Overview_Building&Land_Use.xlsx - Invitation to edit

0 views
Skip to first unread message

Ines Koch (via Google Sheets)

unread,
May 20, 2018, 11:50:59 AM5/20/18
to ESTF-2-Build...@googlegroups.com
Ines Koch has invited you to edit the following spreadsheet:
Google Sheets: Create and edit spreadsheets online.
Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
You have received this email because someone shared a spreadsheet with you from Google Sheets.
Logo for Google Sheets

Ines Koch (via Google Sheets)

unread,
May 24, 2018, 2:52:29 PM5/24/18
to ESTF-2-Build...@googlegroups.com

chirjiv anand

unread,
May 24, 2018, 3:12:06 PM5/24/18
to ESTF-2 New/Existing Buildings and Land Use
If your recommendations are not listed on this file on the sheet named 'Sum B& LU, #MT, $MTGHG' (pasted below), please let me know. I am working on a survey to send out for voting from B&LU on tentative prioritization of the recommendations today. The list will be revised after we have the final approved list.

BE-9Differential Utility Tax Encouraging Low Carbon Energy Use (Revenue Neutral)Mike Balma
BE-7Encourage installation of Electric Vehicle Charging Stations at
existing multi-unit dwellings
Dave Pardise
BE-12City Building Electrification LeadershipMike Balma
EB-1Incentivize Switching Residential Space Heating/Cooling and
Water Heating Systems from Natural Gas to Electricity
Hala
BN-1Green Building Code updates to move towards low-carbon buildingsChirjiv
BN-3Financial and non-financial incentives for new above code buildingsChirjiv
BN-6Require LEED Platinum for all City New Construction or Major Renovation over 5,000 square feetLauren 
BN-2Study, set goals and develop a roadmap for a Zero Net Energy policy for all new and existing buildingsThida
BN-4Building Codes to Reduce Embodied Carbon in Commercial and Multi-family BuildingsEmily
M-10 Knowledge base for electrificationBruce N.
BT-1
Enliven Mountain View (Native plants, Oak trees, and Parklets)
B- ?Decarbonization Policy Ines
BE- ?Energy Efiiciency Measures in Existing BuildingsEmily

--
You received this message because you are subscribed to the Google Groups "ESTF-2 New/Existing Buildings and Land Use" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-Landuse+unsub...@googlegroups.com.
To post to this group, send email to ESTF-2-Buildings-Landuse@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/ESTF-2-Buildings-Landuse/000000000000363d28056cf8271d%40google.com.
For more options, visit https://groups.google.com/d/optout.



--
Chirjiv Anand

chirjiv anand

unread,
May 24, 2018, 5:52:38 PM5/24/18
to ESTF-2 New/Existing Buildings and Land Use
I have links to all recommendations updated on the excel file  Ines share this morning. I am missing  links to 

BE-12City Building Electrification LeadershipMike Balma
EB-1Incentivize Switching Residential Space Heating/Cooling and
Water Heating Systems from Natural Gas to Electricity

Hala
To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-Landuse+unsubscr...@googlegroups.com.



--
Chirjiv Anand



--
Chirjiv Anand

chirjiv anand

unread,
May 24, 2018, 5:55:13 PM5/24/18
to ESTF-2 New/Existing Buildings and Land Use
Sorry! The earlier email left too soon!



I have links to all recommendations updated on the excel file  Ines share this morning. I am missing  links to the following. If you could share them with me I will update them on the excel file.


BE- ?Energy Efiiciency Measures in Existing BuildingsEmily
BT-1Enliven Mountain View (Native plants, Oak trees, and Parklets)
BE-12City Building Electrification LeadershipMike Balma
EB-1Incentivize Switching Residential Space Heating/Cooling and
Water Heating Systems from Natural Gas to Electricity


Thank you,
Chirjiv
--
Chirjiv Anand

Ines Koch (via Google Sheets)

unread,
Jun 2, 2018, 4:30:22 PM6/2/18
to ESTF-2-Build...@googlegroups.com
Ines Koch has invited you to edit the following spreadsheet:
Unknown profile photoURGENT - I need your support!
What do you think should be the highest priority?
What will have the most impact over everything?

I will be at the meeting tomorrow Sunday at 2 pm.
PLEASE give me your input :-D

Ines

Ines Koch

unread,
Jun 2, 2018, 4:47:13 PM6/2/18
to ESTF-2 New/Existing Buildings and Land Use
And please give me your reason for your highest priorities so that I can understand where you are coming from.

I will try my best to represent us tomorrow 2 pm at the steering group meeting.

Vote on the below excel sheet - tab 1.

THANKS
Ines 

--
You received this message because you are subscribed to the Google Groups "ESTF-2 New/Existing Buildings and Land Use" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-L...@googlegroups.com.
To post to this group, send email to ESTF-2-Build...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/ESTF-2-Buildings-Landuse/000000000000ce69d6056dae9164%40google.com.

Thida Cornes

unread,
Jun 2, 2018, 5:13:48 PM6/2/18
to Ines Koch, ESTF-2 New/Existing Buildings and Land Use
I think we should all share our reasons and vote, so we can understand where everyone is coming from. Ines, I see you put all 0s which is not valid. Everyone has their own POV and the best way towards transparency is to be open about what yours are. 

I voted for top 3. #1 CSO because that was the top recommendation of the entire task force per an earlier vote. I voted for Transportation's overall policy as #2 because transportation is the #1 source of GHG and the recommendation is all about MV. I voted for Building's overall policy as #3 because buildings are the #2 source of GHG. 

I'd want to hear more from the other WG reps about how their recommendations fit with other recommendations and their own priorities before I advocated for one recommendation over another. In general I would advocate that overall policy for each WG is in the top 10 and then pick the top one or two that the WGs feel best supports their overall policy.

​Neither Bruce nor I can vote since we are not representing any WG. All WGs have one representative who can vote and every WG except B&LU has one representative who's attending. For some reason both Ines and Amanda are both going for B&LU​, but B&LU still only gets one vote. I think the other WG representatives would feel more comfortable if only one person represented B&LU  and it would make the meeting go faster.

Thanks, 
Thida (she/her)

To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-Landuse+unsub...@googlegroups.com.
To post to this group, send email to ESTF-2-Buildings-Landuse@googlegroups.com.

--
You received this message because you are subscribed to the Google Groups "ESTF-2 New/Existing Buildings and Land Use" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-Landuse+unsub...@googlegroups.com.
To post to this group, send email to ESTF-2-Buildings-Landuse@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/ESTF-2-Buildings-Landuse/CAEQhBsVqNtG8%2BS2rat5XFMkEfaCHbs7bs-%3DcjZcGab4yMq8hmQ%40mail.gmail.com.

Ines Koch

unread,
Jun 2, 2018, 5:57:37 PM6/2/18
to Thida Cornes, ESTF-2 New/Existing Buildings and Land Use
Thanks Thida,

If Emily is representing our group - then I am happy not to go to the meeting tomorrow. (She is only flying back tonight)
I am sure she will be happy to have all your priorities. :-) .

It is hard to rank them all 1-15, but tomorrow they will all be ranked.
It would be a good input for the person going to the meeting tomorrow to know how everybody feels about all of them.

I haven't yet voted :)  - The 0 were just there to have the links to all the recos not cover everything and get it out to all of you faster.

- Ines

To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-L...@googlegroups.com.
To post to this group, send email to ESTF-2-Build...@googlegroups.com.

--
You received this message because you are subscribed to the Google Groups "ESTF-2 New/Existing Buildings and Land Use" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-L...@googlegroups.com.
To post to this group, send email to ESTF-2-Build...@googlegroups.com.
--
You received this message because you are subscribed to the Google Groups "ESTF-2 New/Existing Buildings and Land Use" group.
To unsubscribe from this group and stop receiving emails from it, send an email to ESTF-2-Buildings-L...@googlegroups.com.
To post to this group, send email to ESTF-2-Build...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/ESTF-2-Buildings-Landuse/CAK%2B2fyKT5_a8uw_C1HC%3DSezDCrT-K1h9gpTGQYLtSth%3DMvWzow%40mail.gmail.com.

Ines Koch

unread,
Jun 3, 2018, 11:02:58 AM6/3/18
to ESTF-2 New/Existing Buildings and Land Use


And please give the reason for your highest priorities!

Vote on the below excel sheet - tab 1.
ALL recos in order from 1-15 with 1 being the most important to you and 15 the least.

Ines Koch

unread,
Jun 3, 2018, 4:38:18 PM6/3/18
to ESTF-2 New/Existing Buildings and Land Use
Reason behind my vote:

1. CSO 
Budget GHG emissions should be highest- but I am afraid it leads to a political debate slowing everything down and without a CSO office we are not able to win that debate.
That’s why I voted for CSO office who sits at the same ranks as other department heads and can lead that discussion 
2. Budget the GHG and then everything else will fall into place in theory.

Ines 

Mike Balma

unread,
Jun 3, 2018, 4:54:03 PM6/3/18
to Ines Koch, ESTF-2 New/Existing Buildings and Land Use
The cost per MT of transportation items T4A $787/MT and T4B $328/MT are very high compared to Sustainable Landscaping $84 to $160/MT which is why I ranked Sustainable Landscaping above T4A.

I also had community engagement tools O2B lower similar to Chirjiv.  The links that were in the spreadsheet did not go to the final recommendations.  My general thought was that much of the outreach is in the buildings and transportation recommendations already.

Mike


From: Ines Koch <inesit...@gmail.com>
To: ESTF-2 New/Existing Buildings and Land Use <ESTF-2-Build...@googlegroups.com>
Sent: Sunday, June 3, 2018 1:38 PM
Subject: [estf-2-buildings-landuse] Re: Urgent: VOTE on overall priority of whole task force

Reply all
Reply to author
Forward
0 new messages