What I mean is:
I change the % completed value and hit ENTER or I use the up/down buttons on the right edge of the field and the only values which are shown on the tasklist are 95% and 100%. The old bug with the missing sorting is fixed. But now every value except 95 and 100% is ignored. Saving doesn't update the tasklist either.
How to check it:
- Enter 80 in the field
- Press the up button until the value is 100 (the task is sorted below the uncompleted tasks and the value 100% is shown on the tasklist)
- Press the down button (the task is sorted back into the uncompleted tasks and the tasklist shows 95)
- Press the down button again (90 is shown in the entry field, but on the tasklist it's still 95)
- repeat the last step several times to see the problem
edit: I just found out that this only happens in the TREEVIEW! In the listview (which I never use) it works (except it doesn't sort the task when reaching 100%, but I think that's normal for this view?)