Was anyone able to see the full meeting? Attached is the PowerPoint courtesy of Ned Codd.
I caught the latter half, and it seemed to have been mainly residences of Opus, who were more interested in a path connecting them to Nahanton Park than in a sidewalk along Nahanton Road. Opus is funding about 1/3 of the project.
Disappointingly, the sidewalk/bike path ends at Wells Ave, before the bridge over the Charles to Needham. Probably because 1/2 the bridge is in Needham. Ped/bike improvements are desperately needed over the bridge and along Kendrick.
Lucia