i have received the next demand letter from Ajnara. Iam in Tower-F. Any body else has received this??
 
 
Regards
 
Shafat
F-202
On Tue, 23 Nov 2010 16:28:42 +0530 "Anjna Nair" ajn...@ajnara.com wrote

Dear Sir

We are happy to announce that for your tower foundation is been completed.

Kindly pay your demand by 30.11.2010

Regards

Anjana Nair

Amit

unread,
Nov 24, 2010, 1:22:18 AM11/24/10
to Ajnara_Daffodil_137
Hi Shafat,

Congrats (for the good progress on your tower).
Is this the third demand?

Thanks,
AC

shafat khan

unread,
Nov 24, 2010, 3:15:43 AM11/24/10
to ajnara_da...@googlegroups.com
Thanks Amit,
This is after 3rd one after payment of 30% portion.
 
Regards
Shafat

Navin

unread,
Nov 24, 2010, 11:24:39 AM11/24/10
to Ajnara_Daffodil_137
Hi Shafat,

Even i have received the same via email today.Two weeks back i spoke
to one of the executive from Ajanara and i was informed that i will
get the same not before Jan howevere i received the demand letter
today. and it says that i have to make the payment on or before
30/11.My Flat is in tower H.
> > > + 91 9582801825- Hide quoted text -
>
> - Show quoted text -

Dheeraj Anand

unread,
Nov 24, 2010, 11:40:32 AM11/24/10
to Ajnara_Daffodil_137
I am in F-704. I haven't received the request as yet.

Earlier they were used to call people. Looks like they are sending
mails only and that too with a short notice. Reason might be, you have
not taken the loans and are self financing.

On Nov 24, 9:08 am, shafat khan <shafat...@gmail.com> wrote:

shafat khan

unread,
Nov 24, 2010, 11:32:03 PM11/24/10
to ajnara_da...@googlegroups.com
Also every comminication, officers changed . Fast turnover, hope it will be fast deliverables also.
 
Request if anybody can visit and post some fresh fotos)---
 
Foundation is ready, lets see at what pace they will finish the final construction.
 
Regards & Have a nice day ahead.
 
Shafat

shafat khan

unread,
Nov 24, 2010, 11:33:22 PM11/24/10
to ajnara_da...@googlegroups.com
Hi Navin,
 
important thing is to visit & confirm about the construction done. Nevertheless still they are not sending too many reminders like Jaypee & others
 
Regards
Shafat

Amit

unread,
Nov 25, 2010, 12:04:00 AM11/25/10
to Ajnara_Daffodil_137
Email is not termed as an official communication.
They have to send a letter via mail/courier to inform you about the
same.
Has anyone received the same.
Also are they giving just a week's time to arrange for the payment? I
think it should be 15 days though I have found them to be a bit
flexible regarding this.

Thanks,
AC
> > > - Show quoted text -- Hide quoted text -

sukhbir

unread,
Nov 25, 2010, 2:37:34 AM11/25/10
to Ajnara_Daffodil_137
Hi All,

Just talked with Jyoti (Ajnara staff) regarding next demand letter.
As per her, Demand letter of 10% (after 30%) has already been
dispatched.

My flat is 903 in F- block.

Regards,
Sukhbir Singh

Dheeraj Anand

unread,
Nov 25, 2010, 2:46:26 AM11/25/10
to Ajnara_Daffodil_137
I also talked to Jyoti, today morning and she said same to me.

Dheeraj

Rakesh Vawani

unread,
Nov 25, 2010, 9:26:12 AM11/25/10
to Ajnara_Daffodil_137
Even I have also recieved the demand letter.It says I have to pay the
next instalment by 30th Nov .I am in Tower F.

Has anybody been to the site over this weekend.

Regards
Rakesh Vaswani

On Nov 24, 9:08 am, shafat khan <shafat...@gmail.com> wrote:

Deepak

unread,
Nov 25, 2010, 11:56:18 AM11/25/10
to Ajnara_Daffodil_137
I also received a call from Jyoti about the 3rd 10% payment due.
As per her, Foundation is complete for tower D,E,F,G,H and they have
sent demand letters for them.

-Deepak

Kapil

unread,
Nov 25, 2010, 1:38:35 PM11/25/10
to Ajnara_Daffodil_137
Hi

I visited the site........ and construction is going in good flow for
phase 1 and foundation was near completion for phase 1 towers...... I
dont remember it tower wise for phase 1 since mine is in phase 2....

Thanks,
Kapil Madaan

Alke

unread,
Nov 26, 2010, 12:49:26 AM11/26/10
to Ajnara_Daffodil_137
hi kapil,
what is the status about phase 2? mine is phase 2, block-I
> > - Show quoted text -- Hide quoted text -

Tabish Akhlaq

unread,
Nov 26, 2010, 8:39:09 AM11/26/10
to ajnara_da...@googlegroups.com
Dear E-Neighbours!

I too am in receipt of the demand letter for Tower E. The letter has been received via email and stipulates that I should submit the next installment by 30/11/2010.
Pretty short notice period for the amount that I need to mobilize. Isn't the builder suppose to provide some sort of completion certificate to evidence the completion of foundation?
I am planning to ask for extension to the submission date till 15/12/2010, anyone else for the extension or is everyone else cash rich :-)

Regards,

Tabish

Dheeraj Anand

unread,
Nov 26, 2010, 9:59:52 AM11/26/10
to Ajnara_Daffodil_137
I also got the letter today. I scanned it and sent to bank (HDFC,
Bangalore). As per branch manager, they are going to do a technical
check before disbursing the amount. So bank is going to do it for me.
But definetly it can't be done with in November 30.

Thanks,
Dheeraj

Dheeraj Anand

unread,
Nov 26, 2010, 10:23:48 AM11/26/10
to Ajnara_Daffodil_137
Also, still there is no mention of service tax and they are asking
what is written in allotment letter, nothing extra.

Thanks,
Dheeraj
Message has been deleted

Navin

unread,
Nov 27, 2010, 7:02:44 AM11/27/10
to Ajnara_Daffodil_137
Hi All,

I have received courier today and along with demand letter i have
received a new cost sheet which includes some service tax as well due
to which cost of Flat has incresed by approximitly 1.10 Lakhs, are we
suppose to borne this service tax , This is something which we have to
pay extra apart from the cost at which we finalized out flats, did any
one else received
this new cost sheet ( including service Tax) along with demand
letter.


Also , is there a way we can verify the construction status , I stay
in Pune so i cannot do the same.

In regard to payment due date , i justed wanted to confirm is there
any penalty which Ajnara can impose on us if we fail to make payment
by 30th Nov,I am not sure how can they give such a short notice for
payment to be made. I will submbit this demand letter in bank on
Monday , let's see what bank has to say on this and when can they
disburse payment.


Regards
Navin

sanjeev chopra

unread,
Nov 27, 2010, 8:21:54 AM11/27/10
to ajnara_da...@googlegroups.com
Hi All,
 
I'm in F-bock and got the demand letter on 25th nov. Spoke to Ajnara and got the date extended by a couple of days.
 
So, dont be worried about short notice, you can always ask them to extend the date. As this is their fault, they seem to be pretty ok doing it.
 
Regards,
samy

Navin

unread,
Nov 27, 2010, 8:40:21 AM11/27/10
to Ajnara_Daffodil_137
Hi Sanjeev,

Did u receive new cost sheet with service tax added.

Regards
Navin

sanjeev chopra

unread,
Nov 27, 2010, 7:21:23 PM11/27/10
to ajnara_da...@googlegroups.com
It's acc. to the original agreement, no changes.
--

Sanjeev Chopra
Batch of 2007  FMS,Delhi
Batch of 2004  NSIT,Delhi

Amit

unread,
Nov 27, 2010, 10:28:11 PM11/27/10
to Ajnara_Daffodil_137
Hi Guys,

Don't know why but this seems to be making me confused.
According to above posts, Tabish, Navin, Dheeraj and Sanjiv have got
the letter.
While Tabish has the flat in E-tower, Sanjeev has it in F-tower. Navin
& Dheeraj can you please confirm your towers.
Also, only Navin seems to have got the revised cost sheet. Can any one
else confirm getting a new cost sheet?

Lets try to understand how the letters are being sent and why some
members are getting demands based on old cost-sheets and others
getting a new one.

Sanjiv,

Also can you confirm that the demand you received includes the service
tax?

Thanks,
AC

Navin

unread,
Nov 28, 2010, 1:44:04 AM11/28/10
to Ajnara_Daffodil_137
Hi Amit,

I have my flat in Tower H.

It seems only I have received new revised cost sheet with service tax
added.They have asked a signed copy of same to be sent back to them
for their record.

Not sure what to do on this and why only I got this new cost sheet.I
will talk to them tomorrow on this and see what they have to say on
this.

Dheeraj Anand

unread,
Nov 28, 2010, 2:20:24 AM11/28/10
to Ajnara_Daffodil_137
I am in tower F.

Naveen, you got next demand based on old cost sheet or new cost sheet?
You only specified that you got new cost sheet but didn't mention if
third demand is as per new cost sheet you got. I believe as you have
not signed the new cost sheet, you current demand will be based on old
cost sheet. Please check and confirm.

Thanks,
Dheeraj

On Nov 28, 8:28 am, Amit <achop...@gmail.com> wrote:

Devendra Sharma

unread,
Nov 28, 2010, 5:07:21 AM11/28/10
to ajnara_da...@googlegroups.com
Hi,
 
I am having flat in Tower, I received the demand letter via courrier. As per demand letter Ajnara has asked to pay as per old payment + Service Tax as applicable, but there is no new cost sheet or Service tax amount is mentioned in demand letter.
Do I need to submit this demand letter to HDFC and they will varify the construction status before disbursement?
 
Appreciteany.... suggestion how to proceed further
 
Thanks 
Dev  

Kapil

unread,
Nov 29, 2010, 1:34:06 AM11/29/10
to Ajnara_Daffodil_137
Hi Alke,

As per the site engineer over there, next demand for phase-2 should be
after around 3 months....... Mine is also Tower-I so, it should be the
same time when we will get the letter.

Thanks,
Kapil Madaan

Deepak

unread,
Nov 29, 2010, 1:54:55 AM11/29/10
to Ajnara_Daffodil_137
Hi,
Well, I've flat in tower H and my allotment letter already includes
service
tax.

Just a word of caution: In the demand letter, Ajanara had asked Rupees
one
lac more than what was mentioned in the allotment letter.
I supposed that was a mistake and I called Ajanara to rectify
that.They'll
be sending me new demand letter. So just check your demand letter
carefully.

Thanks,
Deepak

On Nov 28, 3:07 pm, Devendra Sharma <devsha...@gmail.com> wrote:
> Hi,
>
> I am having flat in Tower, I received the demand letter via courrier. As per
> demand letter Ajnara has asked to pay as per old payment + Service Tax as
> applicable, but there is no new cost sheet or Service tax amount is
> mentioned in demand letter.
> Do I need to submit this demand letter to HDFC and they will varify the
> construction status before disbursement?
>
> Appreciteany.... suggestion how to proceed further
>
> Thanks
> Dev
>

amit das

unread,
Nov 29, 2010, 11:10:24 PM11/29/10
to ajnara_da...@googlegroups.com
Hello Everyone,
 
I hope those having flats in Tower A,B,C or D have not yet received their next demand letter yet.
 
I expect the same in Dec.'10 or may be Jan.'11 for Tower A.
 
As informed in my last Construction status update (8th Nov.'10) there will be a gap of approx. 2 months between Progress of Tower H & Tower A.
 
Those in Tower H & G, for your information, the basement slab work is in progress (as evident from Pankaj's photo dated 21.11.10). So, you can expect your next demand letter very soon (probably Jan.'11). Others can expect the same by Feb.'11 to Mar.'11 progressively.
 
Best Regards,
 
Amit K Das
C-501

Dheeraj Anand

unread,
Nov 30, 2010, 12:07:54 AM11/30/10
to Ajnara_Daffodil_137
For me, bank has disbursed the amout for third installment after
tehnically clearing the construction stage. I am in tower F.

If construction stage is not technically cleared, banks will not
disburse the full amount of the installment and will only disburse
part amount for that very installment.
> > > > > AC- Hide quoted text -

chirag bhargava

unread,
Nov 30, 2010, 3:13:45 AM11/30/10
to ajnara_da...@googlegroups.com
Hello,
 
My Flat is in tower D.
I have also received the letter for next installment
 
 
 
 
Chirag Bhargava
D - 1001

nav

unread,
Dec 12, 2010, 1:58:35 AM12/12/10
to Ajnara_Daffodil_137
Dear All,

I have flat in tower H, H-706. I do get 3rd demand letter with revised
prices included service tax.
I talked to Ajnara (Jyoti) as per her we can deposit 3rd installment
by 20th Dec.
Also visited their site, basement slab has not beed constructed yet on
which 3rd demand is due, site engineers says target date to cast
basement slab is 22nd Dec for tower H, followed by other towers.

So we should let bank varify and disburse the installment accordingly,
pls keep everyone posted who has bank finance as mine is not through
bank.

Also service tax letter has to be sent to everyone later or sooner. So
pls be prepared to fight against it or accept to pay.

Regards
Navneet
9818896673
Tower H
Flat-H-706

On Nov 28, 3:07 pm, Devendra Sharma <devsha...@gmail.com> wrote:
> Hi,
>
> I am having flat in Tower, I received the demand letter via courrier. As per
> demand letter Ajnara has asked to pay as per old payment + Service Tax as
> applicable, but there is no new cost sheet or Service tax amount is
> mentioned in demand letter.
> Do I need to submit this demand letter to HDFC and they will varify the
> construction status before disbursement?
>
> Appreciteany.... suggestion how to proceed further
>
> Thanks
> Dev
>
> > > AC- Hide quoted text -

Navin

unread,
Dec 12, 2010, 4:01:21 AM12/12/10
to Ajnara_Daffodil_137
At last some one else other than me has received new resvised cost
sheet with Service tax added.

I called up and told Jyoti that i will not send back the signed copy
of revised cost till the time every one receives the same :) because
message from every one else in this forum made me believe that i am
the only one who has received new cost sheet.

Sooner or later everyone would be receiving the same that is what
Jyoti ( from Ajnara) informed me.

Guys any thought whether we should talk to Ajnara on this or accept
new cost sheet.Also is there anything else which can be done in this
reagrd.

Regards
Navin
> > - Show quoted text -- Hide quoted text -

nav

unread,
Dec 19, 2010, 4:52:47 AM12/19/10
to Ajnara_Daffodil_137
Dear All,

Pls leave your contact no while quoting. Also update memeber file.

Regrds
navneet
H-706
9818896673

Ranjeet

unread,
Jan 1, 2011, 9:54:31 PM1/1/11
to Ajnara_Daffodil_137
Hello All,

Happy New Year 2011.
Just wanted to check has anyone received 3rd demand letter for tower
B?

Thanks,
Ranjeet

Bipin Tiwari

unread,
Jan 1, 2011, 11:23:25 PM1/1/11
to ajnara_da...@googlegroups.com
HI

Have you got Third Demand Letter for tower B?

On what basis they are releasing the demand letter. If it is CLP than
demand should be linked with construction.

Please check with Ajnara whether demand is in line with construction status.

Best Regards
Bipin Tiwari

alok yadav

unread,
Jan 3, 2011, 12:22:04 AM1/3/11
to Ajnara_Daffodil_137
i am in otwer B and i have not recvd demand letter.


On Jan 2, 9:23 am, Bipin Tiwari <bipintiwar...@gmail.com> wrote:
> HI
>
> Have you got Third Demand Letter for tower B?
>
> On what basis they are releasing the demand letter. If it  is CLP than
> demand should be linked with construction.
>
> Please check with Ajnara whether demand is in line with construction status.
>
> Best Regards
> Bipin Tiwari
>

Amit

unread,
Jan 4, 2011, 4:10:15 AM1/4/11
to Ajnara_Daffodil_137
Hi Folks,

I am owner of Flat in Tower B.
Got demand letter for third demand.
The demand was mentioned as the amount plus service tax. The Amount
figure was present and not the service tax figure.
Dont know if anyone else received such demand and how much did the
bank disburse.

Thanks,
AC

alok yadav

unread,
Jan 4, 2011, 9:56:32 AM1/4/11
to Ajnara_Daffodil_137
i also got the call from ajnara today regarding demand and informed me
that they have send the demand letter to me.

Dheeraj Anand

unread,
Jan 4, 2011, 1:23:05 PM1/4/11
to Ajnara_Daffodil_137
I am in tower F and already paid 3rd demand. Also, in demand letter,
there was no mention of service tax as I have financed this property
through bank. As per Ajnara, we need to pay the service tax amount and
in their accounts, we are shown as 'creditors' :).

Dheeraj Anand
F-704

amit das

unread,
Jan 4, 2011, 11:23:10 PM1/4/11
to ajnara_da...@googlegroups.com
Hi !
 
Same case for me too AC ! Received yesterday, amount mentioned plus service tax as applicable. Don't know how much bank will disburse.
 
Regards,
 
Amit K Das

shafat khan

unread,
Jan 4, 2011, 11:57:22 PM1/4/11
to ajnara_da...@googlegroups.com
Dear All,
bank will disbursed full ,mentioned in Demand letter. I have  already paid this at the end of Nov 2010.
 
Regards
Shafat
F-202

Dheeraj Anand

unread,
Jan 5, 2011, 7:49:15 AM1/5/11
to Ajnara_Daffodil_137
First of all, bank will disburse the amount as mentioned in various
stages of allotment letter. The amount that is mentioned in allotment
letter (which is now with bank) stage 3 is without service tax so
demand letter will also be without service tax. So, example, if amount
for stage 3 is 1,00,000 in both allotment letter and demand letter,
bank will give only 1,00,000. Ajnara will treat as 1,00,000 - 2.757%,
means 97,243 and in there ledger they will show us creaditors as we
still need to pay them Rs. 2757/-. I confirmed this with Jyoti.

The receipt that you will get from Ajnara will also mention that above
1,00,000 includes service tax but in fact we still need to pay Ajnara
Rs. 2757/-.

Dheeraj
F-704

On Jan 5, 9:57 am, shafat khan <shafat...@gmail.com> wrote:
> Dear All,
> bank will disbursed full ,mentioned in Demand letter. I have  already paid
> this at the end of Nov 2010.
>
> Regards
> Shafat
> F-202
>
>
>
> On Wed, Jan 5, 2011 at 8:23 AM, amit das <amitandy...@gmail.com> wrote:
> > Hi !
>
> > Same case for me too AC ! Received yesterday, amount mentioned plus service
> > tax as applicable. Don't know how much bank will disburse.
>
> > Regards,
>
> > Amit K Das
>

Amit

unread,
Jan 5, 2011, 8:03:22 AM1/5/11
to Ajnara_Daffodil_137
Thanks and again its...Confusion, Confusion, Confusion!!!

1. Who is going to pay the rest of the amount of Service Tax (2757 in
above example)?
2. If they keep on putting us as creditors, what are the consequences
of the same?
3. If at all we have to pay the Service Tax, why are they not sending
the revised Cost Sheet?

As I understand, everyone is having a different story to tell. Some
people have received revised offer sheets, some have received old
demands, some have received new....Why are they not keeping everyone
on same page.

I am opening a seperate thread to understand what all different type
of demands and offer sheets we folks have received and then to take
this up with Ajnara.
Moreover, I am planning to go to their office on 15th Jan. Anyone
interested, reply or drop a mail and lets meet.

Thanks,
AC

Ranjoy Guha

unread,
Jan 6, 2011, 3:03:43 AM1/6/11
to ajnara_da...@googlegroups.com
Hi All,
 
Received my Demand Letter yesterday. The total amount is 2.67 lacs, to be paid by 15th January. The timeframe is pretty small.
 
Also does anybody know if bank will disburse the full amount. Mine is from IDBI Bank. If not then what will happen if I pay by 31st Jan.
 
Regards,
 
Ranjoy Guha
9999203080
Tower - B, Flat - 1401

Ranjeet

unread,
Jan 7, 2011, 10:48:59 PM1/7/11
to Ajnara_Daffodil_137
I've also received the demand letter for Tower B.
Can anybody tell me the status of Tower B?

Thanks,
Ranjeet

On Jan 6, 3:03 am, Ranjoy Guha <emailran...@gmail.com> wrote:
> Hi All,
>
> Received my Demand Letter yesterday. The total amount is 2.67 lacs, to be
> paid by 15th January. The timeframe is pretty small.
>
> Also does anybody know if bank will disburse the full amount. Mine is
> from IDBI Bank. If not then what will happen if I pay by 31st Jan.
>
> Regards,
>
> Ranjoy Guha
> 9999203080
> Tower - B, Flat - 1401
>
Message has been deleted

Navin

unread,
Jan 8, 2011, 1:03:01 PM1/8/11
to Ajnara_Daffodil_137
Hi,

Ajnara will never include serive tax in any of the demand letter
untill we send them back the singed copy of revised cost sheet.
Also Bank will Disburse only amount whis is already sanctioned and
not
as per revised cost sheet received from Ajnara with service tax
added.This means we will have to pay service tax from our own side.I
am not sure what will be the Consequence if we donot pay Instalment
as per revised cost sheet.
Can some one share more information around this.

Regards
Navin

GAURAV BHARDWAJ

unread,
Jan 9, 2011, 12:46:40 AM1/9/11
to ajnara_da...@googlegroups.com
Dear All,
I also got 3rd demand letter and last date is 15th Jan,so i have decided to take loan from Corporation Bank.
Plz. let me know if anuone take loanfrom corporation Bank and What is the Rate of Interest with all terms?
 
regards
Gaurav
9958580940

--
Gaurav

Amit

unread,
Jan 9, 2011, 11:59:17 AM1/9/11
to Ajnara_Daffodil_137
But not all have received the revised offer sheet.

Kapil

unread,
Jan 10, 2011, 2:43:27 AM1/10/11
to Ajnara_Daffodil_137
Gaurav,

I have taken loan from Corporation Bank. At that time, ROI was
8.25% (Base Rate) - 1st Year
8.75% (base Rate + .5) - 2nd and 3rd Year
9.25% (Base Rate + 1) - 4th year onwards

Thanks,
Kapil Madaan
991-009-5544

On Jan 9, 10:46 am, GAURAV BHARDWAJ <gauravsbhard...@gmail.com> wrote:
> Dear All,
> I also got 3rd demand letter and last date is 15th Jan,so i have decided to
> take loan from *Corporation Bank.*
> Plz. let me know if anuone take loanfrom corporation Bank and What is the
> Rate of Interest with all terms?
>
> regards
> Gaurav
> 9958580940
>
> Gaurav- Hide quoted text -

Devendra Sharma

unread,
Jan 10, 2011, 4:16:23 AM1/10/11
to ajnara_da...@googlegroups.com
I recently paid for 3rd installment and Ajnara sent me the revised cost sheet including the service tax. when I asked why this service tax in not mentioned in demand letter, I was told that since loan is approved based on earlier cost estimate so Bank will disburse approved amount only and any additional amount will be borne by individual.
They have sent revised cost sheet and asked to return one copy (signed) back to Ajnara for records....
 
Any idea when we should expect for next installment (4th - tower H pahse 1)
 
Thanks
Dev

amit ragtah

unread,
Jan 10, 2011, 8:54:58 AM1/10/11
to ajnara_da...@googlegroups.com
Has anybody received demand letter for Tower-C
I have still not received any demand letter.

Amit

amit das

unread,
Jan 10, 2011, 11:39:16 PM1/10/11
to ajnara_da...@googlegroups.com
Yes Amit, I have received for tower C on 3rd Jan.'11.
 
Regards

sanjeev chopra

unread,
Jan 12, 2011, 9:40:05 AM1/12/11
to ajnara_da...@googlegroups.com
I'm in Tower F and I still haven't received my letter for 3rd installment. Can anyone confirm if he/she has received 3rd demand letter for tower F?
 
Thanks,
Samy 

--

Sanjeev Chopra
Batch of 2007  FMS,Delhi
Batch of 2004  NSIT,Delhi

Dheeraj Anand

unread,
Jan 12, 2011, 10:05:44 AM1/12/11
to Ajnara_Daffodil_137
I am in F-704. I got demand in Nov 2010. The last date was mentioned
as Nov 30, 2010. I paid the installment. I financed it through bank.

Thanks,
Dheeraj
F-704

On Jan 12, 7:40 pm, sanjeev chopra <sanjeev....@gmail.com> wrote:
> I'm in Tower F and I still haven't received my letter for 3rd installment.
> Can anyone confirm if he/she has received 3rd demand letter for tower F?
>
> Thanks,
> Samy
>
>
>
>
>
> On Mon, Jan 10, 2011 at 11:39 PM, amit das <amitandy...@gmail.com> wrote:
> > Yes Amit, I have received for tower C on 3rd Jan.'11.
>
> > Regards
>
> >   On Mon, Jan 10, 2011 at 7:24 PM, amit ragtah <amitrag...@gmail.com>wrote:
>
> >> Has anybody received demand letter for Tower-C
> >> I have still not received any demand letter.
>
> >> Amit
>
> >> On Mon, Jan 10, 2011 at 2:46 PM, Devendra Sharma <devsha...@gmail.com>wrote:
>
> >>> I recently paid for 3rd installment and Ajnara sent me the revised cost
> >>> sheet including the service tax. when I asked why this service tax in not
> >>> mentioned in demand letter, I was told that since loan is approved based on
> >>> earlier cost estimate so Bank will disburse approved amount only and any
> >>> additional amount will be borne by individual.
> >>> They have sent revised cost sheet and asked to return one copy (signed)
> >>> back to Ajnara for records....
>
> >>> Any idea when we should expect for next installment (4th - tower H pahse
> >>> 1)
>
> >>> Thanks
> >>> Dev
>
> Batch of 2004  NSIT,Delhi- Hide quoted text -

shafat khan

unread,
Jan 12, 2011, 11:22:15 PM1/12/11
to ajnara_da...@googlegroups.com
Dear Sanjeev,
i have already paid in Nov end . I am in F-202.
 
Regards
Shafat

Deepak

unread,
Jan 18, 2011, 5:30:05 AM1/18/11
to Ajnara_Daffodil_137
Anybody received demand letter for Tower - J (Phase 2).

Deepak
==============================================

On Nov 24 2010, 9:08 am, shafat khan <shafat...@gmail.com> wrote:
> Dear Friends,
>
> i have received the next demand letter from Ajnara. Iam in Tower-F. Any body
> else has received this??
>
> Regards
>
> Shafat
> F-202
> On Tue, 23 Nov 2010 16:28:42 +0530 "Anjna Nair" ajn...@ajnara.com wrote
>
> Dear Sir
>
> We are happy to announce that for your tower foundation is been completed.
>
> Kindly pay your demand by 30.11.2010
>
> Regards
>
> Anjana Nair
>
> + 91 9582801825

Kapil

unread,
Jan 20, 2011, 1:08:35 AM1/20/11
to Ajnara_Daffodil_137
Deepak,

I am in Tower - I (Phase 2) and have not received any letter and not
expecting it in a month or two as per the status...... Have you got
the letter?

Thanks,
Kapil Madaan
> > + 91 9582801825- Hide quoted text -

Saurabh Saxena

unread,
Jan 19, 2011, 2:00:30 PM1/19/11
to ajnara_da...@googlegroups.com
Hi All,
I have flat in Tower A (Phase I). I just got the third demand letter
(first being the booking amount and the second being the 30% one as I
am in Flexi Plan). I am wondering if the construction is really going
at the rate Ajnara is demanding money from us. Does anyone of you
have any idea? Also, is there anyone who has book in Tower A?
Also, I got the letter yesterday while in the letter it was mentioned
that the payment should be made on or before 15/01/2011. I think we
should take it up with the Ajnara people to give us ample time in
order to plan for the money. What is the general feeling? Is similar
problem being faced by others too?

Saurabh (9818363673)
Flat No. A0002.

atul upreti

unread,
Jan 20, 2011, 8:46:17 AM1/20/11
to ajnara_da...@googlegroups.com
Dear Saurabh,

if you go again through the agreement letter then you will realise that in flexi plan except the 10 % that is to be paid at the time of possession rest 90 % is likely to be paid within this year or at max first qtr of 2012. In this plan the builder gets 50 % with in first six months if there are no initial hiccups to the builder. 

regards  

Deepak

unread,
Jan 20, 2011, 11:15:15 PM1/20/11
to Ajnara_Daffodil_137
Hi Kapil,
I have not received any demand yet. I think Phase - 2 work has not
yet started.

For ALL: Anybody from phase - 2 got any further demand from Ajnara

Deepak
=================================

Kapil

unread,
Jan 21, 2011, 1:26:57 AM1/21/11
to Ajnara_Daffodil_137
@Saurabh - you are right, we should be given ample time for payment,
at least 3-4 weeks. I hope Ajnara guys would agree if we talk to them.

@Atul - I have also booked in Flexi plan but it is not like that we
have to pay 90% amount this year or 2012 by 1st qtr. After making
first two payments (30% or 40%, as per your deal), all the payments
are construction linked. I am not sure if you have some other payment
plan, please see their website which also say the same thing.

@Deepak - Yes, it is about to start in a month after tower-A basement
work is complete.

Thanks,
Kapil Madaan
> > > - Show quoted text -- Hide quoted text -

Ranjoy Guha

unread,
Jan 21, 2011, 2:40:24 AM1/21/11
to ajnara_da...@googlegroups.com
Yes Sourabh, I have also received the demand letter asking for the amount to be paid by 15th Jan. We should be given ample time.
 
Ranjoy Guha
B-1401
On Thu, Jan 20, 2011 at 12:30 AM, Saurabh Saxena <saurabh...@gmail.com> wrote:

Saurabh Saxena

unread,
Jan 21, 2011, 5:03:09 AM1/21/11
to ajnara_da...@googlegroups.com
@Kapil, @Ranjoy: Thanks for echoing the problem. What do you people
think, could be the best way to proceed? I think speaking to them on
phone may not be a good idea because
1) the people (like Jyoti who generally calls me on behalf of Ajnara)
do not sound empowered enough to take any decision
2) they are very erratic and generally their response is unpredictable
(this opinion is solely based on my personal experience)
May be we could go to the site and speak with Mr. I.M. Sharma (who
used to be the senior most person at the site when I was booking). But
the potential issue with this would be that he would be from sales
department while our concern should be addressed by the department
which handles post sales matters. I agree that 1 month headroom is
good enough.
By the way, does any of you have been to the site or is updated about
the construction status so that we could be assured that the payments
are actually as per the construction linkage?

@Kapil: Can you please send your phone number to me?


@Atul: I think we both have the same understanding (that the payment
is construction linked). When you say that more than 50% would be
taken by the builder in first six months, you are assuming a certain
pace of construction. My point is that most of us (like myself) would
not be well aware of the normal pace of construction in builder
flats,hence we would not be in a position to preempt the installment
payment dates. The builder would have some plan for construction which
could be made available to us for tentative timing information. Now,
even if we get the tentative plan from builder, we would need to know
if he is really meeting the milestones as per the schedule or is
lagging/leading w.r.to the plan.

Saurabh (9818363673).

atul upreti

unread,
Jan 21, 2011, 9:41:25 AM1/21/11
to ajnara_da...@googlegroups.com
Dear Saurabh

i too have opted for flexi plan and after some careful reading found that as per agreement letter, the only difference in Flexi and CLP is that the person opting Flexi plan will pay     90 % on casting of 8th floor slab... (it is casting of 8 th floor slab and not completion of any floor that means the brick work and interiors are all left... So if the builder goes as per curing time then he will be able to complete it in 14-18 months of construction cycle.. So that means 90 % in case of Ajnara flexi plan will be paid by Feb 2012 by all of Flexi plan  for possession which is not likely before Sep Oct 2012. 

When I say 50% with in six months then it is by adding 10 % at booking 30 % within 60 days.. This 40 % give him capital to start the work and ask for 10 % on completion of foundation.. So with average construction speed this becomes six months as the installment becomes due on completion of foundation which does not include the curing time.   

Regards Atul 

Kapil

unread,
Jan 22, 2011, 1:09:32 AM1/22/11
to Ajnara_Daffodil_137
@Atul - I agree, understood your logic. I was thinking otherwise.

@Saurabh - I have sent you my phone number on your mail-id as well.

Thanks,
Kapil Madaan
991-009-5544

On Jan 21, 7:41 pm, atul upreti <upreti.a...@gmail.com> wrote:
> Dear Saurabh
>
> i too have opted for flexi plan and after some careful reading found that as
> per agreement letter, the only difference in Flexi and CLP is that the
> person opting Flexi plan will pay     90 % on casting of 8th floor slab...
> (it is casting of 8 th floor slab and not completion of any floor that means
> the brick work and interiors are all left... So if the builder goes as per
> curing time then he will be able to complete it in 14-18 months of
> construction cycle.. So that means 90 % in case of Ajnara flexi plan will be
> paid by Feb 2012 by all of Flexi plan  for possession which is not likely
> before Sep Oct 2012.
>
> When I say 50% with in six months then it is by adding 10 % at booking 30 %
> within 60 days.. This 40 % give him capital to start the work and ask for 10
> % on completion of foundation.. So with average construction speed this
> becomes six months as the installment becomes due on completion of
> foundation which does not include the curing time.
>
> Regards Atul
>
> On Fri, Jan 21, 2011 at 3:33 PM, Saurabh Saxena
> <saurabhsaxen...@gmail.com>wrote:
> > On 21 January 2011 13:10, Ranjoy Guha <emailran...@gmail.com> wrote:
> > > Yes Sourabh, I have also received the demand letter asking for the
> > amount to
> > > be paid by 15th Jan. We should be given ample time.
>
> > > Ranjoy Guha
> > > B-1401
> > > +91-9999203080
>
> > > On Thu, Jan 20, 2011 at 12:30 AM, Saurabh Saxena <
> > saurabhsaxen...@gmail.com>
> > > wrote:
>
> > >> Hi All,
> > >> I have flat in Tower A (Phase I). I just got the third demand letter
> > >> (first being the booking amount and the second being the 30% one as I
> > >> am in Flexi Plan). I am wondering if the construction is really going
> > >> at the rate Ajnara is demanding money from us. Does anyone of  you
> > >> have any idea? Also, is there anyone who has book in Tower A?
> > >> Also, I got the letter yesterday while in the letter it was mentioned
> > >> that the payment should be made on or before 15/01/2011. I think we
> > >> should take it up with the Ajnara people to give us ample time in
> > >> order to plan for the money. What is the general feeling? Is similar
> > >> problem being faced by others too?
>
> > >> Saurabh (9818363673)
> > >> Flat No. A0002.
>
> > >> On 18 January 2011 16:00, Deepak <deepak.ni...@gmail.com> wrote:
> > >> > Anybody received demand letter for Tower - J (Phase 2).
>
> > >> > Deepak
> > >> > ==============================================
>
> > >> > On Nov 24 2010, 9:08 am, shafat khan <shafat...@gmail.com> wrote:
> > >> >> Dear Friends,
>
> > >> >> i have received the next demand letter from Ajnara. Iam in Tower-F.
> > Any
> > >> >> body
> > >> >> else has received this??
>
> > >> >> Regards
>
> > >> >> Shafat
> > >> >> F-202
> > >> >> On Tue, 23 Nov 2010 16:28:42 +0530 "Anjna Nair" ajn...@ajnara.comwrote
>
> > >> >> Dear Sir
>
> > >> >> We are happy to announce that for your tower foundation is been
> > >> >> completed.
>
> > >> >> Kindly pay your demand by 30.11.2010
>
> > >> >> Regards
>
> > >> >> Anjana Nair
>

Saurabh Saxena

unread,
Jan 21, 2011, 4:25:11 PM1/21/11
to ajnara_da...@googlegroups.com
@Atul:
Thanks for highlighting the details of the flexi plan. I had started
this discussion after going through the flexi plan terms. My concern
is if the builder is actually abiding the terms or not. Meaning to say
that it should not happen that the builder takes money from us and the
construction is not according to the plan.
The other point is in terms of actual time frame after which each
installment needs to go. Even if 50% money goes to the builder in 6
months, I would like to know, tentatively, when during the six months
are the installments planned. Hence, I could plan my finances so that
making the timely payments is easier than what it is now.

Saurabh.

Dheeraj Anand

unread,
Feb 6, 2011, 11:45:15 PM2/6/11
to Ajnara_Daffodil_137
I got call from Ajnara about 4th demand!!!!!! I am in tower 'F' and on
CLP. Is the construction realy going

On Jan 22, 2:25 am, Saurabh Saxena <saurabhsaxen...@gmail.com> wrote:
> @Atul:
> Thanks for highlighting the details of the flexi plan. I had started
> this discussion after going through the flexi plan terms. My concern
> is if the builder is actually abiding the terms or not. Meaning to say
> that it should not happen that the builder takes money from us and the
> construction is not according to the plan.
> The other point is in terms of actual time frame after which each
> installment needs to go. Even if 50% money goes to the builder in 6
> months, I would like to know, tentatively, when during the six months
> are the installments planned. Hence, I could plan my finances so that
> making the timely payments is easier than what it is now.
>
> Saurabh.
>
> On 21 January 2011 20:11, atul upreti <upreti.a...@gmail.com> wrote:
>
>
>
> > Dear Saurabh
> > i too have opted for flexi plan and after some careful reading found that as
> > per agreement letter, the only difference in Flexi and CLP is that the
> > person opting Flexi plan will pay     90 % on casting of 8th floor slab...
> > (it is casting of 8 th floor slab and not completion of any floor that means
> > the brick work and interiors are all left... So if the builder goes as per
> > curing time then he will be able to complete it in 14-18 months of
> > construction cycle.. So that means 90 % in case of Ajnara flexi plan will be
> > paid by Feb 2012 by all of Flexi plan  for possession which is not likely
> > before Sep Oct 2012.
> > When I say 50% with in six months then it is by adding 10 % at booking 30 %
> > within 60 days.. This 40 % give him capital to start the work and ask for 10
> > % on completion of foundation.. So with average construction speed this
> > becomes six months as the installment becomes due on completion of
> > foundation which does not include the curing time.
> > Regards Atul
>
> > On Fri, Jan 21, 2011 at 3:33 PM, Saurabh Saxena <saurabhsaxen...@gmail.com>
> >> On 21 January 2011 13:10, Ranjoy Guha <emailran...@gmail.com> wrote:
> >> > Yes Sourabh, I have also received the demand letter asking for the
> >> > amount to
> >> > be paid by 15th Jan. We should be given ample time.
>
> >> > Ranjoy Guha
> >> > B-1401
> >> > +91-9999203080
>
> >> > On Thu, Jan 20, 2011 at 12:30 AM, Saurabh Saxena
> >> > <saurabhsaxen...@gmail.com>
> >> > wrote:
>
> >> >> Hi All,
> >> >> I have flat in Tower A (Phase I). I just got the third demand letter
> >> >> (first being the booking amount and the second being the 30% one as I
> >> >> am in Flexi Plan). I am wondering if the construction is really going
> >> >> at the rate Ajnara is demanding money from us. Does anyone of  you
> >> >> have any idea? Also, is there anyone who has book in Tower A?
> >> >> Also, I got the letter yesterday while in the letter it was mentioned
> >> >> that the payment should be made on or before 15/01/2011. I think we
> >> >> should take it up with the Ajnara people to give us ample time in
> >> >> order to plan for the money. What is the general feeling? Is similar
> >> >> problem being faced by others too?
>
> >> >> Saurabh (9818363673)
> >> >> Flat No. A0002.
>
> >> >> On 18 January 2011 16:00, Deepak <deepak.ni...@gmail.com> wrote:
> >> >> > Anybody received demand letter for Tower - J (Phase 2).
>
> >> >> > Deepak
> >> >> > ==============================================
>
> >> >> > On Nov 24 2010, 9:08 am, shafat khan <shafat...@gmail.com> wrote:
> >> >> >> Dear Friends,
>
> >> >> >> i have received the next demand letter from Ajnara. Iam in Tower-F.
> >> >> >> Any
> >> >> >> body
> >> >> >> else has received this??
>
> >> >> >> Regards
>
> >> >> >> Shafat
> >> >> >> F-202
> >> >> >> On Tue, 23 Nov 2010 16:28:42 +0530 "Anjna Nair" ajn...@ajnara.com
> >> >> >> wrote
>
> >> >> >> Dear Sir
>
> >> >> >> We are happy to announce that for your tower foundation is been
> >> >> >> completed.
>
> >> >> >> Kindly pay your demand by 30.11.2010
>
> >> >> >> Regards
>
> >> >> >> Anjana Nair
>

Dheeraj Anand

unread,
Feb 6, 2011, 11:47:28 PM2/6/11
to Ajnara_Daffodil_137
I got call from Ajnara about 4th demand!!!!!! I am in tower 'F' and
on CLP. Is the construction realy going at rocket speed? Can any one
confirm as I don't live in Noida/Delhi/Gaziabad/Gurgoan. Third demand
I paid in November 2010. So this demand is exactly after 2 months of
3rd demand.

Dheeraj
F - 704
> > - Show quoted text -- Hide quoted text -

sukhbir

unread,
Feb 7, 2011, 10:58:34 AM2/7/11
to Ajnara_Daffodil_137

Even I got call from Ajnara regarding 4th Payment(Flexi plan). I am in
Tower F 903.
I have been to site last week, construction is realy going on at a
good pace. I am satisfied till now.

Regards,
Sukhbir Singh

Trajora-Gmail

unread,
Feb 7, 2011, 11:08:52 AM2/7/11
to ajnara_da...@googlegroups.com, Ajnara_Daffodil_137
Hi Sukhbir,

If possible, can you please provide an brief update on construction for everyone's benefit.

And it would be amazing if you have taken any pictures.

regards,
Tirlok Rajora

Amit

unread,
Feb 7, 2011, 11:12:36 AM2/7/11
to Ajnara_Daffodil_137
Wow!!! That's a really good news.
Nice pace of construction for F-Block residents, Congrats.
BTW, when did you guys receive the 3rd demand?
It would be really great if someone can post some pictures.

sukhbir

unread,
Feb 8, 2011, 3:54:14 AM2/8/11
to Ajnara_Daffodil_137

Actually, All the towers in phase 1 are constructed at same pace.
I have clicked some pics, i will upload.

Regards,
Sukhbir Singh

prashant vatsa

unread,
Feb 8, 2011, 5:25:28 AM2/8/11
to ajnara_da...@googlegroups.com
Thanks Sukhbir
If you can upload pics it would be great for us.
 
Prashant
G-202

sanjeev chopra

unread,
Feb 8, 2011, 3:17:04 PM2/8/11
to ajnara_da...@googlegroups.com
Received mail for 4th letter. Im in tower F.