I made a GMNS node-link network from the Freight Analysis Framework (FAF5) network, around 500k links and 300k nodes.
AequilibraE 1.4.2 seems to be hanging on running project.network.create_from_gmns
Observed behavior:
For the first hour, it was consuming about 2 GB of RAM, and 10-20% of CPU
For at least some of the next 16 hours, it was consuming about 200k of RAM, and 10-20% of CPU
I killed the process after 17 hours.
My computer:
Dell Latitude 7430
Intel(R) Core(TM) i7-1265U 1.80 GHz
16 GB RAM
About 20 GB free disk space
Is it normal to take this long to build a large network? Thanks.
Scott B. Smith, Ph.D.
Room 444, Technology Analysis and Strategy Division (V-336)
Volpe National Transportation Systems Center | U.S. Department of Transportation
220 Binney St, Cambridge, MA 02142
( +1 617.494.2588 office; +1 857 998 2234 mobile | * scott...@dot.gov | 8 www.volpe.dot.gov
Advancing transportation innovation for the public good
--
You received this message because you are subscribed to the Google Groups "AequilibraE" group.
To unsubscribe from this group and stop receiving emails from it, send an email to aequilibrae...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/aequilibrae/EA3PR09MB12132E647138D8BADB4ED970BEFABA%40EA3PR09MB12132.namprd09.prod.outlook.com.