Fw: RE: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::

2 views
Skip to first unread message

MOHAMMAD SHABBIR

unread,
Apr 6, 2012, 4:13:55 AM4/6/12
to Ali Saljuk, Zain Muhammad, ALU-EX...@googlegroups.com, Jawad Ali khan, fahad Zoraiz
Dear All,
 
Please send me the status of the site RUR0152.
 
Regards
 
Muhammad Shabbir

--- On Fri, 6/4/12, Asif taj/TEC/MUL <asif...@mobilink.net> wrote:

From: Asif taj/TEC/MUL <asif...@mobilink.net>
Subject: RE: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::
To: "MOHAMMAD SHABBIR" <shabb...@yahoo.com>
Cc: "Kamran Arif (kamra...@alcatel-lucent.pk)" <kamra...@alcatel-lucent.pk>, "Yasir Hamayun (yasir....@hotmail.com)" <yasir....@hotmail.com>, "jawaad...@gmail.com" <jawaad...@gmail.com>, "Muhammad Arslan Munir/TEC/MUL" <ARSALA...@mobilink.net>, "TEC-DEPLOYMENT CENTRAL III TEAM" <Deployment...@mobilink.net.pk>
Date: Friday, 6 April, 2012, 11:39 AM

Dear Shabbir,

 

The subjected site RUR0152_Chak Gaman Khan Wala is down. Also there is HW sharing among the sectors & there is alarm on BTS DDF. Rectify all the issues & give us feedback. Snapshots are attached herewith for your reference.

Do avoid HW sharing in future.

 

Thanks.

 

Best Regards,

Asif Taj

BSS TEC-DEPLOYMENT CENTRAL-3

+92-0301-8630019

 

From: Muhammad Wasim Hayat/TEC/MUL
Sent: Friday, April 06, 2012 11:18 AM
To: Asif taj/TEC/MUL
Subject: FW: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::

 

FYA please, confirm it from omc terminal and ask ALU to resolve these issues

 

Regards,

Muhammad Wasim Hayat

BSS Deployment CIII

+92-301-8731177

 

From: Sohail Siddiq/TEC/MUL
Sent: Friday, April 06, 2012 10:51 AM
To: Muhammad Wasim Hayat/TEC/MUL
Cc: Hafiz Muhammad Imran/TEC/MUL; Muhammad Farukh Ayoub/TEC/MUL; Salman Ahmad/TEC/RYK; Mohsin Bakhtyar/TEC/MUL; Ahsan Ul Haq/TEC/MUL; Nauman Ahmad/TEC/MUL; Muhammad Arslan Munir/TEC/MUL
Subject: RE: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::

 

Pls. remove HW sharing & alarm on BTS DDF

 

 

 

 

Sohail Siddiq |Tec-OAN CIII |+92-300-8431817

 

From: Sohail Siddiq/TEC/MUL
Sent: Friday, April 06, 2012 10:41 AM
To: Muhammad Wasim Hayat/TEC/MUL; Salman Ahmad/TEC/RYK (sa.a...@mobilink.net)
Cc: Hafiz Muhammad Imran/TEC/MUL; Muhammad Farukh Ayoub/TEC/MUL; Mohsin Bakhtyar/TEC/MUL; Ahsan Ul Haq/TEC/MUL; Nauman Ahmad/TEC/MUL; Muhammad Arslan Munir/TEC/MUL
Subject: RE: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::

 

Salman will coordinate

 

Dear Salman,

 

Pls. engage MS for handover

 

 

Sohail Siddiq |Tec-OAN CIII |+92-300-8431817

 

From: Muhammad Wasim Hayat/TEC/MUL
Sent: Friday, April 06, 2012 10:38 AM
To: Sohail Siddiq/TEC/MUL
Subject: RE: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::

 

01:00pm inshAllah!

 

Regards,

Muhammad Wasim Hayat

BSS Deployment CIII

+92-301-8731177

 

From: Sohail Siddiq/TEC/MUL
Sent: Friday, April 06, 2012 10:34 AM
To: Muhammad Wasim Hayat/TEC/MUL
Subject: RE: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::

 

Time:?

 

 

 

 

Sohail Siddiq |Tec-OAN CIII |+92-300-8431817

 

From: Muhammad Wasim Hayat/TEC/MUL
Sent: Friday, April 06, 2012 10:12 AM
To: TEC-CELL PLANNING CENTRAL II TEAM
Cc: TEC-DEPLOYMENT CENTRAL III TEAM; TEC-RF OPTIMIZATION CENTRAL III TEAM; TEC-PRODUCTION ENGINEERING CENTRAL III TEAM; Muhammad Arslan Munir/TEC/MUL; Asad Ullah Sarfraz/TEC/FSD; TEC-ENGG OPERATIONS MULTAN TEAM; Muhammad Yasir Maqbool/TEC/ISB; Waqar Ahmed Siddiqi/TEC/ISB
Subject: RUR0152_Chak Gaman Khan Wala_Commissioned & On-Air::::[PMCL , Capacity]::::

 

Dear Team,

 

RUR0152_Chak Gaman Khan Wala has been Commissioned & On-Air!

 

Dear Sohail,

 

Please arrange the HOTO tomorrow!!

 

 

 

Regards,

Muhammad Wasim Hayat

BSS Deployment CIII

+92-301-8731177

 

From: Muhammad Wasim Hayat/TEC/MUL
Sent: Sunday, April 01, 2012 8:48 PM
To: TEC-CELL PLANNING CENTRAL II TEAM
Cc: 'TEC-DEPLOYMENT CENTRAL III TEAM' (Deployment...@mobilink.net.pk); TEC-RF OPTIMIZATION CENTRAL III TEAM; TEC-PRODUCTION ENGINEERING CENTRAL III TEAM; Muhammad Arslan Munir/TEC/MUL (ARSALA...@mobilink.net); Asad Ullah Sarfraz/TEC/FSD
Subject: RUR0152_Chak Gaman Khan Wala_Commissioned & Locked::::[PMCL , Capacity]::::
Importance: High

 

Dear Team,

 

RUR0152_Chak Gaman Khan Wala has been Commissioned & Locked!

 

 

Regards,

Muhammad Wasim Hayat

BSS Deployment CIII

+92-301-8731177

 

From: Asif taj/TEC/MUL
Sent: Thursday, March 29, 2012 12:36 PM
To: TEC-NOC BSS SUPPORT ALCATEL TEAM; TEC-NOC NSS Support; MOHAMMAD SHABBIR; Sohail Siddiq/TEC/MUL; Shahzad Zaheer/TEC/MUL
Cc: TEC-DEPLOYMENT CENTRAL III TEAM; Muhammad Arslan Munir/TEC/MUL; TEC-PRODUCTION ENGINEERING CENTRAL III TEAM; Tahir Ul. Qayyum/TEC/MUL; Muhammad Aftab Tahir/TEC/MUL; Kamran Arif (kamra...@alcatel-lucent.pk); Yasir Hamayun (yasir....@hotmail.com); jawaad...@gmail.com; Tharwat.Ab...@alcatel-lucent.pk; TEC-RF OPTIMIZATION CENTRAL III TEAM; TEC-CELL PLANNING CENTRAL II TEAM; TEC-NSS FSD TEAM; TEC-ENGG OPERATIONS MULTAN TEAM; Umer Farooq/TEC/FSD; Aamir Younus/TEC/FSD
Subject: RFC::::RUR0152_Chak Gaman Khan Wala::::[PMCL , Capacity]::::
Importance: High

 

Dear NOC BSS Team,

 

Kindly create the subjected Site/ABIS as b/m & also unlock the ABIS.          [ALREADY DONE]

 

Site Name

Site Code

WO#

Deatil

Chak Gaman Khan wala

RUR0152

(New Portal) 2311442

BHP525E__MGWBHP_6

Kindly equipped it in one cabinet. Assign 161 as a Primary ABIS & 162 as a Secondary ABIS. Implement Retune WO RUR2041, RUR4267 & RUR7380.

 

 

Dear NOC NSS Team,

 

Kindly create the LAC/CID’s of the b/m New Site.       [ALREADY DONE]

 

·         RUR0152_Chak Gaman Khan Wala

 

CELL ID

10152

20152

30152

 

 

 

CELL ALOC

22062810152

22062820152

22062830152

 

LACOD

829

 

BHP525E__MGWBHP_6

LOC

Already Defined

HUW30MGW01BHP

OPC

 

Promotion ALOC

22

 

 

Dear Sohail,

 

Kindly do the needful for the connectivity of the New Site RUR0152 Chak Gaman Khan Wala. SID’s are attached herewith.

 

Dear Shahzad,

 

Kindly arrange your team for the urgent fuelling of the New Site RUR0152 Chak Gaman Khan Wala.      [ALREADY REQUESTED]

 

Dear Shabbir,

 

Kindly arrange your team for the Installation/Commissioning of the New Site RUR0152 Chak Gaman Khan Wala.

 

NOTE: SITE Commissioning Date is 30th March 2012.

 

Thanks.

 

Best Regards,

Asif Taj

BSS TEC-DEPLOYMENT CENTRAL-3

+92-0301-8630019

 

From: Syed Rameez Talat/TEC/ISB
Sent: Monday, March 19, 2012 10:25 AM
To: Asif taj/TEC/MUL
Cc: Muhammad Arslan Munir/TEC/MUL; TEC-DEPLOYMENT CENTRAL III TEAM; Muhammad Umar/TEC/ISB; Aamir Mahmood/TEC/FSD; Aamir Younus/TEC/FSD; Abid Bashir/TEC/MUL; Basharat Hamid/TEC/FSD; Fahid Imran/TEC/FSD; Hafiz Muhammad Raheel Aslam/TEC/FSD; Haris Sajjad/TEC/FSD; Khurram Arif/TEC/MUL; Muhammad Abid Pervaiz/TEC/MUL; Muhammad Asif Naveed/TEC/FSD; Muhammad Aslam/TEC/FSD; Muhammad Junaid Ashraf/TEC/BHP; Muhammad Waseem Sarwar/TEC/FSD; Rana Atif Rabbani/TEC/FSD; Sarmad Sarfraz/TEC/SGA; Tahir Mehmood/TEC/FSD; Usman Ahmad Khan/TEC/FSD; Waqas Ahmad Baig/TEC/FSD
Subject: FW: LAC & CID's Creation of 3 New Sites C-III Region.
Importance: High

 

Dear Asif,

CIDs were defined on firday evening. Please let us know in case of zero call issues, if any.

 

Regards,

Rameez Talat

 

 

From: Asif taj/TEC/MUL
Sent: Friday, March 16, 2012 4:41 PM
To: TEC-NOC NSS Support
Cc: Muhammad Arslan Munir/TEC/MUL; TEC-DEPLOYMENT CENTRAL III TEAM; Muhammad Umar/TEC/ISB; Aamir Mahmood/TEC/FSD; Aamir Younus/TEC/FSD; Abid Bashir/TEC/MUL; Basharat Hamid/TEC/FSD; Fahid Imran/TEC/FSD; Hafiz Muhammad Raheel Aslam/TEC/FSD; Haris Sajjad/TEC/FSD; Jamshaid Nawaz/TEC/RYK; Khurram Arif/TEC/MUL; Muhammad Abid Pervaiz/TEC/MUL; Muhammad Asif Naveed/TEC/FSD; Muhammad Aslam/TEC/FSD; Muhammad Junaid Ashraf/TEC/BHP; Muhammad Waseem Sarwar/TEC/FSD; Rana Atif Rabbani/TEC/FSD; Sarmad Sarfraz/TEC/SGA; Tahir Mehmood/TEC/FSD; Usman Ahmad Khan/TEC/FSD; Waqas Ahmad Baig/TEC/FSD
Subject: LAC & CID's Creation of 3 New Sites C-III Region.
Importance: High

 

Dear NOC NSS Team,

 

Kindly create the LAC/CID’s of the b/m 3 New Sites.

 

·         HWY0137_Chak 138 TDA

 

CELL ID

10137

20137

30137

40137

50137

00137

CELL ALOC

22060610137

22060620137

22060630137

22060640137

22060650137

22060600137

LACOD

439

 

MGH724E__MGWMGH_2

LOC

Already Defined

HUW29MGW01MGH

OPC

 

Promotion ALOC

22

 

 

 

·         RUR0152_Chak Gaman Khanwala

 

CELL ID

10152

20152

30152

 

 

 

CELL ALOC

22062810152

22062820152

22062830152

 

LACOD

829

 

BHP525E__MGWBHP_6

LOC

Already Defined

HUW30MGW01BHP

OPC

 

Promotion ALOC

22

 

 

 

 

 

 

 

 

 

 

 

 

·         MDL0253_Chak 96/1L

 

CELL ID

10253

20253

30253

 

 

 

CELL ALOC

72682910253

72682920253

72682930253

 

LACOD

833

 

RYK173E__GulshaneIqbal_1

LOC

Already Defined

HU11MGW01RYK

OPC

 

Promotion ALOC

72

 

 

 

 

 

 

 

 

 

 

 

 

Your prompt response is required.

 

Thanks.

 

Best Regards,

Asif Taj

BSS TEC-DEPLOYMENT CENTRAL-3

+92-0301-8630019

 

0152...png
0152..png
0152.png
0152-Sector down.png
0152-2-Sector down.png
RUR0152 Site Down.png

Awais Ahmed

unread,
Apr 6, 2012, 5:08:09 AM4/6/12
to alu-ex...@googlegroups.com, MOHAMMAD SHABBIR, Ali Saljuk, Zain Muhammad, Jawad Ali khan, fahad Zoraiz
Dear Shabbir Bhai


All HW is up at the moment only External LOW voltage alram reporting since 13.06 pm today

PFA



Regards 
Awais Ahmed Siddique J
0152 A and B pre.JPG
0152 C pre.JPG
0152Alarm.JPG
Reply all
Reply to author
Forward
0 new messages