replace cost for replacement – ₹6,620

Electricity Fire Camera & DG

  • DG 'B' check – ₹7,61,104
  • FAPA Maintenance – ₹3,65,000
  • S. V. Technology Inverter for the common area – ₹1,12,100
  • ACL Meptech – ₹1,06,301
  • Vihan Enterprises – ₹64,010
  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
  • Snow tech Exhaust fan & duct installation & sitf Motor rewinding – ₹0
  • MEP tech Ventilation System 96440+ Gst AMC – ₹1,13,799
  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
  • Miner repairing at kida play area & swimming pool area Welding & fabrication work – ₹5,000

Structural & All Other

  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
  • BOOM barrier Maintenance – ₹1,27,000

T3 – Pending Approvals

Amenities

  • WPS Swimming pool operation & maintenance – ₹10,83,240
  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
  • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
  • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
  • Tennis Court flooring refurbishment work – ₹0
  • Clubhouse amenities curtains rectification cost (T1 GYM, T4 Library, T5 GYM,T1 Dance Room, T2 Banquet Hall) – ₹29,618
  • Tower 1 GYM cross trainer Programmed PCB replacement, Tower 5 GYM Leg press machine spares replacement cost – ₹48,062
  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

Water & STP

  • Raintal Pump 2 x 10 HP cutter pump & 1 x 5 HP cutter pump for STP disaster management. – ₹51,000
  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
  • Pilot tank Pump automation 34,750/- – ₹34,750
  • ACE hygiene Water purifier AMC Cost with GST 11950/- – ₹12,000
  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
  • Swimming pool media replacement cost 42,500/- – ₹42,500

Electricity Fire Camera & DG

  • DG 'B' check – ₹7,61,104
  • FAPA Maintenance – ₹3,65,000
  • S. V. Technology Inverter for the common area – ₹1,12,100
  • ACL Meptech – ₹1,06,301
  • Vihan Enterprises – ₹64,010
  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
  • Snow tech Exhaust fan & duct installation & sitf Motor rewinding – ₹0
  • MEP tech Ventilation System 96440+ Gst AMC – ₹1,13,799
  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
  • Restaurant Ac Cost 56000/- – ₹56,000
  • Miner repairing at kida play area & swimming pool area Welding & fabrication work – ₹5,000

Structural & All Other

  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
  • BOOM barrier Maintenance – ₹1,27,000

T4 – Pending Approvals

Amenities

  • WPS Swimming pool operation & maintenance – ₹10,83,240
  • Water purification services. – ₹5,59,320
  • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
  • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
  • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
  • Tennis Court flooring refurbishment work – ₹0
  • Clubhouse amenities curtains rectification cost (T1 GYM, T4 Library, T5 GYM,T1 Dance Room, T2 Banquet Hall) – ₹29,618
  • Tower 1 GYM cross trainer Programmed PCB replacement, Tower 5 GYM Leg press machine spares replacement cost – ₹48,062
  • Conference room floor carpet tiles replacement cost – ₹21,269
  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

Water & STP

  • Raintal Pump 2 x 10 HP cutter pump & 1 x 5 HP cutter pump for STP disaster management. – ₹51,000
  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
  • Pilot tank Pump automation 34,750/- – ₹34,750
  • ACE hygiene Water purifier AMC Cost with GST 11950/- – ₹12,000
  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
  • Swimming pool media replacement cost 42,500/- – ₹42,500

Electricity Fire Camera & DG

  • DG 'B' check – ₹7,61,104
  • FAPA Maintenance – ₹3,65,000
  • S. V. Technology Inverter for the common area – ₹1,12,100
  • ACL Meptech – ₹1,06,301
  • Vihan Enterprises – ₹64,010
  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
  • Snow tech Exhaust fan & duct installation & sitf Motor rewinding – ₹0
  • MEP tech Ventilation System 96440+ Gst AMC – ₹1,13,799
  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
  • Restaurant Ac Cost 56000/- – ₹56,000
  • Miner repairing at kida play area & swimming pool area Welding & fabrication work – ₹5,000

Structural & All Other

  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
  • BOOM barrier Maintenance – ₹1,27,000

T5 – Pending Approvals

Amenities

  • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
  • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
  • Tennis Court flooring refurbishment work – ₹0
  • Clubhouse amenities curtains rectification cost (T1 GYM, T4 Library, T5 GYM,T1 Dance Room, T2 Banquet Hall) – ₹29,618
  • Tower 1 GYM cross trainer Programmed PCB replacement, Tower 5 GYM Leg press machine spares replacement cost – ₹48,062
  • Conference room floor carpet tiles replacement cost – ₹21,269
  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

Water & STP

  • Raintal Pump 2 x 10 HP cutter pump & 1 x 5 HP cutter pump for STP disaster management. – ₹51,000
  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
  • Pilot tank Pump automation 34,750/- – ₹34,750
  • ACE hygiene Water purifier AMC Cost with GST 11950/- – ₹12,000
  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
  • Swimming pool media replacement cost 42,500/- – ₹42,500

Electricity Fire Camera & DG

  • DG 'B' check – ₹7,61,104
  • FAPA Maintenance – ₹3,65,000
  • S. V. Technology Inverter for the common area – ₹1,12,100
  • ACL Meptech – ₹1,06,301
  • Vihan Enterprises – ₹64,010
  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
  • Snow tech Exhaust fan & duct installation & sitf Motor rewinding – ₹0
  • MEP tech Ventilation System 96440+ Gst AMC – ₹1,13,799
  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
  • Restaurant Ac Cost 56000/- – ₹56,000
  • Miner repairing at kida play area & swimming pool area Welding & fabrication work – ₹5,000

Structural & All Other

  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
  • BOOM barrier Maintenance – ₹1,27,000

T6 – Pending Approvals

Amenities

  • WPS Swimming pool operation & maintenance – ₹10,83,240
  • Water purification services. – ₹5,59,320
  • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
  • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
  • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
  • Tennis Court flooring refurbishment work – ₹0
  • Clubhouse amenities curtains rectification cost (T1 GYM, T4 Library, T5 GYM,T1 Dance Room, T2 Banquet Hall) – ₹29,618
  • Tower 1 GYM cross trainer Programmed PCB replacement, Tower 5 GYM Leg press machine spares replacement cost – ₹48,062
  • Conference room floor carpet tiles replacement cost – ₹21,269
  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

Water & STP

  • Raintal Pump 2 x 10 HP cutter pump & 1 x 5 HP cutter pump for STP disaster management. – ₹51,000
  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
  • Pilot tank Pump automation 34,750/- – ₹34,750
  • ACE hygiene Water purifier AMC Cost with GST 11950/- – ₹12,000
  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
  • Swimming pool media replacement cost 42,500/- – ₹42,500

Electricity Fire Camera & DG

  • DG 'B' check – ₹7,61,104
  • FAPA Maintenance – ₹3,65,000
  • S. V. Technology Inverter for the common area – ₹1,12,100
  • ACL Meptech – ₹1,06,301
  • Vihan Enterprises – ₹64,010
  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
  • Snow tech Exhaust fan & duct installation & sitf Motor rewinding – ₹0
  • MEP tech Ventilation System 96440+ Gst AMC – ₹1,13,799
  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
  • Restaurant Ac Cost 56000/- – ₹56,000
  • Miner repairing at kida play area & swimming pool area Welding & fabrication work – ₹5,000

Structural & All Other

  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
  • BOOM barrier Maintenance – ₹1,27,000

������ Click here to view full approval sheet
This is an automated summary email. Please do not reply directly.

secretary.cbtower5@gmail.com

<secretary.cbtower5@gmail.com>
unread,
Sep 8, 2025, 8:55:29 AM9/8/25
to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

Weekly Tower Approval Summary

This summary highlights approvals still pending tower-wise across all categories.

Status T1T2T3T4T5T6
Approvals Sought 393939393939
Approvals Pending 323329332832
Pending Value (₹) ₹69,14,628₹73,86,748₹61,05,092₹69,31,628₹50,44,494₹69,14,628

T1 – Pending Approvals

Amenities

    • WPS Swimming pool operation & maintenance – ₹10,83,240
    • Water purification services. – ₹5,59,320
    • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
    • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
    • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
    • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0

    secretary.cbtower5@gmail.com

    <secretary.cbtower5@gmail.com>
    unread,
    Sep 16, 2025, 9:17:30 AM9/16/25
    to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

    secretary.cbtower5@gmail.com

    <secretary.cbtower5@gmail.com>
    unread,
    Sep 22, 2025, 8:55:29 AM9/22/25
    to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

    secretary.cbtower5@gmail.com

    <secretary.cbtower5@gmail.com>
    unread,
    Sep 29, 2025, 8:55:27 AM9/29/25
    to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

    secretary.cbtower5@gmail.com

    <secretary.cbtower5@gmail.com>
    unread,
    Oct 6, 2025, 8:55:30 AM10/6/25
    to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

    Weekly Tower Approval Summary

    This summary highlights approvals still pending tower-wise across all categories.

    Status T1T2T3T4T5T6
    Approvals Sought 404040404040
    Approvals Pending 222321231924
    Pending Value (₹) ₹82,60,805₹87,26,305₹79,77,038₹86,55,305₹67,85,171₹87,61,606

    T1 – Pending Approvals

    Amenities

      • WPS Swimming pool operation & maintenance – ₹10,83,240
      • Water purification services. – ₹5,59,320
      • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
      • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
      • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
      • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
      • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
      • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
      • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
      • Conference room floor carpet tiles replacement cost – ₹21,269
      • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

        Water & STP

          • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
          • Pilot tank Pump automation 34,750/- – ₹34,750
          • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
          • Swimming pool media replacement cost 42,500/- – ₹42,500

          Electricity Fire Camera & DG

          • Vihan Enterprises – ₹64,010
          • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
          • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
          • Restaurant Ac Cost 56000/- – ₹56,000

            Structural & All Other

              • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
              • BOOM barrier Maintenance – ₹1,27,000
              • All carparking arae treated water & power supply arrangment. – ₹29,33,161

              T2 – Pending Approvals

              Amenities

                • WPS Swimming pool operation & maintenance – ₹10,83,240
                • Water purification services. – ₹5,59,320
                • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
                • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                • Total Project Cost: ₹521,500 – ₹5,21,500
                • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                • Tennis Court flooring refurbishment work – ₹0
                • Conference room floor carpet tiles replacement cost – ₹21,269
                • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                  Water & STP

                    • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                    • Pilot tank Pump automation 34,750/- – ₹34,750
                    • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                    • Swimming pool media replacement cost 42,500/- – ₹42,500

                    Electricity Fire Camera & DG

                    • Vihan Enterprises – ₹64,010
                    • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                    • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616

                      Structural & All Other

                        • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                        • BOOM barrier Maintenance – ₹1,27,000
                        • All carparking arae treated water & power supply arrangment. – ₹29,33,161

                        T3 – Pending Approvals

                        Amenities

                          • WPS Swimming pool operation & maintenance – ₹10,83,240
                          • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                          • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                          • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
                          • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                          • Total Project Cost: ₹521,500 – ₹5,21,500
                          • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                          • Tennis Court flooring refurbishment work – ₹0
                          • Conference room floor carpet tiles replacement cost – ₹21,269
                          • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                            Water & STP

                              • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                              • Pilot tank Pump automation 34,750/- – ₹34,750
                              • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                              • Swimming pool media replacement cost 42,500/- – ₹42,500

                              Electricity Fire Camera & DG

                              • Vihan Enterprises – ₹64,010
                              • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                              • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                              • Restaurant Ac Cost 56000/- – ₹56,000

                                Structural & All Other

                                  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                  • BOOM barrier Maintenance – ₹1,27,000
                                  • All carparking arae treated water & power supply arrangment. – ₹29,33,161

                                  T4 – Pending Approvals

                                  Amenities

                                    • WPS Swimming pool operation & maintenance – ₹10,83,240
                                    • Water purification services. – ₹5,59,320
                                    • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                    • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                    • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                    • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
                                    • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                    • Total Project Cost: ₹521,500 – ₹5,21,500
                                    • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                    • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                    • Tennis Court flooring refurbishment work – ₹0
                                    • Conference room floor carpet tiles replacement cost – ₹21,269
                                    • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                      Water & STP

                                        • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                        • Pilot tank Pump automation 34,750/- – ₹34,750
                                        • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                        • Swimming pool media replacement cost 42,500/- – ₹42,500

                                        Electricity Fire Camera & DG

                                        • Vihan Enterprises – ₹64,010
                                        • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                        • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                        • Restaurant Ac Cost 56000/- – ₹56,000

                                          Structural & All Other

                                            • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                            • All carparking arae treated water & power supply arrangment. – ₹29,33,161

                                            T5 – Pending Approvals

                                            Amenities

                                              • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                              • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                              • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
                                              • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                              • Total Project Cost: ₹521,500 – ₹5,21,500
                                              • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                              • Tennis Court flooring refurbishment work – ₹0
                                              • Conference room floor carpet tiles replacement cost – ₹21,269
                                              • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                Water & STP

                                                  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                  • Pilot tank Pump automation 34,750/- – ₹34,750
                                                  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                  • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                  Electricity Fire Camera & DG

                                                  • Vihan Enterprises – ₹64,010
                                                  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                  • Restaurant Ac Cost 56000/- – ₹56,000

                                                    Structural & All Other

                                                      • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                      • All carparking arae treated water & power supply arrangment. – ₹29,33,161

                                                      T6 – Pending Approvals

                                                      Amenities

                                                        • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                        • Water purification services. – ₹5,59,320
                                                        • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                                        • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                        • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                        • Phase 1: Civil work for both gyms (weight section) along with procurement of additional equipment – ₹9,62,240 Phase 2: Procurement of additional equipment and accessories – ₹1,65,731 Total Project Cost: ₹11,27,971 – ₹0
                                                        • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                                        • Total Project Cost: ₹521,500 – ₹5,21,500
                                                        • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                        • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                        • Tennis Court flooring refurbishment work – ₹0
                                                        • Conference room floor carpet tiles replacement cost – ₹21,269
                                                        • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                          Water & STP

                                                            • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                            • Pilot tank Pump automation 34,750/- – ₹34,750
                                                            • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                            • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                            Electricity Fire Camera & DG

                                                            • ACL Meptech Vendor change to Snowtech. – ₹1,06,301
                                                            • Vihan Enterprises – ₹64,010
                                                            • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                            • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                            • Restaurant Ac Cost 56000/- – ₹56,000

                                                              Structural & All Other

                                                                • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                • All carparking arae treated water & power supply arrangment. – ₹29,33,161

                                                                secretary.cbtower5@gmail.com

                                                                <secretary.cbtower5@gmail.com>
                                                                unread,
                                                                Oct 13, 2025, 8:55:27 AM10/13/25
                                                                to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                secretary.cbtower5@gmail.com

                                                                <secretary.cbtower5@gmail.com>
                                                                unread,
                                                                Oct 20, 2025, 8:55:29 AM10/20/25
                                                                to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                Weekly Tower Approval Summary

                                                                This summary highlights approvals still pending tower-wise across all categories.

                                                                Status T1T2T3T4T5T6
                                                                Approvals Sought 424242424242
                                                                Approvals Pending 222222241625
                                                                Pending Value (₹) ₹83,28,805₹58,61,144₹81,72,038₹88,50,305₹56,07,331₹89,56,606

                                                                T1 – Pending Approvals

                                                                Amenities

                                                                  • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                  • Water purification services. – ₹5,59,320
                                                                  • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                                                  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                  • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                                                  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                  • Conference room floor carpet tiles replacement cost – ₹21,269
                                                                  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                                  Water & STP

                                                                  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                  • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                  • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                  Electricity Fire Camera & DG

                                                                  • Vihan Enterprises – ₹64,010
                                                                  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                  • Restaurant Ac Cost 56000/- – ₹56,000
                                                                  • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                  Structural & All Other

                                                                    • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                    • All carparking arae treated water & power supply arrangment. – ₹29,33,161
                                                                    • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                    T2 – Pending Approvals

                                                                    Amenities

                                                                      • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                      • Water purification services. – ₹5,59,320
                                                                      • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                                                      • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                      • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                      • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                                                      • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                      • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                      • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                      • Tennis Court flooring refurbishment work – ₹0
                                                                      • Conference room floor carpet tiles replacement cost – ₹21,269
                                                                      • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                                      Water & STP

                                                                      • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                      • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                      • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                      • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                      Electricity Fire Camera & DG

                                                                      • Vihan Enterprises – ₹64,010
                                                                      • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                      • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                      • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                      Structural & All Other

                                                                        • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                        • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                        T3 – Pending Approvals

                                                                        Amenities

                                                                          • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                          • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                          • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                          • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                                                          • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                          • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                          • Tennis Court flooring refurbishment work – ₹0
                                                                          • Conference room floor carpet tiles replacement cost – ₹21,269
                                                                          • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                                          Water & STP

                                                                          • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                          • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                          • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                          • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                          Electricity Fire Camera & DG

                                                                          • Vihan Enterprises – ₹64,010
                                                                          • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                          • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                          • Restaurant Ac Cost 56000/- – ₹56,000
                                                                          • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                          Structural & All Other

                                                                            • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                            • BOOM barrier Maintenance – ₹1,27,000
                                                                            • All carparking arae treated water & power supply arrangment. – ₹29,33,161
                                                                            • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                            T4 – Pending Approvals

                                                                            Amenities

                                                                              • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                              • Water purification services. – ₹5,59,320
                                                                              • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                                                              • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                              • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                              • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                                                              • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                              • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                              • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                              • Tennis Court flooring refurbishment work – ₹0
                                                                              • Conference room floor carpet tiles replacement cost – ₹21,269
                                                                              • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                                              Water & STP

                                                                              • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                              • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                              • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                              • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                              Electricity Fire Camera & DG

                                                                              • Vihan Enterprises – ₹64,010
                                                                              • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                              • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                              • Restaurant Ac Cost 56000/- – ₹56,000
                                                                              • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                              Structural & All Other

                                                                                • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                • All carparking arae treated water & power supply arrangment. – ₹29,33,161
                                                                                • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                T5 – Pending Approvals

                                                                                Amenities

                                                                                  • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                                                                  • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                                                                  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                  • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                                                  Water & STP

                                                                                  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                  • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                  • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                  Electricity Fire Camera & DG

                                                                                  • Vihan Enterprises – ₹64,010
                                                                                  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                  • Restaurant Ac Cost 56000/- – ₹56,000
                                                                                  • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                  Structural & All Other

                                                                                    • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                    • All carparking arae treated water & power supply arrangment. – ₹29,33,161
                                                                                    • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                    T6 – Pending Approvals

                                                                                    Amenities

                                                                                      • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                      • Water purification services. – ₹5,59,320
                                                                                      • Jacuzzi hot water provision 1,21,953/- – ₹1,21,953
                                                                                      • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                      • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                      • Sliding Aluminiun Door 54 x 74 " partition dooe Total cost is 17000/- including fixing on site. – ₹17,000
                                                                                      • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                                      • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                                      • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                      • Tennis Court flooring refurbishment work – ₹0
                                                                                      • Conference room floor carpet tiles replacement cost – ₹21,269
                                                                                      • WPS Jacuzzi & Steam Room Operation AMC Cost – ₹5,59,320

                                                                                      Water & STP

                                                                                      • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                      • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                      • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                      • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                      Electricity Fire Camera & DG

                                                                                      • ACL Meptech Vendor change to Snowtech. – ₹1,06,301
                                                                                      • Vihan Enterprises – ₹64,010
                                                                                      • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                      • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                      • Restaurant Ac Cost 56000/- – ₹56,000
                                                                                      • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                      Structural & All Other

                                                                                        • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                        • All carparking arae treated water & power supply arrangment. – ₹29,33,161
                                                                                        • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                        secretary.cbtower5@gmail.com

                                                                                        <secretary.cbtower5@gmail.com>
                                                                                        unread,
                                                                                        Oct 27, 2025, 8:55:26 AM10/27/25
                                                                                        to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                        Weekly Tower Approval Summary

                                                                                        This summary highlights approvals still pending tower-wise across all categories.

                                                                                        Status T1T2T3T4T5T6
                                                                                        Approvals Sought 363636363636
                                                                                        Approvals Pending 161818181119
                                                                                        Pending Value (₹) ₹40,82,051₹46,03,551₹46,06,557₹46,03,551₹19,19,897₹47,09,852

                                                                                        T1 – Pending Approvals

                                                                                        Amenities

                                                                                          • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                          • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                          • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                          • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                                          • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                          • Conference room floor carpet tiles replacement cost – ₹21,269

                                                                                          Water & STP

                                                                                          • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                          • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                          • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                          • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                          Electricity Fire Camera & DG

                                                                                          • Vihan Enterprises – ₹64,010
                                                                                          • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                          • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                          • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                          Structural & All Other

                                                                                          • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                          • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                          T2 – Pending Approvals

                                                                                          Amenities

                                                                                            • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                            • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                            • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                            • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                                            • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                                            • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                            • Tennis Court flooring refurbishment work – ₹0
                                                                                            • Conference room floor carpet tiles replacement cost – ₹21,269

                                                                                            Water & STP

                                                                                            • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                            • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                            • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                            • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                            Electricity Fire Camera & DG

                                                                                            • Vihan Enterprises – ₹64,010
                                                                                            • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                            • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                            • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                            Structural & All Other

                                                                                            • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                            • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                            T3 – Pending Approvals

                                                                                            Amenities

                                                                                            • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                            • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                            • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                            • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                                            • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                            • Tennis Court flooring refurbishment work – ₹0
                                                                                            • Conference room floor carpet tiles replacement cost – ₹21,269

                                                                                            Water & STP

                                                                                            • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                            • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                            • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                            • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                            Electricity Fire Camera & DG

                                                                                            • Vihan Enterprises – ₹64,010
                                                                                            • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                            • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                            • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                            Structural & All Other

                                                                                            • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                            • BOOM barrier Maintenance – ₹1,27,000
                                                                                            • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                              T4 – Pending Approvals

                                                                                              Amenities

                                                                                                • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                                • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                                • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                                • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                                                • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                                                • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                                • Tennis Court flooring refurbishment work – ₹0
                                                                                                • Conference room floor carpet tiles replacement cost – ₹21,269

                                                                                                Water & STP

                                                                                                • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                                • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                                • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                                • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                                Electricity Fire Camera & DG

                                                                                                • Vihan Enterprises – ₹64,010
                                                                                                • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                                • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                                • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                                Structural & All Other

                                                                                                • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                                • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                                T5 – Pending Approvals

                                                                                                Amenities

                                                                                                • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040

                                                                                                Water & STP

                                                                                                • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                                • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                                • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                                • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                                Electricity Fire Camera & DG

                                                                                                • Vihan Enterprises – ₹64,010
                                                                                                • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                                • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                                • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                                Structural & All Other

                                                                                                • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                                • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                                T6 – Pending Approvals

                                                                                                Amenities

                                                                                                  • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                                  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                                  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                                  • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                                                  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                                                  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                                  • Tennis Court flooring refurbishment work – ₹0
                                                                                                  • Conference room floor carpet tiles replacement cost – ₹21,269

                                                                                                  Water & STP

                                                                                                  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                                  • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                                  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                                  • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                                  Electricity Fire Camera & DG

                                                                                                  • ACL Meptech Vendor change to Snowtech. – ₹1,06,301
                                                                                                  • Vihan Enterprises – ₹64,010
                                                                                                  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                                  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                                  • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                                  Structural & All Other

                                                                                                  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                                  • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Nov 3, 2025, 7:55:30 AM11/3/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Nov 10, 2025, 7:55:28 AM11/10/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Nov 17, 2025, 7:55:30 AM11/17/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Nov 24, 2025, 7:55:27 AM11/24/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  Weekly Tower Approval Summary

                                                                                                  This summary highlights approvals still pending tower-wise across all categories.

                                                                                                  Status T1T2T3T4T5T6
                                                                                                  Approvals Sought 363636363636
                                                                                                  Approvals Pending 151817171118
                                                                                                  Pending Value (₹) ₹40,60,782₹46,03,551₹45,85,288₹45,82,282₹19,19,897₹46,88,583

                                                                                                  T1 – Pending Approvals

                                                                                                  Amenities

                                                                                                  • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                                  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                                  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                                  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                                                  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040

                                                                                                  Water & STP

                                                                                                  • Cutter pump cost L1- cost 1,80,340 /- SK enterprises – ₹1,80,340
                                                                                                  • Pilot tank Pump automation 34,750/- – ₹34,750
                                                                                                  • Vihan Enterprises PUMP & motor Repairing Cost 23,300 + 40710/- – ₹64,010
                                                                                                  • Swimming pool media replacement cost 42,500/- – ₹42,500

                                                                                                  Electricity Fire Camera & DG

                                                                                                  • Vihan Enterprises – ₹64,010
                                                                                                  • Fire fighting System Spares required for Emergency purpose – ₹2,27,415
                                                                                                  • AM level 120 nos. lights & 21st floor & AM level lights – ₹1,07,616
                                                                                                  • All bypass Breakers at comman area to be replace – ₹1,50,000

                                                                                                  Structural & All Other

                                                                                                  • OWC maintenance AMC operation & maintenance with chemical 1 operator 3 no. Helper. – ₹9,57,216
                                                                                                  • BOOM barrier Maintenance – ₹1,27,000
                                                                                                  • Driver wash room T2 /P4 level 5 no. Doors to replace – ₹45,000

                                                                                                  T4 – Pending Approvals

                                                                                                  Amenities

                                                                                                  • WPS Swimming pool operation & maintenance – ₹10,83,240
                                                                                                  • Sky street Chair & tables Cost 8,30071/- – ₹8,30,071
                                                                                                  • Trophy cabinet near clubhouse reception option 1 - 103580 – ₹1,03,580
                                                                                                  • Total Project Cost: ₹521,500 – ₹5,21,500
                                                                                                  • Squash court wooden floor refurbishment sanding & polishing – ₹1,23,994
                                                                                                  • curtains towards Kids play area in Badminton court 2 fabric replacement request from regular players. – ₹47,040
                                                                                                  • Tennis Court flooring refurbishment work – ₹0

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Dec 1, 2025, 7:55:26 AM12/1/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Dec 8, 2025, 7:55:27 AM12/8/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Dec 15, 2025, 7:55:27 AM12/15/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Dec 22, 2025, 7:55:29 AM12/22/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Dec 29, 2025, 7:55:27 AM12/29/25
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Jan 5, 2026, 7:55:27 AMJan 5
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Jan 12, 2026, 7:55:28 AMJan 12
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Jan 19, 2026, 7:55:28 AMJan 19
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Jan 26, 2026, 7:55:26 AMJan 26
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Feb 2, 2026, 7:55:30 AMFeb 2
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Feb 9, 2026, 7:55:27 AMFeb 9
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Feb 16, 2026, 7:55:28 AMFeb 16
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Feb 23, 2026, 7:55:25 AMFeb 23
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Mar 2, 2026, 7:55:28 AMMar 2
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Mar 9, 2026, 8:55:32 AMMar 9
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Mar 16, 2026, 8:55:29 AMMar 16
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Mar 23, 2026, 8:55:31 AMMar 23
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Mar 30, 2026, 8:55:30 AMMar 30
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  Secretary T5 Crescent Bay

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Mar 30, 2026, 4:20:01 PMMar 30
                                                                                                  to CB Apex Committee, PM.CrescentBayIN, Apex Sports
                                                                                                  Despite sincere efforts, the approvals sheet does not tend to have adoption and I will stop it so it does not spam our inboxes. 

                                                                                                  Jaineel Aga
                                                                                                  Hon. Secretary, T-5

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Apr 6, 2026, 8:55:26 AMApr 6
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Apr 13, 2026, 8:55:28 AMApr 13
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Apr 20, 2026, 8:55:28 AMApr 20
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  Secretary T5 Crescent Bay

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Apr 20, 2026, 9:02:08 AMApr 20
                                                                                                  to CB Apex Committee, PM.CrescentBayIN, Apex Sports
                                                                                                  Hi Chandrakant

                                                                                                  This tool was created for keeping everyone in the loop including various subcommittees to know where any approvals are pending. 

                                                                                                  However, its utility will only be realized if its used correctly. 

                                                                                                  If this is not to be adopted, please let me know and we can discontinue it. If it is useful, then please use it correctly so that it is effective and not ignored. 

                                                                                                  Leave the option to you but if not useful, please let me know so we can avoid redundant emails to Apex / APSC


                                                                                                  Hon. Secretary, T-5

                                                                                                  secretary.cbtower5@gmail.com

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Apr 27, 2026, 8:55:28 AMApr 27
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com

                                                                                                  Secretary T5 Crescent Bay

                                                                                                  <secretary.cbtower5@gmail.com>
                                                                                                  unread,
                                                                                                  Apr 27, 2026, 1:49:35 PMApr 27
                                                                                                  to cbapex@googlegroups.com, PM.CrescentBayIN@ap.jll.com, apex-sports@googlegroups.com
                                                                                                  I will be stopping this script, given this process does not have adoption by all stakeholders.

                                                                                                  We are still not truly ready for a "transparent', technology enabled system. Since these scripts use computational bandwidth, I will be stopping it. 

                                                                                                  If and when we are ready for this in the future, I can always restart it.

                                                                                                  Regards
                                                                                                   
                                                                                                  JAINEEL AGA
                                                                                                  Hon. Secretary
                                                                                                  T-5, Crescent Bay

                                                                                                  Reply all