Hello everyone,
I am trying to use APEX model to monitor phosphorous leaving the field . The size of the field is around 45.7 ha.
What size of the DEM do I select to delineate watershed?
Also when I create watershed, a very small watershed is delineated ( I have added a picture).
The lines are tile drain lines and I tried to upload a DEM 3 times larger than the field size.
The red lines are the created watershed.
