Chip Seal Hill Road, Old Mohawk, Mohawk July 14th-27th
8 views
Skip to first unread message
Bob Lewis
unread,
Jul 22, 2026, 8:25:07 PM (13 days ago) Jul 22
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to GEARs
Hill Road:
Lane
County will be Chip Sealing Hill Rd from Old Mohawk Rd (MP 0) to Marcola
Rd (MP 4.57) during the timeframe of July 14th - 27th.
Expect
up to 20-minute delaysfrom 7am-6pm Monday-Thursday during
chip seal & fog seal.
Drive
slowly to avoid kicking up loose rock and damaging the road surface.
The
road surface will resemble a gravel road with only temporary pavement
markers until after the application of fog seal & re-striping; expect
loose rock, especially along road shoulders.
Old Mohawk Rd
Lane
County will be Chip Sealing Old Mohawk Rd from Marcola Rd/Camp Cr (MP 0)
to Marcola Rd (MP 3.2) during the timeframe of July 14th - 22nd.
Expect
up to 20-minute delaysfrom 7am-6pm Monday-Thursday during
chip seal & fog seal.
Drive
slowly to avoid kicking up loose rock and damaging the road surface.
The
road surface will resemble a gravel road with only temporary pavement
markers until after the application of fog seal & re-striping; expect
loose rock, especially along road shoulders.
Mohawk Road
Lane
County will be Chip Sealing Marcola Rd from Pico St (MP 7.0) to Parson's
Cr Rd (MP 10.49) during the timeframe of July 14th - 27th.
Expect
up to 20-minute delaysfrom 7am-6pm Monday-Thursday during
chip seal & fog seal.
Drive
slowly to avoid kicking up loose rock and damaging the road surface.
The
road surface will resemble a gravel road with only temporary pavement
markers until after the application of fog seal & re-striping; expect
loose rock, especially along road shoulders