Progress Report (10/02/2005), part b

14 views
Skip to first unread message

Erick...@gmail.com

unread,
Oct 2, 2005, 4:48:11 PM10/2/05
to Crestliner Dane
Sunday Progress Report Part B.

I pushed the boat out of the garage for some sun hoping I can cause the
crap thats inside to dry. It is too wet to move and I dont want it to
be too gross when I need to remove it.

I disconnected the mast light and powerlines. Looked under the 'hood'
to get an idea on how they are controled so I can reconnect them
latter, as well as looking into how to disconnect the motor controls.

Untied the front crank rope and cut off all the ugly old rope. That
rope underneeth looks like its never been used, all pressed flat and
glazed over with wax.

I'll need to get the boat dry before I can remove the dirt, and after
that phase 2 will start. COnstruction of the deck, side boards, arm
panels, and chairs. Some of the wood removed looks like it is still in
ok condition, but i think I will replace it all anyway.

http://i18.photobucket.com/albums/b147/airportphantom/Boat/MVC-216F.jpg
http://i18.photobucket.com/albums/b147/airportphantom/Boat/MVC-215F.jpg
http://i18.photobucket.com/albums/b147/airportphantom/Boat/MVC-214F.jpg
http://i18.photobucket.com/albums/b147/airportphantom/Boat/MVC-213F.jpg

Reply all
Reply to author
Forward
0 new messages