Time to complete of 2nd floor slab to 6th floor slab?

711 views
Skip to first unread message

amshree

unread,
Jun 30, 2011, 6:18:06 AM6/30/11
to 3C lotus boulevard
I am in Tower 25 and have just made the payment for 4th Installment -
construction of 2nd Floor Slab.

Can anyone pls tell me on when can I expect the next demand note
(construction of 6th floor slab)? How much time does it takes 3C to
move from 2nd floor slab to 6th floor slab? Is it like 1 month, 2
month, 3 month or more?

I need this so that I can plan my finances accordingly.

Thanks to all.
Amy.

sg...@subros.com

unread,
Jun 30, 2011, 6:25:57 AM6/30/11
to 3c-lotus-...@googlegroups.com, 3C lotus boulevard
It takes 21 days from One floor to next floor.so you calculate accordingly


Regards

S.S.GILL

|------------>
| From: |
|------------>
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|amshree <amrita...@gmail.com> |
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|------------>
| To: |
|------------>
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|3C lotus boulevard <3c-lotus-...@googlegroups.com> |
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|------------>
| Date: |
|------------>
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|30-06-2011 15:51 |
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|------------>
| Subject: |
|------------>
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|Time to complete of 2nd floor slab to 6th floor slab? |
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|------------>
| Sent by: |
|------------>
>--------------------------------------------------------------------------------------------------------------------------------------------------|
|3c-lotus-...@googlegroups.com |
>--------------------------------------------------------------------------------------------------------------------------------------------------|

Thanks to all.
Amy.


****************************************************************
*
************
DISCLAIMER: -

The information in this email is confidential and may be
legally
privileged. It is intended solely for the addressee.
Access to this email by anyone else is unauthorized. If you are
not intended recipient, any disclosure, copying, distribution
or
any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful.
This e-mail may contain viruses or other malicious code. Subros
has taken reasonable precautions to minimize this risk, but is
not liable for any damage you may sustain as a result of this e-
mail. You should carry out your own virus checks and/or other
precautions/controls before opening the e-mail or attachment.
Subros reserves the right
to monitor and review the content of all messages sent to or
from this e-mail address. Messages sent to or from this e-mail
address may be stored on the Subros e-mail system. The opinion
expressed in this mail is that of the sender and does not
necessarily reflect that of the Subros Ltd.

****************************************************************
*
************

nach...@gmail.com

unread,
Jun 30, 2011, 6:46:59 AM6/30/11
to 3c-lotus-...@googlegroups.com
Amy,

Its roughly 2.5 months as per 3C. Thanks
Sent from BlackBerry® on Airtel

Shobhit Mittal

unread,
Jun 30, 2011, 6:45:36 AM6/30/11
to 3c-lotus-...@googlegroups.com
For Tower 6, it was almost 10 days per floor. We got demand letter in exactly 1 month for 3 floors.

Regards,
Shobhit Mittal

anoop saxena

unread,
Jun 30, 2011, 6:57:12 AM6/30/11
to 3c-lotus-...@googlegroups.com
Hi,

You will get next demand in 2 months. 3Cs construction is taking 2 months approx for 4 slabs.

Regards
Anoop Saxena
--
Thanks & Best Regards
Anoop K. Saxena

Ankur Jain

unread,
Jun 30, 2011, 7:02:08 AM6/30/11
to 3c-lotus-...@googlegroups.com
In panache, 3C's has completed basement & Ground floor for my tower in flat 5 months (including excavation etc). Excavation & foundation takes the most time. So I do not think 3's would be taking 21 days per floor. My guess, it would be atleast 2 floors per month.

Regards,
Ankur

Aniruddha Baranwal

unread,
Jun 30, 2011, 9:02:04 AM6/30/11
to 3c-lotus-...@googlegroups.com
dear amy,
i have one in tower 23. i just got the demand note for 6th floor slab. The 2nd floor demand note was raised in march'11. So u can have a fair idea with that.
regards
Anirudh

amshree

unread,
Jun 30, 2011, 1:56:29 PM6/30/11
to 3C lotus boulevard
So it seems we all had different experiences and opinions. Ranging
from 21 days per floor to 10 days a floor. After I posted this here
on, I raised the same query with 3C. They said that it would take
approx 35 days before the next demand note. So its like 8 days a
floor! Pretty fast!

Good for us wrt possession and completion :) But bad for us wrt to
payments :(

But does 8 days a floor seems feasible?

Amy.

Om

unread,
Jun 30, 2011, 10:11:25 PM6/30/11
to 3c-lotus-...@googlegroups.com
If it is 8 days a floor how strong concrete will be ?

Any engineer Comment on this ?

Sent from my iPod

Navin Bansal

unread,
Jun 30, 2011, 10:47:47 PM6/30/11
to 3c-lotus-...@googlegroups.com
Yes.. it does look feasible when the definition of floor is just pillars and roof....
--
Thanks & Regards,
-Navin
425-443-7725 (M)

ajay

unread,
Jul 1, 2011, 10:47:28 AM7/1/11
to 3c-lotus-...@googlegroups.com
Should take about two to two and a half months... I am in Tower 21, and 4th installment was paid in early Apr, and next is due now..

On Thu, Jun 30, 2011 at 3:48 PM, amshree <amrita...@gmail.com> wrote:

Rakesh Bhatia

unread,
Jul 14, 2011, 8:28:50 AM7/14/11
to 3c-lotus-...@googlegroups.com
Dear Amy,
 
I am in Tower-8 , Phase 4 and received allotment letter just now.
 
3rd Payment is after 90 Days from allotment and 4th Payment will be basis 2nd Floor Roof Slab completion. As you have already made 4th Payment... what's the time gap between 3rd & 4th payment basis your expeince.
 
Appreciate Quick repsonse as need to manage funds accordingly.
 
Rakesh

Rakesh Bhatia

unread,
Jul 14, 2011, 11:32:43 PM7/14/11
to 3c-lotus-...@googlegroups.com, amrita...@gmail.com
Hi
 
Request members to help in knowing the details.
 
Rakesh

Manish Aggarwal

unread,
Jul 21, 2011, 3:36:42 AM7/21/11
to 3c-lotus-...@googlegroups.com, amrita...@gmail.com
Hi Rakesh,

In my case it took almost a year to get the demand note of the 4th installment.

I guess, you can safely assume 3-6 months time frame ... 
Reply all
Reply to author
Forward
0 new messages