On Sunday 05 May 2013, The Beez wrote:
> To resolve the first week of January, I did a little original programming.
> It requires a complete recalculation of the result though. I may find a
> method to optimize this, though.
I did, by reusing some existing code. The overhead is now about equal to the
last day of December.
As usual, code in SVN (USTODATE.4tH and ORDIDATE.4tH).
Hans Bezemer
--
I have no Facebook account. Consequently, I have no friends and I don't like
anything. Deal with it.
Visit our website!
http://thebeez.home.xs4all.nl/4tH/
*** Home of the 4tH compiler! ***