|
Dear friends,
Please find below few points , to be discussed during next meeting, please also add if any.
1. Floor Plan/Unit Plan with all dimensions (should include passage/cubboard/ etc.) for all types of flats (all towers/types of apartments that are launched till date).
2. Clarification on Insulation(better if they explain what it will be and how it will be useful)
3. Clarity on carpet as well as super area calculation.
4. No of Elevator in each tower and quality of those elevators.(In common facility this should be v imp and lifeling in highrise buildings we should ask 3 C to spl take of this and should have provision to open to nearest floor in case of power failure).
5. In principal agreement that there will be option to buy additional parking (s) at a price lower than what is charged for the first parking.
6. Minimum one 6 months warranty on all finishing and one year warranty on critical fixtures such as wiring, drainage, water. warrant to start from the date of offer of possession .
7. What shall be phylosophy for uniform water distribution in high rise tower for sanitary as well as drinking?
8. Buyer seller Agreement should also have green building concept clause.
9. Builder should take responsibility for concluding issue if broker does not provide discount after the desired payment from client side, as builder has given direct discount to lot of clients.
10- Backup calculation for loading on the basis not more than 30%.
Regards M.K.GOYAL
|
We need to look in two ways
(Category A) how a normal houses day to day functions will be easily managed
(Category B) How to make this entire place an exciting place to live.
Category A
1. Availability of drinking water ( 24X 7) and alternate resources
2. Availability of correct electrical fitting at correct location (especially for washing machine which generally get in to trouble )
3. Softening of ground water as Noida ground water is hard.
4. Facility to dry washed cloths
5. Covered balconies as option at higher floors and if possible standardize the design. If this is allowed at later stage ( after completion) each and every house will use their own design and thereby the look and feel of the building will go bad.
6. Do they have plans to install any security system at each house. If not, can it be added as an option ? It will reduce the cost.
7. Press wala booth at specified places.
8. Intercom
9. Internet and TV cables at multiple places.
10. Size of provision in windows for fitting window AC ( if required)
Category B
1. We need their support plan to manage seepage related issues at least for three years.
2. We need a plan on involving the section of members from Day 1 in their maintenance plan so that we ensure a smooth handover to members ( in case planned) at a later stage easily.
3. External water supply ( Jal Board) connections, quantity of water expected need to be assertained as more towers and less water will be an issue here.
4. How the ground water will be used needs to be planned. As Noida water is hardwater if it is not softened before mixing with the Ganaga water ( if it comes in that area) supplied from jal board, then the entire water quality goes for a toss.
5. RO water plan ( if any)
6. Fire fighting equipments and Clearance from fire fighting department obtained or Not ? ( we do not know whether Noida fore fighting stations have the capacity to fight fire in highrise buildings.
7. No more addtional floor's and no addtion of penthouses on the top at a later stage.Meaning no chage to what even bulding plan model kept in the site.
8. How many parkings planned in total. How the growth of cars and need of parking space be managed in future.
10. Clarity on insulated roofs and walls . When they say green building, then why it is optional? If optional what is the catch here?
13. Possibility of reusing the waste water from houses after treatement for garden and other works.
14. possibility of including automatic car wash booths at multiple places
regards,
Krish