I want to change the number of users in - Real-world schedule by test, Number Mode Scenario. By default I can see the option to change the no of users to be grayed out in this mode. Its frustrating to roll back to percentage mode, give percentage values for each scenario based on the user load and then rolling back again to Number mode to see if we get the desired numbers for each scenario. Even after doing this I am unable to get the desired numbers. PC is using some algorithm to distribute the users by itself when we provide the % values. I also observed that this automatic distribution by PC changes every time.
Users %
7 2.272727273
133 43.18181818
7 2.272727273
56 18.18181818
14 4.545454545
35 11.36363636
49 15.90909091
7 2.272727273
308 100
Version: HP Performance Center 12.20
Thanks,
Asif